Indian Oil Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date31 Jan 2025
Closing Date14 Feb 2025
Tender Amount₹ 42,58,951 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.

4500

4

18945

... More
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.

7000

2

18900

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.

35

2443

85531.6

... More
1:2:4 (1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).

35

7191

251710.9

... More
Cement mortar 1:6 (1 cement : 6 coarse sand).

35

4126

144443.95

... More
Cement mortar 1:4 (1 cement : 4 coarse sand).

35

4896

171386.6

... More
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works.

650

52

34430.5

... More
Painting (one or more coats) on rain water, soil waste and vent pipes and fittings with synthetic enamel paint of approved brand and manufacture and required colour on old work :

-

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - One or more coats on old work.

650

82

53846

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade-Two or more coats on new work.

650

125

81848

... More
Providing half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in cement mortar 1:3 (1 Cement : 3 coarse sand) in superstructure for closing cavity 5 to 7.5 cm wide in cavity wall complete with 10 cm / 11.4 cm wide bitumen felt type 3 grade 1.

700

269

188881

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed:

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, for all lift including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil.

200

193

38740

... More
Lettering with black Japan paint of approved brand and manufacture. Note: Rate EACH (EA) stands for "Per letter per cm height".

12000

3

37200

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift.

150

135

20305.5

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.

38000

12

459040

... More
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.

80000

6

493600

... More
Supplying and applying various epoxy and other protective intermediate / finish paints of approved brand and manufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, vessels, equipments, concrete floors etc. as per manufacturers specification and directions of Engineer-in-charge all complete including all materials, labours, tools-tackles and consumables etc but excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve required DFT by applying more coats (if required) within the relevant SOR item rates.

-

-

-

... More
Aluminium finish paint (IS-2339) to achive a minimum DFT of 40 microns (Two or more coats of 20 micron each)

1000

140

140600

... More
DISMANTLING OF FLOATING/FIXED ROOF TANK Retrieving all existing fittings, instruments, foam seals, side railings, dismantling of damaged corroded shell / roof of welded oil storage tank by gas cuttings/cold cutting or any other suitable means as directed by engineer in charge and transporting them to storage point/ scrapyard as designated without disturbing / damaging any portion of existing piping, equipment, tank and complete in all respect with all labour, tools, machineries, supervision etc. Requirement of heavy equipment to be envisaged by Engineer-in-Charge and to be arranged separately, if required, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
Roof : Dismantling of complete roof/ structural/ shell/ course/ truss: Retrieving all the existing fittings, instrumentations, side rails, etc. by gas cutting/ cold cuttings directed by Inspection/ site engineer. And shifting of dismantled roof plates, structural etc. to ground (only scrap) to transport and kept properly the same in scrap yard after taking/ recording weight. During the entire job all safety norms to be followed in any case. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete roof plate minus 10% corrosion correction.

3.5

21474

75160.16

... More
Shell: Dismantling of shell course retrieving/ removing of shell plates. Retrieving all existing manholes/ nozzles/ fittings, instrumentation, side rail etc. by gas cutting/ cold cutting as directed by EIC. Shifting of all scrap to scrap yard/ designated location as per EIC after taking and recording weight. During the entire shifting job, all safety norms to be followed. Note: The measurement of dismantling, shall be calculated based on actual area of shell plate replaced minus 10% correction corrosion.

3.5

13049

45672.8

... More
Bottom: Dismantling of bottom (Annular) plates completely: Dismantling of bottom (Annular) plates, job involves cutting of bottom plateand shell to bottom plate welding, jacking of shell. And also cutting of annular to sketch plate cutting. Dismantling of bottom (sketch) plate: Dismantling of bottom (sketch) plates by gas cutting and roof to be properly supported and handing over to civil maintenance for tank bottom foundation repair. Shifting of roof support as and when required to facilitate repair/ relaying of foundation. Note: The measurement of dismantling, shall be calculated based on actual area laid of complete bottom sketch plate minus 10% corrosion correction.

3.5

18933

66266.2

... More
DISMANTLING OF STAINLESS STEEL PIPING BY HOT WORK (INSULATED / UNINSULATED) Dismantling and removal of above ground or overhead / underground in trenches/ redundant/ steam traced/ insulated/ uninsulated piping of stainless steel by grinding / gouging / plasma cutting from various locations such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalter etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc.; transporting and stacking the salvageable useful materials to workshop / instrument workshop / store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises all complete as per the instructions of engineer in-charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
50 mm NB

250

107

26977.5

... More
80 mm NB

350

189

66220

... More
100 mm NB

350

256

89838

... More
150 mm NB

350

402

140850.5

... More
PF &ESI as Per OF CIVIL SOR @ 1.87%

1

56687

56687.91

... More
PF & ESI as Per OF MECH SOR @ 1.99%

1

10168

10168.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.