Indian Oil Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indian Oil Corporation Limited - IOCL Tender

Works
Eprocure
Opening Date2 Jan 2025
Closing Date18 Jan 2025
Tender Amount₹ 33,45,273 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80 mm NB

180

111

20070

... More
100 mm NB

12

143

1720.32

... More
150 mm NB

12

235

2826.84

... More
250 mm NB

12

417

5013.72

... More
CME01001XX Height Factor: Payment will be made based on actual execution as per item description CME01001XX.

1

16822

16822.66

... More
COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES (INSULATED / UNINSULATED) Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ alloy steel from various location such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalters etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises all complete as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
50 MM NB

166.8

172

28828.04

... More
80 MM NB

85.2

267

22800.37

... More
100 MM NB

34.8

344

11973.64

... More
150 MM NB

22.8

565

12890.21

... More
250 MM NB

16.8

865

14539.06

... More
CME01009XX Height Factor: Payment will be made based on actual execution as per item description CME01009XX.

1

18206

18206.26

... More
CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6013)- OFFSITES Transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.

-

-

-

... More
20mmNB Sch above 80 but upto 160(TIG)

6.59

110

725.3

... More
20mm NB Sch XX Strong (TIG)

0.33

122

40.5

... More
50 mm NB, Schedule more than 40 but upto 80

12.99

207

2695.04

... More
50 mm NB, Schedule above 80 but upto 160

0.65

231

150.38

... More
80 mm NB, Schedule upto 40

1.98

305

603.8

... More
80 mm NB, Schedule more than 40 but upto 80

0.1

340

34.09

... More
100 mm NB, Schedule upto 40

2.87

393

1128.11

... More
100 mm NB, Schedule more than 40 but upto 80

0.14

438

61.37

... More
CME02002XX Height Factor: Payment will be made based on actual execution as per item description CME02002XX.

1

1088

1088.04

... More
CARBON STEEL PIPING FOR HYDROCARBON SERVICES (WITH WELDING ELECTRODE E-6010 / E-7018) - OFFSITES Transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.

-

-

-

... More
20mmNB Sch above 80 but upto 160(TIG)

10.66

107

1141.05

... More
20mm NB Sch XX Strong (TIG)

0.53

119

63.31

... More
50 mm NB, Schedule more than 40 but upto 80

18.6

201

3753.29

... More
50 mm NB, Schedule above 80 but upto 160

0.93

225

209.42

... More
80 mm NB, Schedule upto 40

9.37

297

2786.17

... More
80 mm NB, Schedule more than 40 but upto 80

0.47

331

155.96

... More
100 mm NB, Schedule upto 40

2.93

382

1120.14

... More
100 mm NB, Schedule more than 40 but upto 80

0.15

426

63.99

... More
150 mm NB, Schedule upto 40

5.61

628

3524.03

... More
150 mm NB, Schedule more than 40 but upto 80

0.28

686

192.29

... More
250 mm NB, Schedule above 20 but upto 40

5.94

1114

6612.6

... More
250 mm NB, Schedule more than 40 but upto 80

0.3

1337

401.36

... More
CME02004XX Height Factor: Payment will be made based on actual execution as per item description CME02004XX.

1

4003

4003.85

... More
EXTRA FOR IBR GRADE CARBON STEEL PIPING Extra for IBR grade carbon steel piping. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose.

-

-

-

... More
20mm NB Sch above 40 but upto 80

0.08

21

1.7

... More
20 mm NB, Schedule above 80 but upto 160

1.55

22

34.57

... More
50 mm NB, Schedule more than 40 but upto 80

0.83

50

41.87

... More
50 mm NB, Schedule above 80 but upto 160

0.04

56

2.25

... More
100 mm NB, Schedule upto 40

2.87

95

274.31

... More
100 mm NB, Schedule more than 40 but upto 80

0.14

106

14.93

... More
CARBON STEEL PIPING JOINTS FOR HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6010 / E-7018) Transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.

-

-

-

... More
20mmNB Sch above 80 but upto 160(TIG)

168

321

53949.84

... More
20mm NB Sch XX Strong (TIG)

33.6

358

12040.9

... More
50 mm NB, Schedule more than 40 but upto 80

73.2

605

44312.35

... More
50 mm NB, Schedule above 80 but upto 160

24

675

16212.96

... More
80 mm NB, Schedule upto 40

72

892

64226.88

... More
80 mm NB, Schedule more than 40 but upto 80

26.4

995

26279.88

... More
100 mm NB, Schedule upto 40

15.6

1146

17891.64

... More
100 mm NB, Schedule more than 40 but upto 80

4.8

1279

6143.33

... More
150 mm NB, Schedule upto 40

22.8

1884

42967.06

... More
150 mm NB, Schedule more than 40 but upto 80

7.2

2060

14833.66

... More
250 mm NB, Schedule above 20 but upto 40

16.8

3342

56154.17

... More
250 mm NB, Schedule more than 40 but upto 80

4.8

4013

19265.42

... More
CME02008XX Height Factor: Payment will be made based on actual execution as per item description CME02008XX.

1

74855

74855.62

... More
EXTRA FOR IBR GRADE CS PIPING JOINTS Extra for IBR grade carbon steel piping joints. For IBR piping jobs, the scope of contractor shall be liasoning with IBR authorities including approval of drawings / documents from IBR authorities and also getting the final approval of the job from IBR authorities including payment of any fee or charges to IBR authorities for this purpose (20% of joints).

-

-

-

... More
20mm NB Sch above 40 but upto 80

4.8

50

244.46

... More
20 mm NB, Schedule above 80 but upto 160

24

53

1284.48

... More
50 mm NB, Schedule more than 40 but upto 80

7.2

121

871.7

... More
50 mm NB, Schedule above 80 but upto 160

2.4

135

324.26

... More
100 mm NB, Schedule upto 40

19.2

229

4404.1

... More
100 mm NB, Schedule more than 40 but upto 80

7.2

255

1842.98

... More
CARBON STEEL PIPING JOINTS FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6013) Transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%. 5. Payment of tapping points will also be made extra on joint basis, as the measurement is on joint basis.

-

-

-

... More
20mmNB Sch above 80 but upto 160(TIG)

108

330

35659.44

... More
20mm NB Sch XX Strong (TIG)

21.6

368

7953.12

... More
50 mm NB, Schedule more than 40 but upto 80

93.6

622

58257.58

... More
50 mm NB, Schedule above 80 but upto 160

31.2

694

21655.61

... More
80 mm NB, Schedule upto 40

13.2

917

12106.51

... More
80 mm NB, Schedule more than 40 but upto 80

4.8

1022

4909.39

... More
100 mm NB, Schedule upto 40

19.2

1179

22640.83

... More
100 mm NB, Schedule more than 40 but upto 80

7.2

1315

9468.07

... More
CME02020XX Height Factor: Payment will be made based on actual execution as per item description CME02020XX.

1

34530

34530.11

... More
RADIOGRAPHY OF PIPING WORKS Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of providing sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instruction of the Engineer-in-Charge.

-

-

-

... More
For Pipes (Per Inch Dia)

1033.5

329

340724.28

... More
HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/deblinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools andtackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. In case of Hydrotest Failure, Re-testings shall be carried out at no extra cost. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

15.81

13

219.28

28.95

38

1117.47

10.4

76

794.87

... More
100 mm

5.32

98

522.8

... More
150 mm

5.15

161

830.2

... More
250 mm

5.44

247

1344.28

... More
FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.

-

-

-

230

57

13254.9

139

96

13350.95

71

153

10910.57

... More
100 mm

29

192

5570.61

... More
150 mm

19

288

5474.66

... More
250 mm

14

480

6723.22

... More
EXTRA FOR FIXING / REMOVAL OF RTJ FLANGES / BLIND FLANGES Extra for opening / fixing etc. of RTJ flanges / blind flanges / spool pieces for lapping etc.

-

-

-

230

3

883.2

139

9

1334.4

71

15

1091.27

... More
100 mm

29

19

557.09

... More
150 mm

19

28

547.39

... More
250 mm

14

48

672.28

... More
PREPARATORY JOBS FOR HOT WORK The job includes opening of flanges, blinding / deblinding by bolting / debolting etc. fabrication of tail blinds, cover plate connections fittings etc., elbow reversing, opening and fixing of plugs from the furnace tube etc., making hose connections and all other arrangements as required for flushing the lines including wedge opening, dewatering after flushing, decoking, isolation etc., boxing up the lines with new gaskets and hot bolting of all the joints during hot circulation and complete the job with supply of tools, tackles, labours and consumables etc. as per direction of the Engineer-in-Charge.

-

-

-

230

56

13050.2

139

141

19718.54

71

226

16114.87

... More
100 mm

29

283

8227.88

... More
150 mm

19

425

8085.83

... More
250 mm

14

709

9930.06

... More
SUPPORT PAD WELDING OF PIPES The job involves transportation of all items including all types of structures, pipes etc. from owner's storage point to work site and / or prefabrication yard and welding including cutting / grinding / edge preparing and required testing to prove soundness of welding with supply of all consumables, manpower, tools as per technical specification and direction and satisfaction of the Engineer-in-Charge.

-

-

-

... More
For pipe Dia 50 mm

12

285

3422.16

... More
For pipe Dia 80 mm

2.4

312

749.9

... More
For pipe Dia 100 mm

4.8

336

1616.16

... More
For pipe Dia 150 mm

1.2

388

465.85

... More
For pipe Dia 250 mm

2.4

488

1171.66

... More
INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of heavy equipment (other than transportation) to be envisaged by Engineer in Charge and to be arranged separately, if r equired, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
For Valves (other than RTJ)

4238

30

129386.14

... More
CME07001XX Height Factor: Payment will be made based on actual execution as per item description CME07001XX.

1

25877

25877.23

... More
REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Dismantling and removal of all types of flanged including RTJ valves, level troll, fire hydrant, monitor by debolting/ cold/ hot cutting of fasteners wherever required from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner's storage point / workshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direction of the Engineer-in-Charge including all labour, tools, tackles, consumables and supervision etc. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC.

4238

22

97050.2

... More
CME07002XX Height Factor: Payment will be made based on actual execution as per item description CME07002XX.

1

19410

19410.04

... More
HYDROTESTING OF GATE/GLOBE/ CHECK/ BUTTERFLY/ PLUG VALVES Job involves collection of valves from stores, go-down etc. transportation to testing bay or contractors' own premises, test the val ves for seat, body and backseat at recommended pressure including cleaning and greasing, transport back as per instruction and satisfaction of the Engineer-in-Charge. Requirement of heavy equipment to be envisaged by Engineer in Charge and to be arranged separately, if required, as the same in not included in the item rate.

-

-

-

46

105

4859.44

46

211

9720.26

26

338

8789.82

... More
100 mm

10

422

4226

... More
150 mm

6

633

3803.46

... More
250 mm

4

1056

4226.04

... More
FABRICATION OF PLATE FLANGES Fabrication of plate flanges for the given plate and shifting of material for store to work place and fabricating as per drawing and instruction of Engineer-in-Charge.

-

-

-

... More
Upto size Dia 50 mm

25

58

1463

... More
Above Dia 50 mm and up to Dia 100 mm

25

117

2926

... More
Above Dia 100 mm and up to Dia 200 mm

25

253

6338

... More
Above Dia 200 mm and up to Dia 300 mm

25

380

9507

... More
FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC. The job includes getting the materials issued, transportation to work site and handling at site, fabrication at the required size and shape using steel pipes, MS structural / plates etc. by cutting, bevelling and welding including fixing of MS gratings / chequered plates on platform at all elevation by welding, bolting or otherwise to existing members or equipment. This also includes fabrication and fixing of pipe clamps, non-standard bolts etc. inclusive of labour, consumables, heavy equipment, tools and tackles and materials required for U-clamps, J-bolts etc. and complete in all respect as per drawings, specifications and instructions of the Engineer-in-Charge. (Excluding cost of structural steel).

-

-

-

... More
FABRICATION AND ERECTION OF PIPE SUPPORT / PLATFORMS / DAVITS / STAIR CASE ETC.

1.2

30418

36501.94

... More
DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC. Removal of existing platforms / pipe supports / davits / stairways etc. along with adjacent fittings / members by cutting / debolting or by any other means without damaging the remaining unit and lowering down to the ground, retrieving of all the usable materials and transportation to the storage point as directed by the Engineer-in-Charge and complete in all respect with all labour, tools, tackles, heavy equipment, consumables and supervision etc. as per the direction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
DISMANTLING OF STRUCTURALS LIKE PIPE SUPPORT / STAIRWAY / DAVITS ETC.

1.2

13014

15616.91

... More
HANDLING / ERECTION OF FABRICATED PIPES / COIL ASSEMBLIES The job includes getting the materials issued, transportation to work-site, handling and care at work-site, erecting the fabricated item at position and fixing, aligning and making connections to the companion pipe etc. And complete in all respect with all labour, tools, tackles, heavy equipment, and supervision etc. as per the direction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
HANDLING / ERECTION OF FABRICATED PIPES / COIL ASSEMBLIES

5

23377

116885.75

... More
DYE PENETRATION TEST FOR PIPING WORKS Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedules of pipes.

-

-

-

... More
For Pipes (Per Inch Dia)

1033.5

55

57204.23

... More
CLEANING OF INTERNAL BORE OF PIPELINES Opening end fittings, jump bends, applying external heating, internal pressures (pneumatic/steam hydraulic), poker rods, hammering, jet blasting etc. for cleaning bore of jammed pipelines with out removing from the site and boxing up the end fittings with new gaskets and complete the job in all respect as per direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.

-

-

-

15.81

73

1155.39

28.95

128

3733.68

10.4

146

1520.17

... More
100 mm

5.32

168

897.22

... More
150 mm

5.15

199

1025.5

... More
250 mm

5.44

313

1703.86

... More
STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site as per ISMS (IndianOil Safety Management System) Standard-1007 on Scaffold Safety with safest and reliable design. Scaffolding design should consider the worst load combination expected during its service period. The supporting structure should be sufficient in strength, stability, and rigidity; The safety of personnel associated with the erection, alteration, and dismantling of the scaffold; the safety of persons using the scaffold; and the safety of persons in the vicinity of the scaffold to be considered mandatorily. Standard Tags for "Fit for Use" in Green Color and "Not Fit for Use" in Red Color to be fitted on scaffolding as per ISMS Standard-1007. Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.

-

-

-

... More
Upto 6 M

672

101

68288.64

... More
Above 6 m upto 10 m

448

145

65036.16

... More
Above 10 m upto 20 m

224

203

45523.52

... More
Intermediate plate form

300

169

50808

... More
HEAT TREATMENT Heat treatment of shop fabricated for already installed piping / static equipment etc. for joints or other operations wherever required. Heating to be carried out in a furnace or by using an electric resistance or induction heating equipment ensuring uniform temperature attainment at all points of the portion being heat-treated. The portion under heat treatment shall be wrapped suitably under insulation to avoid any harmful temperature gradient. The temperature thus attainted in the portion under heat treatment shall be recorded by means of thermocouples, pyrometer and an automatic temperature recorders suitably calibrated should be employed. The calibration chart of each recorder along with hardness test results shall be submitted to the Engineer-in-Charge for approval. The details of heat treatment such as heating rate, soaking temperature pause period and cooling rate etc. to be carried out as per relevant standards / code as instructed by the Engineer-in-Charge.

-

-

-

... More
For Pipes (Per Inch Dia)

35

478

16735.6

... More
Applying priming coat with ready mixed primer of approved brand and manufacturer at all heights over steel surfaces like structures, columns, pipes, vessels, tanks etc. as per manufacturers specifications and directions of the Engineering-in- Charge; all complete including cleaning the surface using emery papers/ Power tool cleaning such as ST-2 or ST-3 as per requirement, including all material, consumables, tools, tackles, labour etc but excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates.

-

-

-

... More
Inorganic Zinc Silicate primer to achive a minimum DFT of 65-75 microns (one or more coat of 65-75 micron each).

20

162

3242.2

... More
Two pack epoxy phenolic primer to achive a minimum DFT of 300 microns (2 or more coats of 150 micron each)

20

290

5801.4

... More
Taking out old worn out damaged insulation materials of any thickness including wool, mattress, pre-formed sections or any other insulating materials including cladding of aluminium or GI sheet from any height and location etc. complete and transporting and stacking the serviceable materials to owner's storage point and damaged materials within 2.00 km lead inside Refinery .The job also includes cleaning the site, transporting the materials to directed place at any height, complete with all labour and materials etc. as per specification and direction of Engineer-In-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).

10

32

329.9

... More
Taking out old worn out damaged cladding of any thickness (plain or corrugated; GI or Aluminium sheet) from any height and location and transporting and stacking the serviceable materials to owner's storage point and damaged materials to the directed place within refinery premises within 2.00 km lead. The job also includes cleaning the site, transporting the materials to directed place, complete with all labor and materials etc.as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).

10

16

165

... More
"Fixing cladding with new/ old aluminium/ GI sheets, plain or corrugated. The job includes cutting, bending and grooving to proper s hape and size, providing minimum 50mm overlaps on both longitudinal and circumferential joints including end termination/cap and securing the overlaps alternately by POP rivets and self-tapping screws at every 150mm c/c, and securing additionally with metalic bands at a maximum spacing of 300mm c/c at any height and location with all labour, materials etc. complete as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment of above shall be made on the area of the finished surface). Note: 1. Screw, required for metal jacket securement shall be SS /Cadmium plated steel self tapping , type A No.8 Dia*12mm long to BS 4176 complete with Neoprene washers under the head. Rivets required for metal jacket securement shall be the expanding aluminium ""POP"" blind eye type/SS, 9.5mm long* 5mm dia. 2. For additional securement of cladding, Band, SS 12mm (Min.) wide *24SWG thick is to be used for pipings and Band, SS 20mm wide *24SWG thick is to be used for equpiments. 3.For ensuring perfect water proofing, all the cladding joints shall be sealed with approved elastomeric metal sealant. 4. For insulations with vapour barrier, cladding shall not be applied until the vapour barrier has completely dried and solvents have dissipated. Self tapping screws/ rivets shall not be used to secure aluminium cladding as they may puncture the vapour barrier."

-

-

-

... More
New / old aluminium / GI plain / corrugated sheets issue by the owner free of cost.

10

125

1258.5

... More
Aluminum sheet- Plain - 24 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 31000, Condition H3 - to be arranged by contractor

10

568

5680.4

... More
Aluminum sheet - Plain - 22 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 31000, Condition H3 - to be arranged by contractor

10

688

6882.8

... More
Providing and fixing single/ multiple layer of machine stitched LRB mineral wool mattresses conforming to IS:8183/ASTM C 592, Class-II, faced on one side with 20mm galvanised 22 SWG wire mesh, suitable for temperature up to 550 Deg C, in required thickness over the pipings and technological equipments like columns, vessels, ducts, horton spheres, storage tanks etc., including cleaning of the surface with wire brush, fixing the insulation mattresses in position and securing the same properly etc. all complete with tools, tackles, materials such as lacing, binding, stitching wire, labour etc. complete in accordance with the specifications laid down in the contract, latest IS standards and as per the directions of Engineer-in-Charge; but excluding the cost of scaffolding. "Note: 1. Contractor has to make his own arrangement for procurement and storage of all the materials and has to produce manufacturer's test certificate in support of characteristics of insulation materials i.e. 'K' value, density etc. 2. The joints of fibrous insulation material shall be tightly butted and laced together with 1mm dia galvanised lacing wire. 3. Insulation thickness more than 75mm shall be in multi layers. 4. Each layer of the piping insulation shall be secured firmly in place with atleast 3 loops of 24SWG thick x 12mm wide SS bands, one loop to be placed not more than 75mm from each end and atleast one loop shall be equally spaced betweeen two end loops. 5. Shells of equipments shall be secured by 24SWG thick x 20mm wide SS bands at every 225mm c/c 6.The item includes disposal of the debris to the directed place within 2km lead as per the direction of Engineer-in-Charge. "

-

-

-

... More
LRB mattress of density 100 kg/cum - 50mm Thick

10

358

3582.3

... More
LRB mattress of density 100 kg/cum -75mm Thick

10

462

4629.9

... More
Surface cleaning to Sa 2-1/2 Swedish Specification by Grit/shot blasting (extra over St-2 / St-3 cleaning) by using abrasive materials of size range 16 to 30 (~0.6 to 1.2 mm) mesh like copper grit / shot etc as per relevant standard and direction of Engineer -in -Charge on pipelines to Sa 2-1/2 Sweedish specifications in position at all heights including all materials, equipments, tools and plants, consumables, labour etc complete in all respect as directed by Engineer-in-Charge but excluding cost of scaffolding. Compressed Air shall be in the scope of contractor (Contractor will have to make is own arrangement for compressor etc. for arranging required air for blasting).

-

-

-

... More
PIPE Dia NB 50

28.95

27

797.28

... More
PIPE Dia NB 80

10.4

40

422.24

... More
PIPE Dia NB 100

5.32

52

277.76

... More
PIPE Dia NB 150

5.15

76

395.44

... More
PIPE Dia NB 250

5.44

124

678.42

... More
Shutdown Factor @25% on SOR rates (Item 10 - 1520)

1

551269

551269.53

... More
(PF @12% + PF Admin @0.5% + EDLI @0.5%) on Mechanical Part (Item 10 - 1520)

1

43847

43847.04

... More
(PF @12% + PF Admin @0.5% + EDLI @0.5%) on Civil Part (Item 1530 - 1700)

1

638

638.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.