Northeast Frontier Railway Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Northeast Frontier Railway - NFR Tender

Works
Electrical and Electronics
Electrical Works
Ireps
Opening Date29 Jan 2025
Closing Date20 Feb 2025
Tender Amount₹ 2,52,23,658.6 
Notes
Download

AI Insights

Technical Capacity
... View More
The required prior work experience for the bidder is related to the credentials of the partnership firm. The bidder must have successfully completed any of the following during the last 07 (seven) years: - Three similar nature of works each costing not less than 30% of the advertised value of the tender, - Two similar nature of works each costing not less than 40% of the advertised value of the tender, - One similar nature of work each costing not less than 60% of the advertised value of the tender. In case of tenders for composite works, the bidder must have successfully completed any of the following during the last 07 (seven) years: - Three similar nature of works each costing not less than 30% of the advertised value of each component of the tender, - Two similar nature of works each costing not less than 40% of the advertised value of each component of tender, - One similar nature of work each costing not less than 60% of the advertised value of each component of the tender. For subletting of work, the subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years. However, for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for. The similar nature of works for this instant tender shall be “Supply, installation, testing and commissioning of any LT/HT electrical work.” The tenderer should have executed the similar nature of works in Central /State Government department or PSUs of Central /State Government. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of the remaining partnership firm shall be re-worked out. The credentials of the partnership firm shall get enhanced to the extent of credentials of newly added partner(s). If a work is started prior to 7 years but completed in the last 7 years, it shall be considered for fulfillment of credentials. A work is considered substantially completed if payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation) has been made to the contractor. The credential certificate for substantially completed work should have been issued not prior to 60 days of the date of invitation of the present tender. The value of similar works completed can be calculated based on the final bill (gross amount) including the PVC amount (if paid) for completed work, and the total gross amount already paid, including the PVC amount (if paid), for substantially completed work. The percentages of similar works completed are 30%, 40%, and 60% of the advertised value of the tender, and 35% for subletting of work. The amount for subletting of work is up to Rs 50 lakh.

Costs

Summary

Repair And Replacement Of H.m Tower & Luminaries, Panel Board And All Related Accessories At Goods Yards For Round The Clock Loading And Unloading Facilities Over Lmg Division .

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply ,fitting,fixing connection of steel rope for high mast tower

300

125

37500

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 5 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site.

1700

30

51765

... More
Excavation of cable trench below the GL with laying of armoured cable and refilling 6 the same by supply of Brick, Sand and riddled Soil after digging the earth as per direction of Engineer at site & connection of armoured Cable by supply and fixing of crimping lugs etc. As per attached CEGE/NFR DRG NO: PCEE/ELG/DRG/2024/2 dated04.10.2024 & as per Technical circular no. EL/PS/2024/2 (Standardization of Drawing for power cable laying direct underground)

1500

50

75075

... More
HDD Machine for horizontal boring in Railway Track Embankment at a 7 minimumdistance of 6mtr from the enbankment GL and depth of 2.0 mtr below from GL with preparation of site for boring by placingof pipes for electric cable protection through contractors own arrangement. a. 120 mm dia hole from station building panel to BENA yard

300

6122

1836600

... More
Supply and laying of CI Pipe, (Class B),100 mm dia conforming to IS:1536/2001 with amendment No 1&3.

300

796

238824

... More
Supply and fixing of HDPE pipe of out side dia 110mm, 6kgf/cm2, 6.0 mtr each length 9 and threaded to match with Tee, Elbow, Union and Socket etc conforming to IS 4984/1995 clamped with pole/truss/bracket made of galvanised flat of size 50x6mm with galvanised nuts & bolts of size 50x12mm as per direction of Engineer In Charge at site.

