National Highways And Infrastructure Development Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Consultancy Services
Eprocure
Opening Date8 May 2018
Closing Date5 Jun 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

NHIDCL/DPR/Brahmaputra Bridge/Jogighopa/2018

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Highway cum Pavement Engineer

5

-

-

... More
Material cum GeoTechnical Engineer cum Geologist

7.5

-

-

... More
Senior Survey Engineer

7.5

-

-

... More
Traffic and Safety Expert

4.5

-

-

... More
Environment Specialist

4

-

-

... More
Quantity Surveyor/Documentation Expert

6.5

-

-

... More
Land Acquisition Expert

12

-

-

... More
Utility Expert

5

-

-

... More
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)

-

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment

-

-

-

... More
Office Manager

12

-

-

... More
Typist

12

-

-

... More
Office Boy

12

-

-

... More
Night Watchman

12

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.

12

-

-

... More
Duty Travel to Site (Fixed Costs)

-

-

-

... More
Trips

12

-

-

... More
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.

-

-

-

... More
Office Rent

12

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies

12

-

-

... More
Drafting Supplies

12

-

-

... More
Computer Running Costs

12

-

-

... More
Domestic and International Communication

12

-

-

... More
Office Furniture and Equipment (Rental)

-

-

-

... More
Office Furniture and Equipment

1

-

-

... More
Reports and Document Printing

-

-

-

... More
Monthly Report (3 copies per month)

36

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment report& RAP

4

-

-

... More
Final Environmental Assessment report& RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc. Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Survey and Investigation A. Topographical Survey (Fixed Rate)

-

-

-

... More
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.

2.3

-

-

... More
Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology

2.3

-

-

... More
Investigation (Fixed cost)(lumpsum)

-

-

-

... More
Road and Bridge Inventory

1

-

-

... More
FWD Test and Pavement Evaluation

1

-

-

... More
Roughness Survey

1

-

-

... More
Axle Load Survey

1

-

-

... More
Material Survey and Investigation

1

-

-

... More
Sub-grade Investigation

1

-

-

... More
Traffic Survey

1

-

-

... More
Socio-economic & Census Survey/Studies

1

-

-

... More
Land Acquisition Studies

1

-

-

... More
Any other investigations/surveys

1

-

-

... More
Sub-Soil Investigation (Boring) (Rate/m)

-

-

-

... More
a) In soil other than hard rock

1500

-

-

... More
b) In hard rock

200

-

-

... More
Network Survey and GPR

-

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Fixing Boundary pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval

1

-

-

... More
Physical and Mathematical Model Study as mentioned in Supplement II of ToR

-

-

-

... More
Physical and Mathematical Model Study

1

-

-

... More
Land Acquisition Team including support staff and logistics/transportation

-

-

-

... More
Land Acquisition Team including Support Staff

-

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

8

-

-

... More
Ex-Kanoogo/Girdwar or equivalent

8

-

-

... More
Ex-Patwari or equivalent

8

-

-

... More
Typist (2 nos.)

8

-

-

... More
Peon

8

-

-

... More
Logistics for Land acquisition Team

-

-

-

... More
Computer including necessary peripherals (2 nos.)

8

-

-

... More
Printers (2 nos.)

8

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km

8

-

-

... More
Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)

-

-

-

... More
Renumeration of Expatriate Staff including per diem allowances

-

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)

-

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Position

1

-

-

... More
Moblization and Demoblization-Inland Travel in Home country (Fixed Costs)

1

-

-

... More
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.