Military Engineer Services Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_664695_1Bid Award Id
ViewTender No
CWE/TEZ(S)/T-19 of 24-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://defproc.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Removing excavated material to a distance not exc. 50 mtrs and deposting where directed at a level not exceeding 1.50mm above the starting point all as specified and directed by Engineer-in-charge.
30
-
-
Supply and laying natural river sand as cushioning of cables, including spreading and punning down all as per clause No 3.21 of SSR part -I complete all as specified and directed by Engineer-in-charge and directed by Engineer in charge
Note : punned thickness will only be measured for payment purpose.
24
-
-
Supplying and laying un-reinforced precast concrete cable cover, but class HV, Type 1, flat, size 300mmx 180mm x 40mm complete all as specified and directed.
2667
-
-
Supply,Laying ,testing, and commissioning size 3x120 sqmm cross-sectional area XLPE insulated, screened, PVC bedded, galvanised steel strip armoured heavy duty electric cable with aluminium conductor 11000 volts grade, in tranches / fixing on wall by saddel/ fixing on poll / drawn through GI pipes including taking down Old unsv UG cable complete all as specified and directed.
200
-
-
Supply,Laying ,testing, and commissioning size 3x95 sqmm cross-sectional area XLPE insulated, screened, PVC bedded, galvanised steel strip armoured heavy duty electric cable with aluminium conductor 11000 volts grade, in tranches / fixing on wall by saddel/ fixing on poll / drawn through GI pipes including taking down Old unsv UG cable complete all as specified and directed.
400
-
-
Supply,Laying ,testing, and commissioning size 3x95+1x70 sqmm cross-sectional area Aerial Bunch Cable with H4 grade Aluminium, with extruded semi conductor screen, XLPE insulation, Insulation screen Non-metallic extruded semi conducting layer, insulation screen metallic applied helically over the non metallic layer, sheath PVC type ST2, with messanger conductor of one run of Stainless steel of nominal dia 70 sqmm , heavy duty 11000 volts grade, fixing on poles including all its hardware accessories such as suspension hook, insulator, suspension clamp, rubber insert etc including taking down Old unsv ABC cable complete all as specified and directed.
650
-
-
Dismantling of Steel tubular poles / struts any size complete.
5
-
-
M & L in repair Steel tubulr swaged poles complete with cast iron base plate, finial tapr plug, bolts, nuts and screws as specified type 410 SP-55, 11 metres long incl one primer coat, two coat of aluminium paint, making of pole no and making 03 Nos of black strip and 03 nos of red strip in alternate layers of 30 cm wide on equal distance from copping complete all as specified and directed.
5
-
-
M & L angle iron Cross arms, bracings, supports, clamps and back plates fabricated from structural steel sections including nuts, bolts, washers, welding, bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint complete all as specified and directed.
6
-
-
M&L for cement concrete type D2, 1:4:8 (using 40 mm graded sto agg.) in foundations, filling and mass concrete complete all as specified.
0.18
-
-
M&L for cement concrete type C1 1:3:6 (20mm graded aggregate) in or mud stops, rounded or chamfered on edges etc all as specified and directed
1.6
-
-
M&L for cement concrete type B0, 1:2:4 (using 12.5 mm graded sto agg.) for coping above ground level of steel electric pole concrete complete all as specified.
0.4
-
-
M & L for Broken Stone or Boulders Hardcore of Gauge not exc. 63mm, deposited, spread and levelled in layers not exc. 150mm thick, watered and rammed to a True Surface, complete all as specified and directed.
5
-
-
S & F in repair composite polymer type pin insulator for 11 KV overhead line including all its accessories complete all as specified.
6
-
-
M & L in repair composite polyme Disc type insulator, ball and socket type with tension clamps and all hardware components for conductors, working pressure fit for 11000 volts complete all as specified and directed.
5
-
-
S & F in repair composite polymer type post insulator for 11 KV overhead line including all its accessories complete all as specified.
8
-
-
S & F in repair composite polymer type pin insulator for 33 KV overhead line including all its accessories complete all as specified.
4
-
-
M & L in repair composite polyme Disc type insulator, ball and socket type with tension clamps and all hardware components for conductors, working pressure fit for 33KV complete all as specified and directed.
3
-
-
M & L Composite Polymer Lightning arresters expulsion type complete with all fittings, transmission class, discharge capacity 65 kilo amp suitable for 11 KV (station class/distribution class) to fix it on the Pole with continuity conductor upto earth terminal including taking down unsv LA complete all as specified and directed.
4
-
-
M & L Composite Polymer Lightning arresters expulsion type complete with all fittings, transmission class, discharge capacity 65 kilo amp suitable for 33 KV (station class) to fix it on the Pole with continuity conductor upto earth terminal including taking down unsv LA complete all as specified and directed.
2
-
-
M & L Composite Polymer Air Break switch gang operated Triple pole, mechanically operated, mounted on insulator and steel frame, with operating mechanism worked from ground level, for current rating upto 200 amps fit for 11 KV with all accessories including taking down unsv GOD Complete all as specified and directed.
10
-
-
M & L Composite Polymer Air Break switch gang operated Triple pole, mechanically operated, mounted on insulator and steel frame, with operating mechanism worked from ground level, for current rating upto 200 amps fit for 33 KV with all accessories including taking down unsv GOD Complete all as specified and directed.
1
-
-
S & F in repair Male Contact/ moving contact blade of Air Break Switch 11 Kv complete all as specified and directed.
2
-
-
S & F in repair Female contact/ fixed contact Jaw of Air Break Switch 11 Kv complete all as specified and directed.
2
-
-
S & F in repair Tinned copper flexible jumper 200A/ 400 A site selectableof Air Break Switch 11 Kv complete all as specified and directed.
2
-
-
S & F in repair MS jumper Carrierof Air Break Switch 11 Kv complete all as specified and directed.
4
-
-
S & F in repair Back contactor Plate of Air Break Switch 11 Kv complete all as specified and directed.
4
-
-
M & L Composite Polymer Expulsion type Drop Out fuse single pole 11 KV , above 50 Amps upto 100 Amps including MS channel for fixing it with the pole including taking down old unsv DO fuse complete all as specified and directed.
3
-
-
Material and labour for painting of steel tubular pole 11 mtr long, including cross arms bracing supports etc complete by applying two coat of synthetic enamelled paint (colour will be chose by EIC) after surface preparation, marking of pole numbers and making 3 Nos of black colour strip 30 cm wide on equal distance from coping complete all as specified and as directed by Engr - in Charge.
80
-
-
Supply & Fix syntheic mat of size 2m x 1m x 3 mm including taking out old Unseveciable Syntheic mat all as specified and directed by Engineer-in-charge.
8
-
-
Supply and Fix Danger notice plate of 1.6mm thick mild steel sheet, vitreous enamelled white, with letters, figures and conventional skull and bones in signal red colour and fixed with MS clamps, bolts and nuts of approved size, for 20x15cm size complete all as specified and directed.
10
-
-
Supply and fix Cable jointing kit for 11KV grade cable for Outdoor End termination heat shrink type complete with Jointing material and acceesseries suitable for 3 core are XLPE armoured at conductor cable of size 120 to 185 sq mm all as specified including Disconnecting and cutting down the existing old unserviceable / worn out cable end joint Kit 11 KV grade indoor termination cold shrink type as directed by Engineer-in-charge.
2
-
-
All As per Item No - 35, but for 50 to 95 Sqmm
10
-
-
All as per Item No-35 , but for outdoor End Termination Aerial Bunch Cable of 50-95 Sqmm
8
-
-
Supply and fix Cable jointing kit for 11KV grade cable for Outdoor Straight through joint, Heat shrink type complete with Jointing material and acceesseries suitable for 3 core are XLPE armoured at conductor cable of size 50 to 95sq mm all as specified as directed by Engineer-in-charge.
4
-
-
All As per Item No - 38, but for 120 to 180 Sqmm
1
-
-
All as Per Item No-38, but for outdoor Straight through Joint of Aerial Bunch Cable
4
-
-
Disconnecting all in coming and outgoing cables, removing the transformer of capacity 100-160 KVA from the platform / two pole structure / floor and loading it in the vehicle carefully using crane and transporting it to the contractor's workshop, carry out the required repairs and transport the transformer back to the site , install it, reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the LT / HT bushes / bus bars, using LT / HT insulation tape and testing complete of following capacity all as directed by Engr-in-Charge Note :- (a) Shifting and fixing transformer from own arrangent temporarily from MES Area to that area ( Back up Transformer will be provided by MES) (b) The cost of transportation of 2 transformers between Existing location and the Workshop is deemed to be included in the unit price. (b) Gasket set, LT/HT side porcelein / ceramic bushing, spindle for HT/LT side , rewinding, dehydration of oil (if required) shall be measured and paid separately in respective items.
4
-
-
All as per Item No- 41, but for capacity 200-315 KVA capacity
2
-
-
All as per Item No- 41, but for capacity 400-500 KVA capacity
2
-
-
S & F brass spindle for terminal on HT side threaded complete with nut, washers etc of suitable dia for transformer of of capaicty 100-160 KVA
2
-
-
All as per Item No- 44, but for capacity 200-315 KVA capacity
2
-
-
All as per Item No- 44, but for capacity 400-500 KVA capacity
2
-
-
All as per Item No- 44, but for LT Side & capacity 100-160 KVA capacity
2
-
-
All as per Item No- 44, but for LT Side & capacity 200-315 KVA capacity
3
-
-
All as per Item No- 44 , but for LT Side & capacity 400-500 KVA capacity
2
-
-
Dehydration/ filtration of transformer oil of Capacity 100 KVA to 2.5 MVA with ultra high vacuum filteration machine and checking dielectric strength (BDV), dielectric dissipation factor, neutralizing value (total activity) 55-60 KV with 2.5 mm Gap sludge content, flush point of transformer oil from Standard Testing Laboratory all as specified .Refilling the transformer oil in the shell of transformer after carrying out filtration and heating up oil to achive reqd dielectric strength and submitting the test result before and after filteration of oil in presence of Engr- in- charge on proper proforma duly signed.
9000
-
-
Supply and fill Transformer oil with high viscosity , high resistance to oxidation & thermal stability mainting BDV Value of 55-60 KV in 2.5mm rod gap complete all as specified and directed by Engineer-in-charge.
1900
-
-
S & F dehydrating breather for 100-160 KVA transformer with dehydrating agent (Silica gel) including taking down existing breather complete all as specified.
6
-
-
All as per Item No- 52 , but for 200-315 KVA transformer
6
-
-
All as per Item No- 52, but for 400-500 KVA transformer
5
-
-
Supply and fix in repair ceramic bushing on HT side of transformer of capacity 100-160 KVA
2
-
-
All as per Item No- 55, but for 200-315 KVA transformer
3
-
-
All as per Item No- 55, but for 400-500 KVA transformer
4
-
-
All as per Item No- 55, but for LT side of 100-160 KVA transformer
2
-
-
All as per Item No- 55, but for 200-315 KVA transformer
3
-
-
All as per Item No- 55, but for 400-500 KVA transformer
4
-
-
Supply and fixing in replacement of complete gasket (Cock sheet) 6 mm thick complete of capacity of following transformer including conical rubber bush for Transformer of capacity 100-160 KVA
2
-
-
All as per Item No- 61, but for 200-315 KVA transformer
3
-
-
All as per Item No- 61, but for 400-500 KVA transformer
4
-
-
Material and labour for painting to 100-160 KVA transformer scrapping and removing oil paint and applying 01 coats of synthetic enamel paint by taking due care for HT/LT side supply all as specified and directed by Engineer-in-charge .
2
-
-
All as per Item No- 64, but for 200-315 KVA Transformer
4
-
-
All as per Item No- 64, but for 400-500 KVA Transformer
5
-
-
Material and labour for painting to 2.5 MVA Power transformer scrapping and removing oil paint and applying 01 coats of synthetic enamel paint by taking due care for HT side supply all as specified and directed by Engineer-in-charge .
2
-
-
Supply and winding of 11/0.433 KV HV coils,using new copper wire/strip of proper size including insulating materials (double insulation)as per existing size of core of transformer complete including heating , varnishing complete all as specified and directed
140
-
-
Supply and winding of 11/0.433 KV LV coils,using new copper wire/strip of proper size including insulating materials (double insulation)as per existing size of core of transformer complete incl heating , varnishing complete all as specified and directed
90
-
-
M & L for winding of 11/0.433 KV HV/LV coils coils,removing U/S insulating materials, double reinsulation with insulating papers using same copper strip and rewinding as per existing size of core of transformer upto 500 KVA capacity complete incl heating , varnishing complete all as specified and directed
40
-
-
Calibration and testing of combined inverse time over current and intstantaneous relay, checking and cleaning / decarbonising its moving and fixed contacts and ensure physical healthyness with visual check for healthy tripping of over current and earth fault, adjusting tripping time, flag setting, ratio setting, instantaneous time setting etc as per installed capacity of transformer to be saved on maximum, short circuit current in accordance with percentage impedance of transformer with artificial current injection on primary side with current injection machine of HT VCB,s complete all as specified and directed Note : Spares / meters shall be measured and paid seperatly. The contractor should submit the Calibration certificate before claiming the payment.
7
-
-
Overhauling/Repair of 33 KV VCB with panel, rated voltage- 36 KV cleaning of all parts, adjusting contacts, springs locking arrangements tripping coil circuits (closed/open) etc cleaning of CT and PT supporting insulators bush trolley auxiliary contact. Make female contact and check all wiring including minor item required for repair complete all as specified and directed
4
-
-
Overhauling/Repair of 11 KV VCB with panel, rated voltage- 36 KV cleaning of all parts, adjusting contacts, springs locking arrangements tripping coil circuits (closed/open) etc cleaning of CT and PT supporting insulators bush trolley auxiliary contact. Make female contact and check all wiring including minor item required for repair complete all as specified and directed
12
-
-
Overhauling/Repair of Float cum Boost Charger, cleaning of all parts, check all wiring , Checking Output Voltage, Checking entire DC Circuit from Charger to the panel Fuse including replacement of minor item required for repair complete all as specified and directed by Engr in Charge
1
-
-
S & F in repair 3 phase digital type Amp meter 0 - 200 Amps class 0.5 of size 96mm x 96mm to match the ratio of existing CTs complete all as specified and directed by Engr in Charge
2
-
-
S & F in repair 3 phase digital type Volt meter 0 - 11 KV class 0.5 of size 96mm x 96mm to match the ratio of existing PTs complete all as specified and directed by Engr in Charge
2
-
-
S & F in repair 3 phase digital type Volt meter 0 - 33 KV class 0.5 of size 96mm x 96mm to match the ratio of existing PTs complete all as specified and directed by Engr in Charge
2
-
-
S & F in repair Programmable numerical inverse time over current / earth fault relay suitable for VCB 11/12 KV of make ABB Model No - REJ-601 or Equiv of Kirloskar / Areva complete
2
-
-
S & F in repair Epoxy Resin Body for switchgear VMX type 11 KV VCB, 630 Amp Complete all as specified and directed.
1
-
-
S & F Top clamps with hardware (pair) R/B phase 630 / 800 Amps complete all as specified and directed.
2
-
-
S & F Top clamps with hardware (pair) Y phase 630 / 800 Amps complete all as specified and directed.
2
-
-
S & F in repair Half collar (Pair) of VCB 630 Amps complete all as specified and directed
2
-
-
S & F in repair Brass nut of VCB 630 Amps complete all as specified and directed
2
-
-
S & F in repair Spider for VCB 630 Amp Complete all as specified and directed
2
-
-
S & F in repair Epoxy Resin Spout bushings triple pole assembly fit for 11 KV VCB panel Complete all as specified and directed
2
-
-
S & F in repair Gromet VCB 630 Amp Complete all as specified and directed
5
-
-
S & F in repair Drive insulator with M10 Nyloc Nut for VCB 630 Amp Complete all as specified and directed
4
-
-
S & F in repair Drive Beam (Pair) VCB 630 Amp Complete all as specified and directed
3
-
-
S & F in repair closing coil assembly 110 volt for VCB complete all as specified and directed
2
-
-
S & F in repair tripping coil assembly 110 Volt for VCB complete all as specified and directed
2
-
-
S & F in repair TNC switch , 110 Volt complete all as specified and directed
3
-
-
S & F in repair vacuum interrupter suitable for VCB VMX type 630/400A Model. VG2 BW524/99/Ro
2
-
-
S & F in bakelite HRC fuse base with carrier 32A, 415 V with HRC fuse 5 amps complete all as specified and directed.
5
-
-
S & F in repair Buffer for VCB 11KV complete all as specified and directed.
4
-
-
S & F in repair push button actuator 1 No element, 22.5 mm dia (TCH) assembly
2
-
-
Labour for checking & rectifying High Tension (11KV/33KV) fault location by disconnecting Jumper, Climbing the pole, checking of insulators etc at any location, any time round the clock in SAA complete all as specified and directed. Note:- 1. The cost of materials used shall be measured and paid separately 2. The labourers shall be available round the clock of 24 hours a day. 3. The cost of use of tools and safety equipments is deemed to be included in the unit rate.
