National Highways And Infrastructure Development Corporation Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/assam/s-d/jica5/ae /2021/199467/rfp/c3
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NHIDC_756621_1Bid Award Id
ViewTender No
NHIDCL/ASSAM/S-D/JICA5/AE /2021/199467/RFP/C3Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Senior Environmental Expert (1 No) 1*5=5
5
-
-
Senior Social Safegaurd Expert (1 No) 1*5=5
5
-
-
Resident Engineer cum Highway Engineer (2 Nos) 2*24+1*60 = 108
108
-
-
Bridge/Structural Engineer (1No) 2*24=48
48
-
-
Material cum QC Engineer (2 Nos) 2*24+1*60 = 108
108
-
-
Remuneration for Sub- Professional Personnel
-
-
-
Highway Design Engineer (1 no.) 1*24 = 24
24
-
-
Geotechnical Engineer (1 no.) 1*12=12
12
-
-
Hydraulic Engineer (1 no.) 1*8=8
8
-
-
Quantity Surveyor (2 no.) 2*24=48
48
-
-
E&M Engineer (1 no.) 1*7=7
7
-
-
Environmental Expert (1 no.) 1*24=24
24
-
-
Social Safegaurd Expert (1 no.) 1*10=10
10
-
-
Contract Expert (1 no.) 1*12=12
12
-
-
Traffic Survey & Analysis Expert (1 no.) 1*2=2
2
-
-
CAD Engineer (1 no.) 1*18=18
18
-
-
Surveyor (2 nos.)
2*24 = 48
48
-
-
Field Engineer (2nos.)
2*24 = 48
48
-
-
Lab Technician (2 nos.)
2*24 + 1*60 = 108
108
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager cum Accountant (2 Nos)
(2*24+ 1*60)
108
-
-
Steno cum Computer Operator (2 Nos)
(2*24+ 1*60)
108
-
-
Office Boy (2 Nos)
(2*24+ 1*60)
108
-
-
Transportation (Fixed Costs)
-
-
-
IInnova/Scorpio or equivalent (not more than 3 years old) (2 nos. during Construction Period + 1 no during Maintenance period/DLP)
(2 * 24 + 1*60)
Rate per month
108
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
-
-
-
For 12 round trip to Employer's Head Office
24
-
-
For 24 round trip to Employer's regional office.
48
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
During Construction period (1 No) 1*24=24
24
-
-
During Maintenance /DLP period (1 No)
1*60=60
60
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies during construction period for 1 office
1*24=24
24
-
-
Office Supplies during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Drafting Supplies during construction period for 1 office
1*24=24
24
-
-
Drafting Supplies during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Computer Running Costs during construction period for 1 office
1*24=24
24
-
-
Computer Running Costs during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Domestic and International Communication during construction period for 1 office
1*24=24
24
-
-
Domestic and International Communication during Maintenance /DLP period for 1 office
1*60=60
60
-
-
Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (3 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core i5, 19’’ colour TFT, Cache-6MB, RAM-4 GB, HDD-500 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 11, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (5 no., 1.5 Ton), Water Coolers (as required)etc.,
-
-
-
During Construction period for 1 no of office
1*24=24
24
-
-
During Maintenance /DLP period for 1 no of office
1*60=60
60
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Inception Report (within one month of commencement of the service)
5
-
-
Monthly progress reports
(Design and Construction)
420
-
-
Quaterly Progress & Enviromental Monitoring Reports
100
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
1
-
-
Road Survey Equipment, Rate per Km
-
-
-
Rental cost towards Survey Equipment (GPS/Total station /Auto Level/LIDAR/NSV/ MBIU/ Retro-Reflectometer) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operation and maintenance etc complete) with rods, flags and other sundries
84
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements