Indian Oil Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indian Oil Corporation Limited - IOCL Tender

Works
Civil And Construction
Eprocure
Opening Date27 Feb 2024
Closing Date12 Mar 2024
Tender Amount₹ 97,64,537 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (INCLUDING HEAVY EQUIPMENT CHARGES) Transportation of vessel/ columns/ filters/ drums etc. from owner's storage point to worksite, assembly of parts, sub-assemblies (including internals), erection at all elevations, aligning, tightening of bolts, grouting, cleaning, hydrotesting and flushing by water, draining, drying by compressed air and installation of all mountings and completing the works in all respects including earthing protection by way of fixing strips and electrodes as per drawings and specifications. Job also includes supplying of all types of tools, tackles, lifting arrangements, heavy equipment, machineries all consumables and labour to complete the job in a workman like manner, area preparation for hot job and area cleaning after completion of work including blinding, deblinding, removal of insulation, gas cutting of bolts, chipping of foundation, flushing wherever required. All jobs are to be carried out as per the instruction and to the full satisfaction of the Engineer-in-Charge. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
INSTALLATION OF VESSELS/ COLUMNS/ DRUMS/ FILTERS MORE THAN 10 MT AND UPTO 20 MT (INCLUDING HEAVY EQUIPMENT CHARGES)

15

-

26333.35

... More
OPENING AND BOXING UP OF MANHOLES The job involves opening of cover, man holes, by opening of bolts and nuts, cold/hot cutting of corroded fasteners, boxing up by using new and proper rating gasket after cleaning of gasket faces and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.

-

-

-

... More
Dia 18" to 24"

2

-

909.23

... More
MAINTENANCE OF VESSEL/ COLUMN The job includes blinding/ de-blinding, hose connections for steaming, water flushing, air flushing, and entry permit of vessel, opening of manholes, hand holes, vent etc., thorough cleaning of internal surface and fittings, removal and refitting of components, strainers after cleaning. Removal, reloading/ replacement of activated charcoal, raching rings etc. including transportation of material and disposal of the refusal and minor repairs like weld build up of the scarred portion/ pitted area wherever required etc. gasket cutting at the required sizes from gasket sheet and replacing the same including cleaning of joint surface. Final blinding / de-blinding, boxing up and other necessary piping connections, hydraulic testing, hot bolting of all joints during hot circulation as per requirement and as instructed by Engineer-in-Charge (area of shell internal surface and trays/ baffles top and bottom to be measured separately). Note: Tray and packing related jobs shall be paid extra. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

69

-

574.17

... More
WELD DEPOSIT ON PITTED SURFACE Grinding / cleaning of pitted / corroded area and filling the pitted surface by weld deposit and grinding / smoothening the surface as required and complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc.

-

-

-

... More
CS weld deposit for vessel / heat exchanger / column etc. (upto 2.5mm depth)

1000

-

18.32

... More
STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site as per ISMS (IndianOil Safety Management System) Standard-1007 on Scaffold Safety with safest and reliable design. Scaffolding design should consider the worst load combination expected during its service period. The supporting structure should be sufficient in strength, stability, and rigidity; The safety of personnel associated with the erection, alteration, and dismantling of the scaffold; the safety of persons using the scaffold; and the safety of persons in the vicinity of the scaffold to be considered mandatorily. Standard Tags for "Fit for Use" in Green Color and "Not Fit for Use" in Red Color to be fitted on scaffolding as per ISMS Standard-1007. Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.

-

-

-

... More
Upto 6 M

100

-

101.62

... More
REPLACEMENT OF GASKETS Job involves opening of all types of flanged joints, valve bonnet etc. by debolting, cold or gas cutting of fasteners, cleaning of flange face revisioning/ replacement of fasteners, providing proper rating of gaskets, and boxing up of flange joint. This also includes necessary capping / decamping of threaded joints, area cleaning, hot bolting etc. torque wrench if required shall be arranged by IOCL on returnable basis. Requirement of scaffolding to be envisaged and decided by Engineer-in-Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
Above 25 mm to 80 mm

36

-

76.13

... More
Above 80 mm to 200 mm

4

-

114.2

... More
Above 450 mm to 600 mm

2

-

570.98

... More
HYDROTESING OF PIPING WORKS Hydrostatic testing of pipelines at the specified pressure including blinding/deblinding, fabrication and fixing of testing connections, pressure gauge installation. Hose pipe connection and making all other arrangements as required and dewatering, flushing and boxing up after fixing proper gaskets with supply of all labour, tools andtackles, instruments and instruction of the Engineer-in-Charge. The job has to be carried out at all elevations. In case of Hydrotest Failure, Re-testings shall be carried out at no extra cost. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
50 mm

48

-

38.6

... More
80 mm

24

-

76.43

... More
Vessel/ Bullet

75

-

270.12

... More
COLD CUTTING OF CARBON / ALLOY STEEL PIPE LINES (INSULATED / UNINSULATED) Cold cutting and removal of above ground or overhead/ underground in tranches/ insulated/ uninsulated pipelines of carbon steel/ alloy steel from various location such as pipe racks, columns, pump house, vessels, heaters, heat exchangers, desalters etc. including removal of insulation materials, all on line instruments, fittings, flanges, valves, vents, drains, branching etc.; lowering down / lifting the same to ground level with due care so that no other piping, equipment, machinery etc. is damaged; cutting into pieces if required; segregating for salvaging useful fittings such as bends, flanges, valves, instruments etc. by unbolting, gas cutting, cold cutting etc. transporting and stacking the salvageable useful materials to workshop / instrument workshop/ store or as per the direction of the Engineer-in-Charge and shifting the scrap pipes etc. to scrap yard or any other location within refinery premises all complete as per the instructions of Engineer-in-Charge. Scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation, taking clearance for hot jobs, blinding and deblinding area cleaning after completion of work, arrangement for flushing wherever required as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. Salvaging of useful fitting from redundant pipe, if done, will be paid under separate item. 3. Civil works (excavation and back filling) for underground dismantling shall be paid separately. Note: For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
50 MM NB

48

-

172.83

... More
80 MM NB

24

-

267.61

... More
CARBON STEEL PIPING FOR NON-HYDROCARBON SERVICE (WITH WELDING ELECTRODE E-6013)- OFFSITES Transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of SW valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch NB, specifications, codes etc. and as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineer-in-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor's scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. 4. Piping up to 40mm NB shall be fully TIG welded. Piping size 50mm NB & above, where TIG welding is used for root run only, the rates to be escalated by 15% and where TIG welding is used for entire joints the rates to be escalated by 20%.

-

-

-

... More
50 mm NB, Schedule more than 40 but upto 80

48

-

207.47

... More
80 mm NB, Schedule upto 40

24

-

305.72

... More
DYE PENETRATION TEST FOR PIPING WORKS Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc. along with all equipment’s, labour, for carrying out the work as per specification and direction of engineer -in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedules of pipes.

-

-

-

... More
For Pipes (Per Inch Dia)

100

-

55.35

... More
RADIOGRAPHY OF PIPING WORKS Performance of radiographic inspection on all type and sizing of piping/ pipe fittings in position at all heights inclusive of providing sources, film, chemicals, and all necessary equipment, consumables etc. complete in all respect as per specification and instruction of the Engineer-in-Charge.

-

-

-

... More
For Pipes (Per Inch Dia)

100

-

329.68

... More
FIXING / REMOVAL OF FLANGES / BLIND FLANGES OF RATING UPTO 300# Opening / fixing etc. of flanges / blind flanges / spool pieces at the two flange joint (rating upto 300#) as and when required for elbow reversing, wedge opening etc. or any other job including handling of flanges and preparation of gaskets from the sheet including tools and tackles, consumables, supervision etc. and as per direction of the Engineer-in-Charge.

-

-

-

... More
50 mm

24

-

96.05

... More
80 mm

12

-

153.67

... More
150 mm

2

-

288.14

... More
INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner's storage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, providing new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, installation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete the job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables and supervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of heavy equipment (other than transportation) to be envisaged by Engineer in Charge and to be arranged separately, if r equired, as the same in not included in the item rate. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately.

-

-

-

... More
For Valves (other than RTJ)

400

-

30.53

... More
Dismnt & Install of Foam Tank (Civil)

-

-

-

... More
EXCAVATION

-

-

-

... More
Earth work in excavation by mechanical m

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift. All kinds of soil.

300

-

134.91

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/ banking excavated or stacked materials:

-

-

-

... More
All kinds of soil.

50

-

87.34

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.

150

-

12.08

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material:

-

-

-

... More
Beyond 30 cm girth up to and including 60 cm girth.

10

-

367.51

... More
Beyond 60 cm girth up to and including 120 cm girth.

5

-

1633.88

... More
Beyond 120 cm girth up to and including 240 cm girth.

10

-

7573.77

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered):

-

-

-

... More
Depth not exceeding 1.5 m.

25

-

134.82

... More
Depth exceeding 1.5 m but not exceeding 3 m.

25

-

145.96

... More
Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):

-

-

-

... More
Depth not exceeding 1.5 m.

25

-

69.57

... More
Depth exceeding 1.5 m but not exceeding 3 m.

25

-

76.72

... More
BACKFILLING

-

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift.

200

-

135.37

... More
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.

10

-

2184.6

... More
DEMOLISHING & DISMANTLING

-

-

-

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge:

-

-

-

... More
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).

50

-

1675.09

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.

10

-

2443.76

... More
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.

15

-

888.04

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:

-

-

-

... More
In cement mortar.

10

-

1416.6

... More
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:

-

-

-

... More
G.S. Sheet.

20

-

122.82

... More
Asbestos sheet.

100

-

57.09

... More
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.

2500

-

4.21

... More
Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres.

1500

-

0.61

... More
Extra for marking of structural steel work required to be re-erected.

2500

-

3.66

... More
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :

-

-

-

... More
15 mm to 40 mm nominal bore.

15

-

105.39

... More
Above 40 mm nominal bore.

15

-

115.86

... More
Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge:

-

-

-

... More
Up to 150 mm diameter.

15

-

239.66

... More
Above 150 mm dia up to 300 mm dia.

15

-

331.04

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.

150

-

225.57

... More
PCC

-

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :

-

-

-

... More
1:3:6 (1 Cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).

50

-

6644.73

... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete - 40mm thick with 20mm nominal size stone aggregate.

150

-

520.28

... More
RCC

-

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

5

-

8126.23

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).

5

-

9405.71

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).

5

-

9797.19

... More
"Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. "

-

-

-

... More
All works up to plinth level: Concrete of M30 grade with minimum cement content of 350 kg /cum

85

-

8600.64

... More
All works above plinth level up to floor V level: Concrete of M30 grade with minimum cement content of 350 kg /cum

45

-

8547.75

... More
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand including finishing the top smooth.

50

-

638.65

... More
BRICK WORK

-

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand).

5

-

6791.85

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand).

5

-

8208.59

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in:

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand).

5

-

821.97

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level:

-

-

-

... More
Cement mortar 1:4 (1 cement :4 coarse sand).

10

-

978.42

... More
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources).

10

-

376.39

... More
Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.

10

-

113.81

... More
PLASTERING

-

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
1:4 (1 cement: 4 fine sand).

20

-

275

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
1:4 (1 cement: 4 fine sand).

20

-

317.61

... More
6 mm cement plaster of mix : "Note: Ceme

-

-

-

... More
6 mm cement plaster of mix : - 1:3 (1 cement: 3 fine sand).

10

-

232.75

... More
Neat cement punning.

10

-

65.54

... More
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.

50

-

207.89

... More
FORMWORK

-

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete.

175

-

318.66

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

50

-

662.11

... More
Suspended floors, roofs, landings, balconies and access platform.

15

-

722.44

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers.

35

-

579.15

... More
Columns, Pillars, Piers, Abutments, Posts and Struts.

75

-

759.19

... More
REINFORCEMENT (In contractor's scope)

-

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level:

-

-

-

... More
Thermo-Mechanically Treated bars.

6500

-

94.05

... More
PAINTING (Concrete & Building)

-

-

-

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water thinnable priming coat with cement primer.

50

-

150.24

... More
Finishing walls with water proofing cement paint of required shade-New work (Two or more coats applied @ 3.84 kg/10 sqm).

50

-

94.83

... More
Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour:

-

-

-

... More
One coat.

25

-

50.29

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

100

-

121.19

... More
Applying priming coat (This item is deleted for SOR 2023).

-

-

-

... More
With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood.

15

-

58.89

... More
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat).

15

-

28.52

... More
Finishing walls with Acrylic Smooth exterior paint of required shade-New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).

100

-

145.59

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - One or more coats on old work.

250

-

82.84

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

250

-

183.27

... More
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour:

-

-

-

... More
One coat.

50

-

75.76

... More
Two coats.

50

-

113.32

... More
White washing with lime to give an even shade: - New work (three or more coats).

10

-

28.5

... More
Colour washing such as green, blue or buff to give an even shade :

-

-

-

... More
New work (two or more coats) with a base coat of white washing with lime.

10

-

39.09

... More
PAINTING (STRUCTURAL WORK)

-

-

-

... More
Applying priming coat with ready mixed primer of approved brand and manufacturer at all heights over steel surfaces like structures, columns, pipes, vessels, tanks etc. as per manufacturers specifications and directions of the Engineering-in- Charge; all complete including cleaning the surface using emery papers/ Power tool cleaning such as ST-2 or ST-3 as per requirement, including all material, consumables, tools, tackles, labour etc but excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates.

-

-

-

... More
Inorganic Zinc Silicate primer to achive a minimum DFT of 65-75 microns (one or more coat of 65-75 micron each).

