Indian Oil Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indian Oil Corporation Limited - IOCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date10 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 20,91,138 
Notes
Download

Costs

Summary

Dre024k127 Repair And Application Of Refractory In Various Equipments Of Iocl Digboi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removal of old muffle blocks (Burner Tiles) assembly from heater radiant section including lifting and pulling with all tools, tackles, lifting arrangement, refractory bricks supporting arrangement etc. all complete. EA shall mean complete set of burner tiles for one burner.

7

17430

2490

... More
Lowering and shifting of muffle blocks (Burner Tiles) assembly from site position and disposal at scrap yard or other location within Plant. EA shall mean complete set of burner tiles for one burner.

7

10458

1494

... More
Transportation of new muffle blocks (Burner Tiles) assembly from IOCL store to work site with necessary safety to avoid any damage during shifting EA shall mean complete set of burner tiles for one burner.

2

996

498

... More
Lifting and installation of new muffle blocks (Burner Tiles) assembly properly and safely in CDU/VDU Heater including required refractory repair if any with tools, tackles, lifting arrangement etc. all complete. (Supply of Muffle block assembly and refractory material will be in IOCL Scope) EA shall mean complete set of burner tiles for one burner.

7

95865

13695

... More
Gap filling between existing ceramic modules & bricks on walls/roofs of heater, boiler with ceramic blanket including removal of old filling, all tools and tackles as per direction of Site Engineer/EIC. Scaffolding, ceramic blankets shall be in scope of owner. Floor/wall/roof area shall be considered for measurement.

500

298800

597.6

... More
Dismantlling of refractory work, inside the heaters, of insulating blocks and insulation fire bricks, removing them carefully without causing damage and stacking the good pieces inside for reusing and taking out the damaged pieces outside the heaters, cleaning the salvaged materials for reusing, all labour, materials etc complete excluding the cost of scaffolding. Item includes disposal of debris to the directed place within 100m lead as per the instruction of the Engineer-in-Charge.

5

4170

834.14

... More
Dismantilling of refractory masonry work in walls, floors and other locations with fire bricks or refractory castables etc., removing them carefully without causing damage and stacking the good pieces inside for reusing and taking out the damaged pieces outside the heaters, cleaning the salvaged materials for reusing, all labour, materials etc. complete excluding the cost of scaffolding. Item includes disposal of debris to the directed place within 100m lead as per the instruction of Engineer-in-Charge.

5

8708

1741.62

... More
Taking out loose fitted fire bricks from the floors of heaters etc. including stacking the serviceable fire bricks properly after cleaning and taking out the debris outside the heater and disposal of debris within a radius of 100M as instructed by the Engineer-in-Charge etc. complete but excluding cost of scaffolding.

5

2230

446.19

... More
Labour charges for repairing the burner arches and sides of size (0.8x0.4x0.4m) from inside the heater with Firecrete super or other repairing refractory materials including chipping off slag and other undulation, plastering the surface for bringing it to the design, dimension, curing etc. with all tools, tackles, labour etc. complete but excluding cost of scaffolding. Refractory shall be issued as a Free Issue material.

10

7789

778.96

... More
Labour charges for replacement of ceramic ferrules inside main Burner of SRU including removing damaged ferrules from tubes and replacing with new material, with all tools, tackles, labour etc. complete as per direction of Engineer-in-Charge. Ceramic ferrules shall be issued as a Free Issue material.

25

470

18.83

... More
Labour charges for laying the fire bricks in the floors of heaters and burners with old/ new fire bricks loose without any joint after proper cleaning etc. including transporting bricks from Refinery Stores etc. complete but excluding cost of scaffolding. Fire Bricks shall be free issue material.

5

6019

1203.96

... More
Labour charges for refractory masonry inside heaters, flare ducts, chimney, boilers etc. with fire bricks of different size and shape laid on fire clay refractory powder/ mortar etc. as per drawing, all labour, tools and tackles including transportation of material from store but excluding cost of scaffolding. Refractory bricks and mortars shall be Free Issue materials.

