Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Eprocure
Opening Date3 Feb 2020
Closing Date21 Feb 2020
Tender Amount₹ 23,83,37,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)

94671

-

-

... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.

173563.5

-

-

... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)

142006.5

-

-

... More
(SH: RCC Slab Culvert 1.50 m Span)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

3053.6

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

709.2

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

1818.48

-

-

... More
Coursed rubble masonry (first sort )

-

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications

172.8

-

-

... More
PCC Grade M20

-

-

-

... More
Height upto 5m

-

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification

133.92

-

-

... More
RCC Grade M20

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
For solid slab super-structure, 20-30% of (a+b+c)

-

-

-

... More
Height upto 5m

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

14.24

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical s

800

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

560

-

-

... More
a) Granular material

-

-

-

... More
(SH: RCC Slab Culvert 2 m Span)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

1485

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

381.6

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

1416.9

-

-

... More
Coursed rubble masonry (first sort )

-

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications

14.4

-

-

... More
PCC Grade M20

-

-

-

... More
Height upto 5m

-

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification

77.7

-

-

... More
RCC Grade M20

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
For solid slab super-structure, 20-30% of (a+b+c)

-

-

-

... More
Height upto 5m

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

11.18

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

600

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

648

-

-

... More
a) Granular material

-

-

-

... More
(SH: RCC Slab Culvert 3 m Span)

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material

1327.4

-

-

... More
Manual Means

-

-

-

... More
Depth upto 3 m

-

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

389.1

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.

585.6

-

-

... More
PCC Grade M15

-

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

365.6

-

-

... More
Random Rubble Masonry

-

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.

19.7

-

-

... More
PCC Grade M20

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification

87.8

-

-

... More
RCC Grade M20

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
Height upto 5m

-

-

-

... More
Reinforcement of RCC work including bending binding and placing in position complete.(a) Cold twisted/TMT bars

12.1

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

398.4

-

-

... More
Granular material

-

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

400

-

-

... More
(SH: RCC Slab Culvert 6 m Span)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

523.8

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

136.8

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

804.78

-

-

... More
Coursed rubble masonry (first sort )

-

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications

3.24

-

-

... More
PCC Grade M20

-

-

-

... More
Height upto 5m

-

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification

73.08

-

-

... More
RCC Grade M20

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
For solid slab super-structure, 20-30% of (a+b+c)

-

-

-

... More
Height upto 5m

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

7.59

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

180

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

302.4

-

-

... More
a) Granular material

-

-

-

... More
(SH: Retaining Wall 3.00 Mtr. Height )

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a

1121.76

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

70.11

-

-

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification

1291.09

-

-

... More
Random Rubble Masonry

-

-

-

... More
Dry Rubble flooring

503.48

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

358.75

-

-

... More
Granular material

-

-

-

... More
(SH: Breast Wall 3.00 Mtr. Height )

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

526

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

52

-

-

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification

648

-

-

... More
Random Rubble Masonry

-

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

300

-

-

... More
Granular material

-

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

400

-

-

... More
(SH: Kutcha Drain )

-

-

-

... More
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres))

15920

-

-

... More
Manual Means

-

-

-

... More
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.)

3980

-

-

... More
Manual Means

-

-

-

... More
(SH: RCC Bridge 40 Mtr. Span )

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

231.8

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
Ordinary rock (not requiring blasting)

231.8

-

-

... More
Manual Means

-

-

-

... More
Depth upto 3 m

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

49.65

-

-

... More
Providing and laying RCC with M-35 concrete (1:1:2) (1 Cement: 1 sand : 2-20 mm nominal size of stone aggregate) in bearing cap, return wall, dirt wall, etc. excluding cost of and reinforcement complete as directed.

-

-

-

... More
In abutment

24

-

-

... More
In abutment Cap

3

-

-

... More
In dirt wall, wing

74

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (C) PCC Grade M25 (p) Height upto 5m Case I Using concrete Mixer

127

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (D) PCC Grade M30 (p) Height upto 5m Case I Using concrete Mixer

49.65

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

15.34

-

-

... More
Providing weep holes 10mm diameter with AC pipe, extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per the drawing and technical specifications.

24

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

33

-

-

... More
SUPER STRUCTURE

-

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (E) PSC Grade M-40 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m

390.34

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (B) RCC Grade M25 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m

-

-

-

... More
a) In kerb

12

-

-

... More
b) in approach slab

12

-

-

... More
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space post for expansion, complete as per approved drawings and technicalbetween vertical specifications.

115

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification

8

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

82.11

-

-

... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification

1.26

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

153400

-

-

... More
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.)

16.9

-

-

... More
Drainage Spouts complete as per drawing and Technical specification

42

-

-

... More
Mastic Asphalt Providing and laying 12mm thick mastic Asphalt wearing coarse on top of deck slab excluding primecoat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laied to required level.

368.9

-

-

... More
PROTECTION WORK

-

-

-

... More
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.)

580

-

-

... More
SUB- STRUCTURE

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

469.3

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

-

-

-

... More
Ordinary rock (not requiring blasting)

469.3

-

-

... More
Manual Means

-

-

-

... More
Depth upto 3 m

-

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

58.06

-

-

... More
Providing and laying RCC with M-35 concrete (1:1:2) (1 Cement: 1 sand : 2-20 mm nominal size of stone aggregate) in bearing cap, return wall, dirt wall, etc. excluding cost of and reinforcement complete as directed.

-

-

-

... More
In abutment

122

-

-

... More
In abutment Cap

1.5

-

-

... More
In dirt wall, wing

75

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (C) PCC Grade M25 (p) Height upto 5m Case I Using concrete Mixer

260

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications (D) PCC Grade M30 (p) Height upto 5m Case I Using concrete Mixer

58

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

34.63

-

-

... More
Providing weep holes 10mm diameter with AC pipe, extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per the drawing and technical specifications.

24

-

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

37

-

-

... More
SUPER STRUCTURE

-

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (E) PSC Grade M-40 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m

157.41

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. (B) RCC Grade M25 Case 1 Using concrete mixer. (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m

-

-

-

... More
a) In kerb

8

-

-

... More
b) in approach slab

20

-

-

... More
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space post for expansion, complete as per approved drawings and technicalbetween vertical specifications.

65

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification

9

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

36.94

-

-

... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification

1.07

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

119800

-

-

... More
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.)

16.9

-

-

... More
Drainage Spouts complete as per drawing and Technical specification

12

-

-

... More
Mastic Asphalt Providing and laying 12mm thick mastic Asphalt wearing coarse on top of deck slab excluding primecoat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laied to required level.

252.65

-

-

... More
PROTECTION WORK

-

-

-

... More
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.)

568

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.