350

344

120487.5

... More
Supply, fabrication, erection of dust & vermin proof, rodent proof, chemically treated, 10 dry powder coated cubical 8 way double door panel board made of 16SWG CR/MS sheet with electrolytic grade 4 pole 300A copper bus on suitable size MS angle frame complete with cable alleys, metering module with allinternal connection to be done by suitable size copper wire/strip connection comprising the following :-

3

73940

221820

... More
a. Supply and installation of MCCB 160 Amps 4pole 36KA Ics=100%Icu with adjustable thermal magnetic setting confirming to IS: 13947-II. 2nos

6

20870

125220

... More
b. Supply and installation of Onload Change Over Switch 200A, 4Pole (Manual- Transfer-Swicth ) without enclosure

3

14700

44100

... More
c. Supply and installation of MCCB 125 Amps 4pole 25KA Ics=100%Icu with adjustable thermal magnetic setting confirming to IS: 13947-II. 2nos

6

15900

95400

... More
d. Supply & erection of MCCB 63 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II. 2nos

6

12600

75600

... More
Manufacturing, supply, erection, testing and commissioning of Feeder pillar equipped with RYB LED indication lamps and three phase & Neutral bus bar aluminum capable for min 200 15 Amp capacities for each phase and Neutral. Size of feeder panel box 1000 mm height x 600 mm width x 350 mm depth and feeder pillar to be grouted on ground with help of four no mounting angle af size 50x50x6 mm of length 500 mm the cost should also be include the cost of end cable termination with proper size cable lug & cable glands.

10

19472

194721.1

... More
a. Supply & erection of MCCB 100 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II. 2nos 17

10

12600

126000

... More
Supply of LT cable termination kit for 120 sqmm 4 core AL cable 18

10

2930

29300

... More
Supply of LT cable termination kit for 95 sqmm 4 core AL cable

20

2930

58600

... More
Supply of high mast tower 12 Mtr height with its accessories. Mast shall be in onesection, hot dip galvanized, Ring sizeminimum 60mm OD, minimumgalvanization = 85micron. suitable for windZone-4 airvelocity as per IS-875, andsheet thickness should be 6 mm includingaccessories like head frame, steel wirerope 6 mm dia (7/19 construction), trailingcable, 19 double drum winch, galvanizedlantern carriage arrangement suitable for 6luminaries symmetrically boxes andlightning finial. The mast shall have anintegral power tool installed inside thebase compartment for its operation.(Bidder must submit wind tunnel testcertificate as per IS-875 as well asauthorization letter from principalmanufacturer after issue of LOAand beforeexecution of work. Warranty certificate oftower, Type test certificate & qualityassurance plan certificate, Design offoundation plan and drawing from OEM tobe furnished before execution of work.)

12

116670

1400049.84

... More
Supply, fitting & fixing of foundation bolts minimum 8 nos, minimum bolt dia 25 mm and minimum bolt length 750 mm manufactured from special steel along with its nuts, washers, anchor plates of minimum thickness 20 mm and templates complete set.

12

2530

30363.96

... More
SITC of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.

12

1021

12256.68

... More
Design and casting of suitable shallow foundation with M-20 concrete (1:1.5:3) for 20 22 mtr high mast considering the safe soil bearing capacity as found at site and as per technical specification attached. Before designing and casting of shallow foundation, testing of soil bearing capacity for erection of high mast tower and the test report of soil bearing capacity of the formation site to be submitted from recognised testing laboratries/Institution before execution of work.

12

23164

277972.08

... More
Supply, testing & commissioning of Control panel(outdoor type) with drive switch 23 housing 32 Amps TPN MCB incoming, single dial timer contractor circuit for the automatic control of luminaires, outgoing terminals and control circuit for the power tool motor complete set .The control panel shall also consist of astronomical time switch with accessories for automatic switching of luminaries

12

11303

135642.96

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 24 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.

120

17244

2069376

... More
Supply of high mast tower 12 Mtr heightwith its accessories. Mast shall be in onesection, hot dip galvanized, Ring sizeminimum 60mm OD, minimumgalvanization = 85micron. suitable for windZone-4 airvelocity as per IS-875, andsheet thickness should be 6 mm includingaccessories like head frame, steel wirerope 6 mm dia (7/19 construction), trailingcable, 25 double drum winch, galvanizedlantern carriage arrangement suitable for 6luminaries symmetrically boxes andlightning finial. The mast shall have anintegral power tool installed inside thebase compartment for its operation.(Bidder must submit wind tunnel testcertificate as per IS-875 as well asauthorization letter from principalmanufacturer after issue of LOAand beforeexecution of work. Warranty certificate oftower, Type test certificate & qualityassurance plan certificate, Design offoundation plan and drawing from OEM tobe furnished before execution of work.)