5

7915

1583.11

... More
Removing and cleaning the fire deposits and scales on the surface of boiler tubes and other external surfaces of the walls of boiler, with wire brushes, coir ropes, gunny bags, chain etc upto the satisfaction of Engineer-in-Charge, cleaning the floor, throwing the debris outside the boiler upto 100M distance, all labour materials etc. complete excluding the cost of scaffolding. (Measurements will be based on surface area of wall, floor etc.)

250

10890

43.56

... More
Repairing the refractory lining including repair of cracks in floor and walls of refractory lining in heater and flue ducts by racking out the joints and pointing with refractory mortar including transporting of materials from store disposal of debris outside heater upto a distance of 50M etc. complete with all labour, tools and tackles, etc. complete (Refractory materials to be supplied free of cost), excluding cost of scaffolding. (Measurements will be based on surface area of wall and floor etc).

250

2802

11.21

... More
Concrete Lining with Refractory castables: Refractory concrete Lining with dense refractory castables or insulating castables or any other equivalent castables in any vessels, equipments, pipings, burner blocks, lining work inside heaters, boilers, chimney etc. as per manufacturer's specifications, drawings and directions of Engineer-in-Charge including curing, all labour and materials, all tools and tackles etc. complete but excluding cost of shuttering/ form work which shall be paid separately. Item excludes the cost of scaffolding. Only refractory materials such as castables shall be issued free of cost from Owner's stores. Item includes the transportation of such materials from Owner's stores to the work site and disposal of the debris within 100m lead to the directed place as per the instructions of Engineer- in-Charge.

5

25586

5117.29

... More
API-936 Certified Refractory Inspectors: Deployment of API-936 Certified Refractory Inspectors during shutdwon of all process units of Refineries and providing the services as below, but not limited to, such as : *Inspection of installed refractory and provide recommendations. *To ensure that material and applicator qualification test results are line with job requirement and are fully documented *To inspect and physically verify that installation of hex-mesh, V-Bar S-Bars or other anchors has been carried out as per the design / drawing of refractory lining job. *To carry out physical verification of refractory materials before installation and ensure the same are in line with the engineering drawings/ datasheet. *To check and verify that accurate refractory installation procedures *To monitor, guide and assist owner and contractor to ensure desired progress of work *To assist owner and contractor in maintaining safety procedure / conditions *To check and verify accuracy of refractory Dry-out procedures *To inspect and test installed linings before Dry-out and after Dry-ou *To notify the owner and the contractor of any work deficiencies or potential deficiencies *To record all non-conformances and / or potential problems *To intimate conflicts, if any, between the specified execution plan and the actual installation procedures or installed refractory quality results *To prepare inspection report at suitable intervals *To certify that all the anchoring systems and refractory lining jobs including selection of all materials, installation, and Dry-out procedures have been carried out as per design / drawing / OEM / Manufacturer’s recommendation and direction of Engineer-in-Charge. with all manpower, material, tools and tackles, equiments, comsumables etc as per the direction of Engineer-in-Charge. Travel expenses: The rates are inclusive of To and Fro Travel expenses of the Refractory Inspectors prior to and after completion of deployment at the Refinery location. However, To and Fro transport facility from Stay accommodation to Refinery shall be arranged by the Owner Free of Cost during the period of deployment. "Accommodation expenses: The rates are exclusive of Hotel accommodation charges during the period of deployment. Stay accommodation for the Refractory Inspectors shall be provided by the Owner free of cost in their Guest House / Transit Accommodation / Nominated Hotel located near the Refinery. In case of non-availability of Owner’s accommodation, actual expenses towards Hotel accommodation for both the Refractory Inspectors in a single room (on double occupancy basis) in a Three-star or equivalent hotel from evening of one day prior to start of deployment up to next morning of last day of deployment shall be reimbursed on submission of valid documents. Note: EA stands for working for 12 Hours shift in Day or Night Separate Refractory Inspectors shall be deployed for Day and Night Shifts.

8

173340

21667.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.