Numaligarh Refinery Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Numaligarh Refinery Limited - NRL Tender

Works
Eprocure
Opening Date8 Sep 2021
Closing Date28 Sep 2021
Tender AmountRefer Documents 
Notes
Download

Summary

Dismantling Of Buildings Tanks And Allied Facilities Part Ii

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For heights above 4m to 10m from the ground

94

-

-

... More
For heights beyond 10m from the ground

5

-

-

... More
Dismantling of brick walls , partition walls in Buildings, Collecting, Shifting and Storage of Dismantled material at designated place including Scaffolding, Barricading and other safety measures. Brick work demolition (brick, hollow / solid blocks- full or half brick walls) work includes dismantling of doors, windows, ventilators, partitions, jolly works, grill works, rolling shutters, conduits, electrical wirings, fitting / fixtures, wood works, if any, skirting, dadoing, tiles, stone cladding, etc, which are associated with brick walls. Note for Measurement : 1. Actual quantity measured in sq.m (length x height) including doors,windows,ventiloators etc., included in the Area measurement. 2. No deduction shall be made for the opening of door, windows,and ventilators in the wall 3. Doors , windows,ventilator frame and panels shall be removed properly from the wall before demolition of wall and placed at designated area. 4. No seprate payment shall be made for removal / shifting of Doors , windows,ventilator frame and panel. Rate for such activities shall be included in this item 5. Rate for demolition of RCC lintel, sill , window chajja shall be included in this item only. No seprate measurement shall be taken for these.

-

-

-

... More
For heights upto 5.5 m

5655

-

-

... More
For heights above 5.5m

660

-

-

... More
Dismantling of Steel Structures elements , Collecting, Shifting and Storage of Dismantled material at designated place including Scaffolding, Barricading and other safety measures. Structural steel dismantling work includes columns, beams, trusses, bracings, purlins, pipe supports, platforms, built-up sections, crane girders, grating, chequered plates, ladders, hand rails, staircases, Steel gates etc Note for Measurement : Actual weight quantity in Mton measured with steel unit weight 7850 kg/cum

-

-

-

... More
Structural steel sheds/structures building

1894

-

-

... More
Structural steel storage tanks consisting of plates and steel work

10

-

-

... More
Dismantling of Roofing and Side Cladding, Collecting, Shifting and Storage of Dismantled material at designated place including Scaffolding, Barricading and other safety measures.GI Sheet quantities includes roofing, side cladding, Ridge sheet, false ceilng , thermal insulation, transulcent sheets, louvers, fixings, down pipes, gutters, flashing and accessories, doors, windows, ventilators, etc Note for Measurement : Actual quantity of roofing ( roof slope dimention x length ) / side sheeting (length x height)

-

-

-

... More
Roof Sheeting

11146

-

-

... More
Side Sheeting

100

-

-

... More
Dismantling of Flooring and Plinth Fill (at ground floor level) Collecting, Shifting and Storage of Dismantled material at designated place including Scaffolding, Barricading and other safety measures. Building Flooring demolition includes RCC / PCC floor slab, floor finish, Flase flooring, screeds, tiles, marbles, trenches, if any in the floor, chequered plate / grating cover, insert plates, any pipe or E & I supports attached, etc. Plinth filling quantities in buildings includes the items over FGL only, including sand, backfill, rubble soling/ Murrum/Gravel filling etc. Note for Measurement : Actual quantity of Flooring Area ( Carpet Area) / Plinth filling (Fill Area x height)

-

-

-

... More
RCC / PCC Ground Floor with tiles, screed , marble etc inclusive

15720

-

-

... More
Plinth Fill materials

120

-

-

... More
Dismantling of false flooring , false ceiling , dry wall , wall made with particle boards, aluminum partition with glass panels

176

-

-

... More
Area Clearance including removal of chain link fence, overhead sintex water tank, sanitory & plumbing piping and items / fittings, under gorund and overground cables etc. and removal of, cables, saleable / non-saleable scrap / debris / shrubs followed by levelling of ground as per Engineer In Charge instructions Measurement : Actual plot Area levelled

100

-

-

... More
Dismantling of concrete for above ground only by using dry cutting diamond blades, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects and to the satisfaction of Engineer-in charge. Contractor needs to take approval of cutting plane from Engineer In Charge before dismantling.

-

-

-

... More
Dismantling using diamond cutter

10

-

-

... More
Loading, disposal and unloading of all kinds of debris materials through dumper /trailer, generated during dismantling of building and structures outside the NRL refinery and NRMT premises beyond NRL exit gate on per MT per KM basis. Debris to be suitably covered at the top to minimize spreading of dust during transportation. Also following to be considered by Contractor while quoting the unit rate for this item. a). For the purpose of measurement, zero distance shall be reckoned from disposal area outside the Refinery premises to the nearest Exit gate of the Refinery/NRMT. b). Distance (in KM)of disposal of each location to be agreed with Engineer in Charge and recorded before starting of disposal to that location. Fraction of KM to be rounded off to the nearest whole number. c).Disposal Quantity = MT of the debris materials disposed beyond Refinery premises X Distance of disposal location in KM as defined in point(a) above d). The estimated Quantity for this item is assuming disposal location is at a distance of 1KM outside the NRL refinery exit gate. If this distance changes, quantity will also change accordingly.

-

-

-

... More
Loading, disposal and unloading of all kinds of debris materials

4000

-

-

... More
Dismantling and Reinstallation of Existing PEB shed as per instructions of Engineer In Charge (EIC) by using salvagable items such as steel structures, Roof & Wall Sheet, doors and windows, down take pipes etc. Providing required necessary accessories like fasteners and application of touch up painting if required are included in Bidders scope includibg manpower , machineries, scaffolding and non shrink grout into the new shed etc. Measurement shall be done based on the area of Reinstalled building in Square Meters(SQM)

7698

-

-

... More
RCC Concrete work: Providing and laying in situ Reinforced Cement Concrete of M30 grade (design mix)using 20 mm and down size graded stone aggregates including providing pockets / shear keysduring concreting, vibrating, tamping curing addition of plasticizers, including bi-polar corrosion inhibitors, and rendering if required to give a smooth and even surface etc.The scope of work includes Excavation, dewatering, compaction, PCC, Form Work, fixing of Anchor Bolts in position and any other work required to complete the job as per directions of Engineer-in-charge. Re-bar shall be paid separately. Measurement shall be done based on finished concrete in Cubic Meter (CUM)

500

-

-

... More
Reinforcement Steel: Supplying & placing in position TMT / or Equivalent (Reinforcement conforming to IS-1786, Grade Fe-500D) for all type of RCC structures including cleaning, decoiling, cutting, bending to required shape and lengths, binding as per drawing and details, binding with 16 SWG black soft annealed binding wire supplying and straightening, placing with proper cover block, support chairs, overlaps, spacers, etc. complete in all respect as directed by EIC. Payment will be made as on length basis (actual or theoretical as per drg. whichever is less) and converted into weight by using standard IS coefficient (rolling margins, wastages, couplings, welded joints, spacer bars, stays, hangers, annnealed steel wire or other methods of binding and placing shall not be measured and not paid separately. Only authorised laps and chairs shall be measured and paid) Measurement shall be in Metric Ton (MT)

63

-

-

... More
Supplying, fabricating and fixing in position anchor bolts, foundation bolts Grade IS 2062 Grade BR (bolt assembly supplied by contractor ) in line & level as per drawing complete including application of grease and covering with plastic cover. (Necessary templetes, handling & positioning is in scope of civil Sub-contractor for fixing bolts & quoted rates includes the same)

4

-

-

... More
Dismantling of electrical cables, collecting, Shifting and Storage of Dismantled material at designated places including Scaffolding, Barricading and other safety measures. This dismantled items include removal of all types of cables like power, control, fibre optics etc.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.