10

116670

1166708.2

... More
Erection of high mast tower with the help of suitable equipments & wiring of luminaries with supply of necessary wiring materials as per IS.

10

16294

162943

... More
Repair and Replacement of OperatingMechanism of HM Tower gear ratio 53:1 ,withminimum working load not less than 375 Kg,HM tower lantern carriage and including allaccessories. The whole work shall beexecuted as per direction of Engineer incharge at site.

7

17312

121186.31

... More
Excavation of cable trench below the GL with laying of armoured cable and refilling 28 the same by supply of Brick, Sand and riddled Soil after digging the earth as per direction of Engineer at site & connection of armoured Cable by supply and fixing of crimping lugs etc. As per attached CEGE/NFR DRG NO: PCEE/ELG/DRG/2024/2 dated04.10.2024 & as per Technical circular no. EL/PS/2024/2 (Standardization of Drawing for power cable laying direct underground)

5000

50

250250

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 29 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site.

5000

30

152250

... More
Supply, Installation, Testing and Commissioning of of 63 mm of HDPE pipes of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995 31

285

86

24720.9

... More
Supply and installation of GI pipe dia 80 mm class B

72

1000

72046.08

... More
HDD minimumdistance of Machine 6mtr from the for enbankment horizontal boring in GL and depth Railway of 2.0 Track mtr Embankment below from GL at witha preparation of site for boring by placingof pipes for electric cable protection through contractors own arrangement. a. 120 mm dia hole from station building panel

200

6122

1224400

... More
Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness. The GI Strip ( should be welded with the earth pipe. The pipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an 47 effective earth value.The connecting conductor from earth electrode to the distribution panel board should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC and The values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO: PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as per Technical circular no. EL/PS/2024/1 (EARTHING SYSTEM).

20

1581

31624

... More
Making of foundation for DG set 1.65m x 3.7 m x 0.3 m by cement concrete with CC in proportion of 1:2:4 stone chips, cement and sand etc. as per instruction of site incharge. All consumables will be supplied by the contractor as per the direction of engineer in charge at site.

1

8490

8490.36

... More
Making of Dyna Roof shed for DG (2X4 ) Sq.m at NJN i.e. Supply & installation of 49 precoated galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50mm +/- 5% total coated thickness (TCT) thick Zinc coating 120gsm as per IS:277 in 240mpa steel grade, 5-7microns(including all other accessories). 50

2

5320

10641.6

... More
Supply,fitting fixing of 125 A onload Changeover switch with enclosure

2

15900

31800

... More
Supply of 16 mtr long high mast systemwith its all accessories and suitableequipments. Mast shaft shall be in twosections, hot dip galvanised and suitablefor wind velocity as per IS: 875 part 3. Itshall also include accessories for high mastincluding head frame, 3/4 51 point suspensionsystem with steel wire rope 6 mm dia(7/19 construction) double drum winch,galvanised lantern carriage arrangementsuitable for 9 luminaries symmetrically &its control gear boxes & lightning finial.The mast shall have an integral power toolinstalled inside the base compartment forits operation. (The designing of high masttower foundation should be done aftertesting of soil bearing capacity andapproved by the competent authority).

5

148737

743685

... More
Supply, fitting, fixing, testing, installation, wiring & commissioning of 45 Watt outdoor type LED street light fitting made up of pressure die cast aluminum housing with high power LED as 52 lighting source and lens embedded PC cover having TOP Opening separate driver compartment with IP66 protection and impact resistance of IK07. The street light must be conforms to the technical specification i.e. attached in the tender document. The whole work shall be executed as per direction of Engineer in charge at site.

30

3995

119853.9

... More
Supply, fitting, fixing, connection & commissioning of 160 watt LED flood light,IP-65 fitting complete set with pressure die cast aluminium housing and other accessories.

60

7684

461099.4

... More
Supply and erection of control panel housing suitable for control circuit for the operation of the mast, it shall also consist of suitable control for the power tool motor for doing upper & lower including time switch for 50%& 100% opertion of luminaries also including automatic switching ON/OFFsystem.

25

7932

198319

... More
Supply of foundation bolts manufactured from special steel along with nuts, washers, anchor plates and templates and fixing for high mast towers.

10

5077

50774.4

... More
Supply, of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.

10

1021

10213.9

... More
Design and casting of suitable shallow foundation with M-20 concrete (1:1.5:3) for 20 57 mtr high mast considering the safe soil bearing capacity as found at site and as per technical specification attached. Before designing and casting of shallow foundation, testing of soil bearing capacity for erection of high mast tower and the test report of soil bearing capacity of the formation site to be submitted from recognised testing laboratries/Institution before execution of work.

10

23164

231643.4

... More
Erection of high mast tower with the help of suitable equipments & wiring of luminaries with supply of necessary wiring materials as per IS.

10

16294

162943

... More
Repair and Replacement of OperatingMechanism of HM Tower gear ratio 53:1 ,withminimum working load not less than 375 Kg,HM tower lantern carriage and including allaccessories. The whole work shall beexecuted as per direction of Engineer incharge at site.

25

17312

432808.25

... More
Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness. The GI Strip ( should be welded with the earth pipe. The pipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an 60 effective earth value.The connecting conductor from earth electrode to the distribution panel board should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC and The values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO: PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as per Technical circular no. EL/PS/2024/1 (EARTHING SYSTEM).

30

1581

47436

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 61 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per the instructions of Engineer in charge at site.

3000

30

91350

... More
Excavation of cable trench below the GL with laying of armoured cable and refilling 62 the same by supply of Brick, Sand and riddled Soil after digging the earth as per direction of Engineer at site & connection of armoured Cable by supply and fixing of crimping lugs etc. As per attached CEGE/NFR DRG NO: PCEE/ELG/DRG/2024/2 dated04.10.2024 & as per Technical circular no. EL/PS/2024/2 (Standardization of Drawing for power cable laying direct underground)

3000

50

150150

... More
Supply, fabrication, erection of dust & vermin proof, rodent proof, chemically treated, 63 dry powder coated cubical 4 Way double door LT panel board made of 16SWG CR/MS sheet with electrolytic grade 4 pole 250A copper bus on suitable size MS angle frame complete with cable alleys, metering module with allinternal connection to be done by suitable size copper wire/strip connection comprising the following :-

1

58990

58990

... More
a. Supply & erection of MCCB 100 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II

1

12600

12600

... More
b. Supply & erection of MCCB 63 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II

2

12600

25200

... More
c. Supply & erection of MCB 40 A, DP 'C' Curve, Ics=100% Icu, conforming to IS/IEC60898-II

1

1316

1316

... More
HDD Machine for horizontal boring in Railway Track Embankment at a minimumdistance of 6mtr from the enbankment GL and depth of 2.0 mtr below from GL with preparation of site for boring by placingof pipes for electric cable protection through contractors own arrangement. a. 120 mm dia hole from station building panel

-

-

67

... More
Supply and laying of CI Pipe, (Class B),100 mm dia conforming to IS:1536/2001 with amendment No 1&3.

300

796

238824

... More
Supply and fixing of HDPE pipe of out side dia 110mm, 6kgf/cm2, 6.0 mtr each length 69 and threaded to match with Tee, Elbow, Union and Socket etc conforming to IS 4984/1995 clamped with pole/truss/bracket made of galvanised flat of size 50x6mm with galvanised nuts & bolts of size 50x12mm as per direction of Engineer In Charge at site.

2000

344

688500

... More
Supply erection and replacement of 50 mm dia "B" Class Heavy duty GI earthing pipe. (IS -1239.2004)

100

441

44100

... More
"Fabrication, design, supply, erection and commissioning of fencing of Hi-Mast tower with MS angle of size (75 x 75 x 5) mm. The size of fencing shall be 4 mtr x 4 mtr & height of fencing shall be 2.5 mtr above GL. The MS angles shall be put to a depth of 0.5 mtr below GL. The MS angles will also be used for top & bottom runner of fencing on 3 sides. (Total Qnty of MS angle to be used in the work shall not be less than 62 mtr). There shall be CC foundation block for supporting the MS angle structure. The size of each CC block shall be 0.250 mtr x 0.250 mtr and depth of each CC block shall be 0.5 mtr below GL and height of each CC block shall be 0.250 mtr above GL.( There shall be a total of seven(7) Nos of such CC blocks in the said work.). CC shall be in proportion 1:2:4 with stone 71 chips of maximum aggregate size 20 mm and less including cement, sand.etc. The fencing shall be covered on all sides by Gl flat of size (25x3) mm in square mesh design .(total qnty of GI flat to be used in the work shall not be less than 417.25 Mtr). The MS angles and GI flat are to be welded properly with each other to make the fencing strong. There shall also be provision of two part/double leaf hinged door locking arrangement on one side of the fencing. The door shall also be fabricated from MS angles of size (75x75x5) mm and Gl flat of size (25x3) mm in square mesh design and fitted with MS sliding door bolts bright satin finish orblack stone enameled of size (300 x16) mm with nuts/screws etc. The MS angles shall also be cleaned of any dust/oily/grease impurities and then painted by one coats of aluminium paint of any ISI marked quality. The entire work to be executed as per direction of engineer in charge at site."

10

20583

205834.3

... More
Making of foundation for DG set 1.65m x 3.7 m x 0.3 m by cement concrete with CC in proportion of 1:2:4 stone chips, cement and sand etc. as per instruction of site incharge. All consumables will be supplied by the contractor as per the direction of engineer in charge at site.

2

8490

16980.72

... More
Making of Dyna Roof shed for DG (2X4 ) Sq.m at NJN i.e. Supply & installation of 73 precoated galvanized iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50mm +/- 5% total coated thickness (TCT) thick Zinc coating 120gsm as per IS:277 in 240mpa steel grade, 5-7microns(including all other accessories). 74

2

5320

10641.6

... More
Supply and installation of 100 Amp MCCB 36 kA breaking capacity 75

10

14900

149000

... More
Supply and installation of 100 A COS with enclosure

10

10500

105000

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 76 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site. for JRBM Goods yard

800

30

24360

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 77 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.

30

17244

517344

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per the instructions of Engineer in charge at site. 79

1800

30

54810

... More
Supply ,fitting,fixing connection of steel rope for high mast tower

800

125

100000

... More
Replacement of control panel with suitable rating of MCB (4 Pole 25-32 A) 80 ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete.

8

9087

72703.92

... More
SITC of 1.5 HP squirrel cage induction motor , 4 pole 1500 RPM , 3 phase with suitable gear for high mast tower

8

18125

145000

... More
Supply, of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.

15

1021

15320.85

... More
Excavation of cable trench below the GL with laying of armoured cable and refilling 83 the same by supply of Brick, Sand and riddled Soil after digging the earth as per direction of Engineer at site & connection of armoured Cable by supply and fixing of crimping lugs etc. As per attached CEGE/NFR DRG NO: PCEE/ELG/DRG/2024/2 dated04.10.2024 & as per Technical circular no. EL/PS/2024/2 (Standardization of Drawing for power cable laying direct underground)

1000

50

50050

... More
HDD Machine for horizontal boring in Railway Track Embankment at a 84 minimumdistance of 6mtr from the enbankment GL and depth of 2.0 mtr below from GL with preparation of site for boring by placingof pipes for electric cable protection through contractors own arrangement. a. 120 mm dia hole from station building panel

100

6122

612200

... More
Supply and laying of CI Pipe, (Class B),100 mm dia conforming to IS:1536/2001 with amendment No 1&3.

100

796

79608

... More
Supply, Installation, Testing and Commissioning of of 63 mm of HDPE pipes of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995

1000

86

86740

... More
Supply, fabrication, erection of dust & vermin proof, rodent proof, chemically treated, 87 dry powder coated cubical 6 Way Double door panel board made of 16SWG CR/MS sheet with electrolytic grade 4 pole 250A copper bus on suitable size MS angle frame complete with cable alleys, metering module with allinternal connection to be done by suitable size copper wire/strip connection comprising the following :-

3

68745

206235

... More
a. Supply & erection of MCCB 100 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II,

3

12600

37800

... More
b. Supply and installation of Onload Change Over Switch 100A, 4Pole (Manual- Transfer-Swicth ) without enclosure,

3

6880

20640

... More
c. Supply & erection of MCCB 63 A, 4-pole, 25KA, Ics=100% Icu, conforming to IS:132947-II, 91

12

12600

151200

... More
Supply,fitting,fixing of LT busbar chamber 100 Amps

2

11610

23220

... More
Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness. The GI Strip ( should be welded with the earth pipe. The pipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an effective earth value.The connecting conductor from earth electrode to the distribution panel board 92 should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC and The values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO: PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as per Technical circular no. EL/PS/2024/1 (EARTHING SYSTEM).

