National Highways And Infrastructure Development Corporation Limited Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date1 Feb 2024
Closing Date14 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/ar.pr./p-j(0-40, Pkg-i)/ae/2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHIDC_793195_1Bid Award Id
ViewTender No
NHIDCL/Ar.Pr./P-J(0-40, Pkg-I)/AE/2024Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge/Structural Engineer 1 No.
36
-
-
Senior Pavement Specialist 1 No.
30
-
-
Senior Quality Cum Material Expert 1 No.
30
-
-
Road Safety Expert 1 No.
16
-
-
Sub-Professional Staff
-
-
-
Survey Engineer, 1 Nos.
36
-
-
Assistant Highway Engineer, 2 Nos.(2*30+1*60)
120
-
-
Environmental Engineer, 1 No.
6
-
-
Assistant Bridge Engineer, 1 Nos.
30
-
-
Assistant Quality cum Material Engineer, 2 Nos.
60
-
-
Quantity Surveyor, 1 No.
36
-
-
Electrical Engineer, 1 No.
6
-
-
Horticulture cum Landscaping Expert 1 Nos
16
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager (1 No)
90
-
-
Accountant Cum Cashier (1 No)
90
-
-
Steno cum Computer operator (1 No)
90
-
-
Office Boy (1 No)
90
-
-
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 6000km/month run
-
-
-
Scorpio or equivalent vehicle (not more than 3 years old) (1 nos .)
36
-
-
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
120
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 45 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
1
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
One Office of Minimum 200 sqm area shall be rented at one location in midway of project during Construction Period
90
-
-
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
During Construction Period
30
-
-
During Maintenance Period
60
-
-
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
During Construction Period
30
-
-
During Maintenance Period
60
-
-
Reports and Document Printing
-
-
-
Monthly reports
270
-
-
Half yearly Reports
45
-
-
Various other reports as provided in the Concession Agreement such as Completion Report
6
-
-
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle(39 kms)
8
-
-
Pavement strength measurement using FWD (39 kms)
4
-
-
Bridge inspection using Mobile Bridge Inspection Unit (1.8 Km)
8
-
-
Road signs inspection using Retro Reflectometer (39 km)
8
-
-
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements