National Highways And Infrastructure Development Corporation Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_588782_1Bid Award Id
ViewTender No
NHIDCL/D-PBridge/2018/AETender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sr. Contract Expert 1
10
-
-
... More
Chief QA/QC Expert 1
10
-
-
... More
Chief Safety Expert
40
-
-
... More
Chief Social and Environment Expert
13
-
-
... More
Chief Bridge Engineer (Bridge Team-Foundation/Substructure Sub-Team)
9
-
-
... More
Chief Bridge Engineer (Superstructure (Extradozed) Sub-Team)
15
-
-
... More
Chief Bridge Engineer (Superstructure(Viaduct/VOP) Sub Team)
30
-
-
... More
Chief O&M Expert
7
-
-
... More
Chief Resident Engineer (Execution Team)
32
-
-
... More
Chief Resident Engineer (Viaduct Team)
8
-
-
... More
Remuneration of Sub Key-Professionals
-
-
-
... More
Contract/Cost/Planning Team
-
-
-
... More
Sr. Contract Expert 2
30
-
-
... More
Contract Expert 1
99
-
-
... More
Sr. Quantity Surveyor 1
79
-
-
... More
Quantity Surveyor 1
87
-
-
... More
Chief Legal Advisor
25
-
-
... More
Chief Construction Planning Expert
45
-
-
... More
Sr. Programming & Scheduling Expert
58
-
-
... More
Sr. Document Controller
98
-
-
... More
QA/QC Team
-
-
-
... More
Chief QA/QC Expert 2
28
-
-
... More
Sr. QA/QC Expert
95
-
-
... More
Safety Team
-
-
-
... More
Sr. Safety Expert
90
-
-
... More
Social and Environment Team
-
-
-
... More
Sr. Social Expert
29
-
-
... More
Social Specialist
29
-
-
... More
Environment Specialist
93
-
-
... More
Dolphin Expert
19
-
-
... More
HIV/STD Preventive Coordinator
16
-
-
... More
Design Team
-
-
-
... More
Highway Team
-
-
-
... More
Sr. Highway Engineer-1
8
-
-
... More
Sr. Highway Engineer-2
4
-
-
... More
Pavement Engineer
7
-
-
... More
Drainage Engineer
7
-
-
... More
Electrical Engineer
7
-
-
... More
Traffic Engineer
4
-
-
... More
Bridge Team (Foundation/Sub-structure)
-
-
-
... More
Chief Bridge Engineer (Bridge (Fdn./Sub-Structure)
14
-
-
... More
Bridge Engineer (Bridge Team (Fdn./Sub-Structure)
24
-
-
... More
Sr. Geotechnical Engineer
8
-
-
... More
Geotechnical Engineer
20
-
-
... More
Revetment Engineer
10
-
-
... More
Hydrological Engineer
4
-
-
... More
Bridge Team (Superstructure-Extradosed)
-
-
-
... More
Sr. Bridge Engineer (Superstructure(Extradosed) Sub-Team)
15
-
-
... More
Bridge ngineer (Super Structure (Extradosed) Sub-Team)
30
-
-
... More
Bridge Team (Superstructure-Viaduct/VOP)
-
-
-
... More
Bridge Engineer 1 (Superstructure (Viaduct/VOP) Design Team)
40
-
-
... More
Operation and Maintenance Team
-
-
-
... More
O&M Expert
9
-
-
... More
Execution Team
-
-
-
... More
Main Bridge Team
-
-
-
... More
Sr. Resident Engineer
34
-
-
... More
Site Engineer
174
-
-
... More
Safety Engineer
87
-
-
... More
QA/QC Engineer
126
-
-
... More
Material Engineer
141
-
-
... More
Surveyor
141
-
-
... More
Viaduct Team
-
-
-
... More
Sr. Resident Engineer
26
-
-
... More
Site Engineer
170
-
-
... More
Safety Engineer
85
-
-
... More
QA/QC Engineer
85
-
-
... More
Material Engineer
85
-
-
... More
Surveyor
85
-
-
... More
Remuneration of Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager
195
-
-
... More
Secretary/Typist
236
-
-
... More
Accountant
248
-
-
... More
Office Assistant
381
-
-
... More
IT Specialist
186
-
-
... More
Cad Operator
332
-
-
... More
Site Inspector (Main Bridge)
1008
-
-
... More
Site Inspector (Viaduct)
288
-
-
... More
Document Controller
165
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
Scorpio or SUV 4x4 vehicle (Minimum 10 numbers and not more than 1 year old vintage) To provide adequate mobility for real time supervision atleast one SUV per team be considered at the time during including 1 vehice for the client Construction period and the requirement may be reduced to 50% during maintenence period.
1170
-
-
... More
Motor-boat (preferably fibre make with cover, twin engine equipped with safety gear for minimum 5 person (6 Nos for inspecting work during construction & maintenance) one boat for dolphin expert for mitigation plan and the requirement may be reduced to 50% during maintenence period.
702
-
-
... More
Duty Travel to Site (Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 560 round trip to Employer's Head Office and 560 round trip to Employer's regional office. (including Hotel Charges,travel costs etc. complete)
1120
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
... More
Main office of minimum 600 sqm area including a conferernce hall to house minimum 50 person for Construction Period and two sub-Office 300sqm area on either banks (Adeqaute independent communication facility to field staff.
93
-
-
... More
Defect Liability Period (min. 200sqm area)
48
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
141
-
-
... More
Drafting Supplies
141
-
-
... More
Computer Running Costs
141
-
-
... More
Domestic and International Communication
141
-
-
... More
Office Furniture and Equipment (Rental) for construction/maintenance period
-
-
-
... More
Executive Table (Godrej make, model No.T-108orequivalent) (12 Nos)
141
-
-
... More
Executive Chairs(Godrej make, model No.PCH-701orequivalent) (12 Nos)
141
-
-
... More
Tables(Godrej make, model No.T-104 or equivalent) (70 Nos)
141
-
-
... More
Ordinary Chairs Type-1(Godrej make,Model NoT-CHR–6 or equivalent) (70 Nos)
141
-
-
... More
Tables(for all other staff)(Godrej make,modelNo.T-101orequivalent) (10 Nos)
141
-
-
... More
Ordinary Chairs–Type II (for all other staff) (Godrej make,modelNo.CHR-6 or equivalent (10 Nos)
141
-
-
... More
Steel Almirah 1270mmx765mmx440mm(Godrej make, model minor plain or equivalent) (60 Nos)
141
-
-
... More
Visitors chairs/Conference room chairs (Godrej make, model No. DCH7004 or equivalent) (50 Nos)
141
-
-
... More
Tables for computers with 3 drawers, keyboard/mouse pull out trays size 1664mmx 900(Godrej make. Or equivalent as per Engineer’s design) (10 Nos)
141
-
-
... More
Printer desks(Godrej make or equivalent) (12 Nos)
141
-
-
... More
Side tables (Godrej make or equivalent) (12 Nos)
141
-
-
... More
Conference Table(Godrej make, model No.T-12 or equivalent) (3 No)
141
-
-
... More
Revolving Chairs for Computer Room/Drawing room (3 Nos)
141
-
-
... More
Telephone with PABX facilities (2External lines&10internal lines) (4 Nos)
141
-
-
... More
Interpersonnel Radio Communication devices for all staff
141
-
-
... More
Photocopier (3 No)
141
-
-
... More
Fax (1 No)
141
-
-
... More
Air-Conditioner(1.5Ton) (25 Nos)
141
-
-
... More
Computer PC (state of the art) (70 Nos)
141
-
-
... More
LaserJet Printers (15 Nos)
141
-
-
... More
Diesel Generator (Minimum of 50KVA)with running Cost (3 No)
141
-
-
... More
Binding Machine (2 No)
141
-
-
... More
Air Cooler(of 24” size fan with suitable Pump and shall be of either GEC, Katina or Cool Home make or equivalent) (10 Nos)
141
-
-
... More
Water Coolers (Voltas or equivalent) (5 No)
141
-
-
... More
Software (Project management softwares, Document Control, Surveys, Digitization of records, etc.)
1
-
-
... More
Report and Document Printing
-
-
-
... More
Monthly Reports (Design and Construction etc.)
705
-
-
... More
Quarterly/Half yearly reports
240
-
-
... More
Various other reports as provided in the Contract Agreement such as completion report, inception report, LA & monitoring, Technical report etc.)
20
-
-
... More
Rental cost towards Survey Equipment(GPS/Total station /Auto Level/LIDAR/Drone/Falling Weight Deflectometer /Retro-reflectometer/Network Survey Vehicle/Laser Profilometer/Mobile Bridge Inspection Unit) with expert survey Party and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operationand maintenance etc complete) with rods, flags and other sundries During DLP
48
-
-
... More
Contigencies (Fixed as per RFP- Rs. 2 Crore)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements