Military Engineer Services Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Military Engineer Services - MES Tender

Works
Electrical Works
Eprocure
Opening Date30 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 45,00,000 
Notes
Download

Costs

Summary

Repair/maintenance Of Pump Sets Motors Starter Panels And Allied Works For Water Supply Installation

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Air filter element

4

-

-

... More
Fan belt

2

-

-

... More
Inhibitor Corrosion

30

-

-

... More
Disconnecting/unscrewing of coupling for RKB125/150 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

2

-

-

... More
Coupling set suitable for RKB 125/150 HP pumping set

2

-

-

... More
Replacement of CI impeller

8

-

-

... More
Replacement of MN steel bush

8

-

-

... More
Replacement of gland sleeve

4

-

-

... More
Replacement of body neck ring gun metal

8

-

-

... More
Replacement of pump shaft stainless steel

2

-

-

... More
Key way of impeller disc

6

-

-

... More
Balancing disc

2

-

-

... More
Balancing ring

2

-

-

... More
Diffuser O ring

6

-

-

... More
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 25-26 BHP Capacity . Note:- (i) items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. (iii) Fuel and lubricants required for inspection and testing will be supplied by the Deptt.

8

-

-

... More
Fuel filter element including 'O' ring complete

16

-

-

... More
Lub oil filter element complete

8

-

-

... More
Air filter element

8

-

-

... More
Fan belt

4

-

-

... More
Inhibitor Corrosion

30

-

-

... More
Disconnecting/unscrewing of coupling for 25-26 BHP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

4

-

-

... More
Coupling set suitable for 25-30 HP pumping set

4

-

-

... More
Replacement of CI impeller

12

-

-

... More
Replacement of MN steel bush

12

-

-

... More
Replacement of gland sleeve

8

-

-

... More
Replacement of body neck ring gun metal

12

-

-

... More
Replacement of pump shaft stainless steel

4

-

-

... More
Key way of impeller disc

12

-

-

... More
Bearing DE/NDE

8

-

-

... More
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 60 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in uoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.

2

-

-

... More
Fuel filter element including 'O' ring complete

2

-

-

... More
Lub oil filter element complete

2

-

-

... More
Air filter element

2

-

-

... More
Fan belt

2

-

-

... More
Inhibitor Corrosion

10

-

-

... More
Disconnecting/unscrewing of coupling for 60 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

1

-

-

... More
Coupling set suitable for 60 HP pumping set

1

-

-

... More
Replacement of CI impeller

1

-

-

... More
Replacement of MN steel bush

1

-

-

... More
Replacement of gland sleeve

1

-

-

... More
Replacement of body neck ring gun metal

1

-

-

... More
Replacement of pump shaft stainless steel

1

-

-

... More
Key way of impeller disc

1

-

-

... More
Bearing DE/NDE

2

-

-

... More
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 40 HP Capacity . Note:- (i) items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. (iii) Fuel and lubricants required for inspection and testing will be supplied by the Deptt.

2

-

-

... More
Fuel filter element including 'O' ring complete

2

-

-

... More
Lub oil filter element complete

2

-

-

... More
Air filter element

2

-

-

... More
Fan belt

2

-

-

... More
Inhibitor Corrosion

10

-

-

... More
Disconnecting/unscrewing of coupling for 40 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

1

-

-

... More
Coupling set suitable for 40 HP pumping set

1

-

-

... More
Replacement of CI impeller

1

-

-

... More
Replacement of MN steel bush

1

-

-

... More
Replacement of gland sleeve

1

-

-

... More
Replacement of body neck ring gun metal

1

-

-

... More
Replacement of pump shaft stainless steel

1

-

-

... More
Key way of impeller disc

1

-

-

... More
Bearing DE/NDE

2

-

-

... More
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 7.5 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.

2

-

-

... More
Fuel filter element including 'O' ring complete

2

-

-

... More
Lub oil filter element complete

2

-

-

... More
Air filter element

2

-

-

... More
Fan belt

2

-

-

... More
Inhibitor Corrosion

8

-

-

... More
Disconnecting/unscrewing of coupling for 7.5 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

1

-

-

... More
Coupling set suitable for 7.5 HP pumping set

1

-

-

... More
Replacement of CI impeller

1

-

-

... More
Replacement of MN steel bush

1

-

-

... More
Replacement of gland sleeve

1

-

-

... More
Replacement of body neck ring gun metal

1

-

-

... More
Replacement of pump shaft stainless steel

1

-

-

... More
Key way of impeller disc

1

-

-

... More
Bearing DE/NDE

2

-

-

... More
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 20-25 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in uoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.

4

-

-

... More
Fuel filter element including 'O' ring complete

4

-

-

... More
Lub oil filter element complete

4

-

-

... More
Air filter element

4

-

-

... More
Fan belt

4

-

-

... More
Inhibitor Corrosion

10

-

-

... More
Disconnecting/unscrewing of coupling for 20-25 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately

1

-

-

... More
Coupling set suitable for 20-25 HP pumping set

1

-

-

... More
Replacement of CI impeller

1

-

-

... More
Replacement of MN steel bush

1

-

-

... More
Replacement of gland sleeve

1

-

-

... More
Replacement of body neck ring gun metal

1

-

-

... More
Replacement of pump shaft stainless steel

1

-

-

... More
Key way of impeller disc

1

-

-

... More
Bearing DE/NDE

2

-

-

... More
Takingout & replacement of old unserviceable ball bearing No 7311 BECBP complete all as specified and directed Make SKF/NBC

10

-

-

... More
Takingout & replacement of old unserviceable roller bearing No NU411 complete all as specified and directed Make SKF/NBC

9

-

-

... More
Takingout & replacement of old unserviceable roller bearing No NU319EMZ1C3 complete all as specified and directed Make SKF/NBC

2

-

-

... More
Takingout & replacement of old unserviceable roller bearing No 6319C3 complete all as specified and directed Make SKF/NBC

8

-

-

... More
S&F in repair to dynamo 12/24 Volt including replacement of wiring, bearing, bushing including replacement of copper coil of suitable size and testing on completion and fixing on existing position complete all as specified and directed by Engineer-in-Charge.

1

-

-

... More
M&L for repairs to self starter 12 volts including replacement of armature, bushing, carbon bushes including testing on completion and fixing on existing position complete all as specified and directed by Engineer-in-Charge

1

-

-

... More
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make with pump of head 230 mtr, discharge 140 mtr cube 1485 RPM of capcity 200 HP for repair / replacing of the following accessories

1

-

-

... More
Main shaft made out of MN Steel

1

-

-

... More
Impeller SS of suitablesize

1

-

-

... More
Gland Cap

1

-

-

... More
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 125 HP for repair / replacing of the following accessories

1

-

-

... More
Main shaft made out of MN Steel

1

-

-

... More
Impeller SS of suitablesize

1

-

-

... More
Gland Cap

1

-

-

... More
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 60 HP for repair / replacing of the following accessories

1

-

-

... More
Main shaft made out of MN Steel

1

-

-

... More
Impeller SS of suitablesize

1

-

-

... More
Gland Cap

1

-

-

... More
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 50/40 HP for repair / replacing of the following accessories

1

-

-

... More
Main shaft made out of MN Steel

1

-

-

... More
Impeller SS of suitablesize

1

-

-

... More
Gland Cap

1

-

-

... More
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 20/10 HP for repair / replacing of the following accessories

1

-

-

... More
Main shaft made out of MN Steel

1

-

-

... More
Impeller SS of suitablesize

1

-

-

... More
Gland Cap

1

-

-

... More
Dismantling of induction motor of capacity 200 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

1

-

-

... More
Dismantling of induction motor of capacity 125 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

1

-

-

... More
Dismantling of induction motor of capacity 60 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

1

-

-

... More
Dismantling of induction motor of capacity 50/40 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

1

-

-

... More
Dismantling of induction motor of capacity 10/15/20 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

1

-

-

... More
Dismantling of induction motor of capacity 1.5 to 5 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set

2

-

-

... More
S&F in replacement of antivibration pad to base frame of Pumping set as per sample complete all as specified and directed by Engineer-in-Charge.

8

-

-

... More
Overhauling and calibration of fuel pump of Diesel engine 127 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .

1

-

-

... More
Repair and calibration of injector assembly of Diesel engine 127 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.

1

-

-

... More
Overhauling and calibration of fuel pump of Diesel engine 20-26 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .

1

-

-

... More
Repair and calibration of injector assembly of Diesel engine 20-26 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.

1

-

-

... More
Repair and calibration of injector assembly of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.

1

-

-

... More
Overhauling and calibration of fuel pump of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .

1

-

-

... More
Repair and calibration of injector assembly of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.

1

-

-

... More
Overhauling and calibration of fuel pump of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .

1

-

-

... More
M & L for opening up short circuited electric induction motor of 5 HP capacity 3 phase AC 440 Volts, cutting and removing the short circuited stator winding coils complete and re-winding the same with super enamelled copper conductor wires of appropriate size as per the existing gauge including cleaning of slots, all necessary insulating materials, varnishing, drying and testing on load complete all as specified.

1

-

-

... More
M & L for opening up short circuited electric induction motor of 10 HP capacity 3 phase AC 440 Volts, cutting and removing the short circuited stator winding coils complete and re-winding the same with super enamelled copper conductor wires of appropriate size as per the existing gauge including cleaning of slots, all necessary insulating materials, varnishing, drying and testing on load complete all as specified.

1

-

-

... More
S & F cast iron foot valves with flanged end in replacement 100 mm bore all as per including necessary rubber gasket, MS nuts, bolts, washers etc of suitable size complete all as specified and directed. Make : BIR/Kirloskar/Venus/RAMCO

2

-

-

... More
S & F cast iron foot valves with flanged end in replacement 150 mm bore all as per including necessary rubber gasket, MS nuts, bolts, washers etc of suitable size complete all as specified and directed. BIR/Kirloskar/Venus/RAMCO

1

-

-

... More
S&F replacement of battery 12 v 180 Ah maintenance free make: Exide/Amron/Luminous

2

-

-

... More
S&F replacement of battery 12 v 150 Ah maintenance free make: Exide/Amron/Luminous

2

-

-

... More
S&F replacement of battery 12 v 88 Ah maintenance free make: Exide/Amron/Luminous

2

-

-

... More
S&F leather sheet gasket 3 mm thick

30

-

-

... More
S&F rubber sheet gasket 3 mm thick

40

-

-

... More
Gland packing superior quality 15/16/20 mm

40

-

-

... More
Bolts & nuts 24/20/15 mm dia

70

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.