30
-
-
S & F in Repair 33Kv / 110v Oil type PT (site selectable I type) including PG clamps for conductor fixing complete all as specified and directed.
3
-
-
S & F in Repair CT , 11 KV, dry type, indoor, 200/100 (primary)-5 A (Secondary) for fixing with Spout bushing complete all as specified and directed.
3
-
-
M& L for replacement of PG clamps made out of cast aluminium and tinned copper site selectable for 33 KV isolator/CT/PT/ Transformer end termination all as directed.
12
-
-
S & F in repair microprocessor based protection release of ACB of any capacity complete all as specified and directed
1
-
-
S & F in repair mechanical operation counter of ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair racking padlock assembly for ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair spring charge indication for ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair shunt release type EA1 : 415 V AC for ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair Earth fault release Type EF 2 (30 %, 40%, 50 % In) for ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair Under Voltage release Type MV, 415 V for ACB of any capacity complete all as specified and directed
2
-
-
S & F in repair AN1 remote annunciation module 240 V for ACB of any capacity complete all as specified and directed
2
-
-
M & L preparation of old painted surfaces removing of rust from structure for Each bay and busbar with cable protection pipes clamps, panels, CT, PT, GOD and channels, angles etc for any description and applying one coat of 1st quality aluminium paint including writing of particular specification by white paint 10 CM height over a rectangular surface of black synthetic enameled paint complete all as specified and directed by Engr-in-charge.
2
-
-
S & F in repair Power pack with battary backup with input AC voltage 230 V, Output DC voltage 24 V , 100 W , 10 min complete all as specified and directed
2
-
-
M & L in repair Earthing complete with GI earth plate electrode 60cmX60cmX6 mm thick buried directly in ground (earth pit not less than 2.25 mtrs deep below ground level) with top edge of the plate not less than 1.5 mtr below normal ground level, connecting to galvanized earth strip 32 x 6 mm as earthing conductor by means of bolts, nuts, check nuts and washers of GI and all as shown in Electrical plate No.3 of SSR Part I and including testing on completion all as specified locations and as directed by the Engineer-in-Charge.
Note: 1.The above quoted rate shall include cost of main earthing lead of 32 x 6mm GI earth strip, charcoal, salt, excavation and earth work in any type of soil CI cover, funnel with 20mm dia light grade GI water pipe including GI protection pipe 40mm dia light grade for earth strip etc. 2. The cost of earth pit is deemed to be included in the unit rate.
25
-
-
Labour for restringing/tilting, clamping, bending, jumpering etc to remove excess sag of loose ACSR overhead line using essential T&P such as manila rope, puller and teipod etc upto permissible sag between two poles continuously upto termination point. Note- 1. Three runs of ACSR shall be measured as one unit. 2. Span Between two consecutive poles shall be measured as one unit. 3. The cost of use of required tools and safety equipments is deemed to be included in this unit price.
10
-
-
Labour for trimming/cutting to small tree branches girth not exc 30cm upto minimum 2 Mtr clearance, tightening to stay stand in proper angle complete all as specified and directed by Engr in charge. Note- 1. Span Between two consecutive poles shall be measured as one unit.
2. The cost of use of required tools and safety equipments is deemed to be included in this unit price.
100
-
-
Disconnecting all incoming and outgoing cables from transformer / LT panel/ Main DB of any size and any length. LT/HT cable shall be megger tested of following parameter in presence of MES rep/ concern JE and reconnect all the incoming and out going cables by properly crimping using lugs of suitable size lugs, taping the LT / HT bushes / bus bars, using LT / HT insulation tape and testing complete all as directed by Engr-in-Charge (i) Continuity
(ii) Absence of Cross Phasing.
(iii) Insulation resistance to earth
(iv) Insulation resistance between conductors
31
-
-
Labour ( Skilled Electrician ) only for load balancing (+ 10% variation) in three phase transformer upto 160 KVA capacity Quoted rates shall be included for all required T&P and safety equipment. in presence of MES rep / concern JE complete all as directed by Engr-in-Charge. Note: Quoted rates shall be included for all required T&P and safety equipment.
9
-
-
All as per Item No- 114, but for 200-315 KVA transformer
9
-
-
All as per Item No- 114, but for 400-500 KVA transformer
6
-
-
NOTES:
1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum.
2. The rates for RCC/PCC shall deemed to include the cost of formwork, shuttering etc., required for complete and proper execution of the item. Refer Schedule "A" notes for details.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements