Pradhan Mantri Gram Sadak Yojana Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date21 Sep 2019
Closing Date26 Sep 2019
Tender Amount₹ 72,73,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compaction to the required density grading-II as per Technical Specification Clause 405. B) With Gr. II metal

38.68

-

2600

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the interstices of coarse aggregate, watering and compaction to the required density grading-III as per Technical Specification Clause 405. B) With Gr. III metal

122.48

-

2750

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 to 1.0 kg per sqm using mechanical means as per Technical Specification Clause 502

1586.25

-

45

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503

10961.25

-

15

... More
Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregate either using penetration grade bitumen or emulsion to required line, grade and level to surve as wearing course on a previously prepared base, including mixing in a suitable plan, laying and rolling with a three wheeler 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification clause. Case-II By Mechanical Means. Ii) Bitumen (S-90).

10961.25

-

185

... More
Providing and laying seal coat sealing the voids in a bituminous surface layed to the specified levels, grade and cross fall using Type A or Type B or Type C as per Technical Specification clause (B) By Mechanical Means. Case-II Type -B (i) Bitumen (S-90).

10961.25

-

80

... More
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawing and Technical Specification clause 1701.

3190

-

0.32

... More
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801.(iii) 60 cm equilateral triangle.

5

-

3000

... More
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801.(iii) 60 cm circular

5

-

3000

... More
Kilometer Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (ii) Ordinary Kilometre Stone (precast)

4

-

1912

... More
Kilometer Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (iii) 200 m stone (precast)

12

-

526

... More
Reinforced cement concrete M15 grade boundary pillers/ local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

28

-

500

... More
Earthwork in excavation for structures as per drawing and technical specification Clause 305.1 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matterial and disposal up to a lead of 50 m, dressing of sides.

340.17

-

61

... More
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. A.With crushed stone.

46.43

-

4700

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.

265.8

-

3500

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

128.88

-

140

... More
Plain/Reinforced Cement Concrete in substructure complete as per drawings & Technical Specification Clause 802,804,806,807,1202 and 1204.

60.7

-

6800

... More
Supplying, fitting and placing TMT (Fe 500 D) reinforcement bar ( From Primary Producer :TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel/RINL) in sub-structure complete as per drawing and technical specifications clauses 1002,1005,1010 & 1202.

4.62

-

67000

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification clauses 614,709, 1204.3.7.

131

-

150

... More
Providing and fixing 2 mm thick corrugated copper plate in expansion joint as per drawing and Technical specification clause 1207.2.2.

99

-

316

... More
Routine Maintenance: Routine Maintenance after completion (1st Year)

2.9

-

26000.04

... More
Routine Maintenance after completion (2nd Year)

2.9

-

33000

... More
Routine Maintenance after completion (3rd Year)

2.9

-

116000

... More
Routine Maintenance after completion (4th Year)

2.9

-

138000

... More
Routine Maintenance after completion (5th Year)

2.9

-

186999.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.