National Highways And Infrastructure Development Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2024
Closing Date12 Aug 2024
Tender Amount₹ 21,27,46,685 
Notes
Download

Costs

Summary

Short Term Maintenance Under Original Repair (contract Maintenance) Works At Selected Locations Between Km 0.00 To Km 65.00 Of Pailapool-hangrum In The State Of Assam During The Year 24-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prime coat A. Prime coat (Providing and applying primmer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.) (Including cost of testing of materials at site and laboratory as directed by the deptt.) (ii) With Bitumen Emulsion-CSS-1 (IS- 8887-2004)

131625

5482181

41.65

... More
Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.) (II) With Bitumen Emulsion CSS-1 (IS:8887-2004) (c) Granular Surfaces treated with primer

131625

2506140

19.04

... More
Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.) (II) With Bitumen Emulsion CSS-1 (IS:8887-2004) (a) Normal Bituminious Surface

26125

404153

15.47

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.) B. With rock dust as filler ( refer table 500-9 of MoRT&H specification) (I) with 60/70 or VG-30 grade bitumen (ii) for GradingII(19 mm nominal size)

375

3983673

10623.13

... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. With rock dust as filler ( refer table 500-9 of MoRT&H specification) (I)'with 60/70 or VG-30 grade bitumen (ii) for Grading-II (13 mm nominal size)

4507.5

52282176

11598.93

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications

1500

1338750

892.5

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

30000

1356600

45.22

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (i) Ordinary soil (B) Mechanical Means (Depth upto 3 m))( Without dewatering )

296.25

16216

54.74

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

20.83

166920

8013.46

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification (b) Random Rubble Masonry

139.08

997298

7170.94

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.

60

19635

327.25

... More
RCC Pipe NP3 heavy duty non pressure pipe 1000 mm dia

25

205275

8211

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

100.5

380072

3781.82

... More
Labour for laying Reinforced cement concrete pipe NP4/NP3/prestressed concrete pipe for culverts on first class bedding of granular material /cc M-15 in single row including fixing collar with cement mortar 1:2,and cost of granular bedding but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet,cost of pipe and cost of CC bedding. (II) With 1st class bedding of cc M-15 1000 mm dia

25

5236

209.44

... More
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( including compensation of earth.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) private land

3705.52

2094545

565.25

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

7.39

63924

8647.73

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification (b) Random Rubble Masonry

287.76

2063509

7170.94

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.

40

13090

327.25

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

61.87

233988

3781.82

... More
Gabian Structure with Geo-synthetis Providing and Laying Copper & polypropylene rope Gabions indigenously manufactured from high strength rope for slope protection and erosion control for river bank and sea-shore protection. Exclusive of providing & filling stones complete as per specifications and as directed by the Engineer in charge. B) Type A (size 1M x1M x 2M, aperture 100mm x 100mm)

700

2148307

3069.01

... More
Plain/Reinforced cement concrete, (Top Layer) (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser( Masterplast ACPL or equivalent) conforming to IS-9103-1999 (B) PCC Grade M20 (Height upto 5m)

73.94

842005

11388.3

... More
Plain/Reinforced cement concrete, (Parapet Wall) (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser( Masterplast ACPL or equivalent) conforming to IS-9103-1999 (A) PCC Grade M15 (Height upto 5m)

4.32

46786

10830.19

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) (B) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (ii) for grading- II Material

66.17

269377

4070.99

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

5.62

48600

8647.73

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification (b) Random Rubble Masonry

246.91

1770548

7170.94

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.

24

7854

327.25

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

39.86

150747

3781.82

... More
Crawler Crane 50 Tonne capacity for Bridge Lifting.

192

431141

2245.53

... More
Crawler mounted Excavator of 1 cum bucket for boulder cleaning Bridge bottom area.

6

16050

2675.12

... More
Gabian Structure with Geo-synthetis Providing and Laying Copper & polypropylene rope Gabions indigenously manufactured from high strength rope for slope protection and erosion control for river bank and sea-shore protection. Exclusive of providing & filling stones complete as per specifications and as directed by the Engineer in charge. B) Type A (size 1M x1M x 2M, aperture 100mm x 100mm)

150

460351

3069.01

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

48

181527

3781.82

... More
Plain/Reinforced cement concrete, (Parapet Wall) (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser( Masterplast ACPL or equivalent) conforming to IS-9103-1999 (A) PCC Grade M15 (Height upto 5m)

1.08

11696

10830.19

... More
Filling Pot- holes and Patch Repairs with open - graded Premix surfacing, 20mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat of bitumen emulsion on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material with paving bitumen 60/70 as per clause 511, compacting , trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2. (ii)Using Bitumen emulsion CSS-1 ( IS:8887-2004) as Tack coat

12

5235999

436333.33



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.