15

1581

23718

... More
Design and casting of suitable shallow foundation with M-20 concrete (1:1.5:3) for 93 high mast considering the safe soil bearing capacity as found at site and as per technical specification attached. Before designing and casting of shallow foundation, testing of soil bearing capacity for erection of high mast tower and the test report of soil bearing capacity of the formation site to be submitted from recognised testing laboratries/Institution before execution of work.

5

23164

115821.7

... More
Dismantling, Shifting Reinstalling and commissioning of highmast 16/20/30 Mtrs including all accessories without damaging the highmast tower including breaking of Highmast foundation as per diresction of Engineer In- Charge at Site

1

22060

22060.64

... More
SITC of control panel for HMT with suitable rating of MCB (4 Pole 25-32 A) 95 ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete. for SCA old yard.

5

9087

45439.95

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 96 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.for SCA old yard.

40

17244

689792

... More
SITC of 1.5 HP squirrel cage induction motor , 4 pole 1500 RPM , 3 phase with suitable gear for high mast tower in SCA OLD yard

3

18125

54375

... More
SITC of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.for SCA old yard.

8

1021

8171.12

... More
Supply of high mast tower 12 Mtr heightwith its accessories. Mast shall be in onesection, hot dip galvanized, Ring sizeminimum 60mm OD, minimumgalvanization = 85micron. suitable for windZone-4 airvelocity as per IS-875, andsheet thickness should be 6 mm includingaccessories like head frame, steel wirerope 6 mm dia (7/19 construction), trailingcable, 99 double drum winch, galvanizedlantern carriage arrangement suitable for 6luminaries symmetrically boxes andlightning finial. The mast shall have anintegral power tool installed inside thebase compartment for its operation.(Bidder must submit wind tunnel testcertificate as per IS-875 as well asauthorization letter from principalmanufacturer after issue of LOAand beforeexecution of work. Warranty certificate oftower, Type test certificate & qualityassurance plan certificate, Design offoundation plan and drawing from OEM tobe furnished before execution of work.)for JRBM Goods yard

2

116670

233341.64

... More
Supply, fitting & fixing of foundation bolts minimum 8 nos, minimum bolt dia 25 mm and minimum bolt length 750 mm manufactured from special steel along with its nuts, washers, anchor plates of minimum thickness 20 mm and templates complete set.for JRBM Goods yard

2

2530

5060.66

... More
SITC of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.for JRBM Goods yard

4

1021

4085.56

... More
Design and casting of suitable shallow foundation with M-20 concrete (1:1.5:3) for 20 mtr high mast considering the safe soil bearing capacity as found at site and as per technical 102 specification attached. Before designing and casting of shallow foundation, testing of soil bearing capacity for erection of high mast tower and the test report of soil bearing capacity of the formation site to be submitted from recognised testing laboratries/Institution before execution of work.for JRBM Goods yard

2

23164

46328.68

... More
SITC of control panel for HMT with suitable rating of MCB (4 Pole 25-32 A) 103 ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete. for JRBM Goods yard

2

9087

18175.98

... More
SITC of control panel for defective HMT with suitable rating of MCB (4 Pole 25-32 A) ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete. for JRBM Goods yard

5

9087

45439.95

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 105 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.

30

17244

517344

... More
SITC of 1.5 HP squirrel cage induction motor , 4 pole 1500 RPM , 3 phase with suitable gear for high mast tower in JRBM Goods yard

4

18125

72500

... More
SITC of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.for JRBM Goods yard

6

1021

6128.34

... More
Supply of gravel stones in fencing area of HM tower (5x5x1 cuf for 1 HMT)for JRBM Goods yard (175 cuf = 4.59)

5

430

2152.75

... More
"Fabrication, design, supply, erection and commissioning of fencing of Hi-Mast tower with MS angle of size (75 x 75 x 5) mm. The size of fencing shall be 4 mtr x 4 mtr & height of fencing shall be 2.5 mtr above GL. The MS angles shall be put to a depth of 0.5 mtr below GL. The MS angles will also be used for top & bottom runner of fencing on 3 sides. (Total Qnty of MS angle to be used in the work shall not be less than 62 mtr). There shall be CC foundation block for supporting the MS angle structure. The size of each CC block shall be 0.250 mtr x 0.250 mtr and depth of each CC block shall be 0.5 mtr below GL and height of each CC block shall be 0.250 mtr above GL.( There shall be a total of seven(7) Nos of such CC blocks in the said work.). CC shall be in proportion 1:2:4 with stone 109 chips of maximum aggregate size 20 mm and less including cement, sand.etc. The fencing shall be covered on all sides by Gl flat of size (25x3) mm in square mesh design .(total qnty of GI flat to be used in the work shall not be less than 417.25 Mtr). The MS angles and GI flat are to be welded properly with each other to make the fencing strong. There shall also be provision of two part/double leaf hinged door locking arrangement on one side of the fencing. The door shall also be fabricated from MS angles of size (75x75x5) mm and Gl flat of size (25x3) mm in square mesh design and fitted with MS sliding door bolts bright satin finish orblack stone enameled of size (300 x16) mm with nuts/screws etc. The MS angles shall also be cleaned of any dust/oily/grease impurities and then painted by one coats of aluminium paint of any ISI marked quality. The entire work to be executed as per direction of engineer in charge at site.for JRBM Goods yard"

5

20583

102917.15

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 110 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site. for JRBM Goods yard

500

30

15225

... More
Supply ,fitting,fixing connection of steel rope for high mast tower

350

125

43750

... More
Replacement of control panel with suitable rating of MCB (4 Pole 25-32 A) 112 ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete.

4

9087

36351.96

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 113 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.

30

17244

517344

... More
Supply ,fitting,fixing connection of steel rope for high mast tower

200

125

25000

... More
Supply,testing and fixing of IP 66 high power LED flood light luminaries 200 watt LED with pressure die-cast aluminuium housing, complete with all accessories as per direction of EIC at 115 site. Lumens out put should be of 120 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 year.

20

17244

344896

... More
SITC of twin dome aviation obstruction lights with 1 no 25 W neon spiral lamp (2 fittings/mast necessary) Make- Solar/Bajaj /Philips/ GE.

6

1021

6128.34

... More
Excavation of cable trench below the GL with laying of armoured cable and refilling 117 the same by supply of Brick, Sand and riddled Soil after digging the earth as per direction of Engineer at site & connection of armoured Cable by supply and fixing of crimping lugs etc. As per attached CEGE/NFR DRG NO: PCEE/ELG/DRG/2024/2 dated04.10.2024 & as per Technical circular no. EL/PS/2024/2 (Standardization of Drawing for power cable laying direct underground)

500

50

25025

... More
Laying, commissioning of LT/HT cable XLPE insulated power cables with armoured 118 aluminum conductors of different sizes (partly along the pole and partly through ground in cable trench. Loading, unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site.

300

30

9135

... More
Supply, Installation, Testing and Commissioning of of 63 mm of HDPE pipes of Grade PE-100, PN 6 (6Kg/Cm2 Capacity) with accessories as per IS 4984 - 1995

300

86

26022

... More
Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness. The GI Strip ( should be welded with the earth pipe. The pipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an 120 effective earth value.The connecting conductor from earth electrode to the distribution panel board should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC and The values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO: PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as per Technical circular no. EL/PS/2024/1 (EARTHING SYSTEM).

8

1581

12649.6

... More
Replacement of control panel with suitable rating of MCB (4 Pole 25-32 A) 121 ,contactor,astronomical timer based switch and busbars with two nos. earth terminal control panel for High Mast towerlighting . The panel housing should be made of CRCA 16 SWG sheet with locking arrangement.Panel should be double door weatherproof type complete.

5

9087

45439.95

... More
SITC of 1.5 HP squirrel cage induction motor , 4 pole 1500 RPM , 3 phase with suitable gear for high mast tower

3

18125

54375



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.