750

-

162.11

... More
Two pack epoxy phenolic primer to achive a minimum DFT of 300 microns (2 or more coats of 150 micron each)

25

-

290.07

... More
HB Zinc phosphate coating primer to achive a minimum DFT of 30-35 microns (1 or more coat of 30-35 micron )

25

-

64.77

... More
Supplying and applying various epoxy and other protective intermediate / finish paints of approved brand and manufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, vessels, equipments, concrete floors etc. as per manufacturers specification and directions of Engineer-in-charge all complete including all materials, labours, tools-tackles and consumables etc but excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve required DFT by applying more coats (if required) within the relevant SOR item rates.

-

-

-

... More
HB Epoxy MIO to achive a minimum DFT of 100-150 microns (one or more coat of 100-150 Micron).

750

-

133.23

... More
HB Epoxy based Zinc phosphate to achive a minimum DFT of 35-40 microns (One or more coat of 35-40 micron).

25

-

86.75

... More
Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 micron).

750

-

115.69

... More
Surface cleaning to Sa 2-1/2 Swedish Specification by Grit/shot blasting (extra over St-2 / St-3 cleaning) by using abrasive materials of size range 16 to 30 (~0.6 to 1.2 mm) mesh like copper grit / shot etc as per relevant standard and direction of Engineer-in-Charge on steel surfaces like storage tanks, columns, vessels, exchangers, chimneys, steel structures and other flat surfaces including pipelines of 350 NB and above diameters in position at all heights including all materials, equipments, tools and plants, consumables, labour etc complete in all respect as directed by Engineer-in-charge but excluding cost of scaffolding. Compressed Air shall be in the scope of contractor (Contractor will have to make his own arrangement for compressor etc. for arranging required air for blasting).

500

-

140.33

... More
STRUCTURAL STEEL WORK

-

-

-

... More
Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

500

-

98.73

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

15000

-

113.46

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:

-

-

-

... More
Hot finished welded type tubes.

7500

-

151.34

... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required:

-

-

-

... More
In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.

500

-

107.02

... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

750

-

141.55

... More
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer:

-

-

-

... More
M.S. tube.

500

-

153.1

... More
GI PROFILE SHEET

-

-

-

... More
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm + 0.05 %, total coated thickness with zinc coating 120 gsm as per IS: 277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.

550

-

683.7

... More
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm + 0.05 % total coated thickness, Zinc coating 120gsm as per IS: 277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete :

-

-

-

... More
Ridges plain (500 - 600mm).

75

-

449.93

... More
Gutter (600 mm over all girth).

150

-

1110.42

... More
CHEMICAL GROUT

-

-

-

... More
Providing grouting in pockets/bases etc (As per Technical specification), cost of grouting, including supply of materials shall be covered in the unit rates. Rates shall include cost of labor, supervision, deployment of tools & tackles, consumables, materials and other associated arrangements required to execute all the related activities. Grouting using Free flow non shrinkable grout material CONBEXTRA GP-2 or approved equivalent etc WO 28780494 dt 20.04.23 Header Line item 20 Item 8740

1.5

-

16099.35

... More
SCAFFOLDING

-

-

-

... More
STEEL SCAFFLODING (MATERIALS IN CONTRACTOR'S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site as per ISMS (IndianOil Safety Management System) Standard-1007 on Scaffold Safety with safest and reliable design. Scaffolding design should consider the worst load combination expected during its service period. The supporting structure should be sufficient in strength, stability, and rigidity; The safety of personnel associated with the erection, alteration, and dismantling of the scaffold; the safety of persons using the scaffold; and the safety of persons in the vicinity of the scaffold to be considered mandatorily. Standard Tags for "Fit for Use" in Green Color and "Not Fit for Use" in Red Color to be fitted on scaffolding as per ISMS Standard-1007. Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.

-

-

-

... More
Upto 6 M

300

-

101.62

... More
Above 6 m upto 10 m

100

-

145.17

... More
TEMPORARY BARRICADING

-

-

-

... More
Providing temporary barricading on hire charge basis with good conditioned CGI sheets and MS pipe supports up to a height of 10 mtrs from pavement level including providing sand bag bunds at the base of the barricade, jointing, bolting, clamping, binding, dismantling, removing all materials after completion of work complete as directed by EIC with all materials, labour, tools complete. PO 28881347 dt 25.05.2023 Item 1740

125

-

309.05

... More
GRANITE WORK

-

-

-

... More
Stone tile work for wall lining up to 10 m height with special adhesive over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement with an admixture of pigment to match the stone shade. 8mm thick (mirror polished and machine cut edge):

-

-

-

... More
Granite stone of any colour and shade.

6

-

2644.27

... More
LETTER ENGRAVING

-

-

-

... More
Engraving letters in hard stone. Note: Unit "Each" refers to "Per cm height per letter".

100

-

9.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.