Military Engineer Services Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Military Engineer Services - MES Tender
Electrical Works
Eprocure
Opening Date30 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 45,00,000
Costs
EMD
₹ 90,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repair/maintenance Of Pump Sets Motors Starter Panels And Allied Works For Water Supply Installation
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_677444_1Bid Award Id
ViewTender No
8671/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://defproc.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Air filter element
4
-
-
Fan belt
2
-
-
Inhibitor Corrosion
30
-
-
Disconnecting/unscrewing of coupling for RKB125/150 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
2
-
-
Coupling set suitable for RKB 125/150 HP pumping set
2
-
-
Replacement of CI impeller
8
-
-
Replacement of MN steel bush
8
-
-
Replacement of gland sleeve
4
-
-
Replacement of body neck ring gun metal
8
-
-
Replacement of pump shaft stainless steel
2
-
-
Key way of impeller disc
6
-
-
Balancing disc
2
-
-
Balancing ring
2
-
-
Diffuser O ring
6
-
-
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 25-26 BHP Capacity . Note:- (i) items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. (iii) Fuel and lubricants required for inspection and testing will be supplied by the Deptt.
8
-
-
Fuel filter element including 'O' ring complete
16
-
-
Lub oil filter element complete
8
-
-
Air filter element
8
-
-
Fan belt
4
-
-
Inhibitor Corrosion
30
-
-
Disconnecting/unscrewing of coupling for 25-26 BHP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
4
-
-
Coupling set suitable for 25-30 HP pumping set
4
-
-
Replacement of CI impeller
12
-
-
Replacement of MN steel bush
12
-
-
Replacement of gland sleeve
8
-
-
Replacement of body neck ring gun metal
12
-
-
Replacement of pump shaft stainless steel
4
-
-
Key way of impeller disc
12
-
-
Bearing DE/NDE
8
-
-
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 60 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in uoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.
2
-
-
Fuel filter element including 'O' ring complete
2
-
-
Lub oil filter element complete
2
-
-
Air filter element
2
-
-
Fan belt
2
-
-
Inhibitor Corrosion
10
-
-
Disconnecting/unscrewing of coupling for 60 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
1
-
-
Coupling set suitable for 60 HP pumping set
1
-
-
Replacement of CI impeller
1
-
-
Replacement of MN steel bush
1
-
-
Replacement of gland sleeve
1
-
-
Replacement of body neck ring gun metal
1
-
-
Replacement of pump shaft stainless steel
1
-
-
Key way of impeller disc
1
-
-
Bearing DE/NDE
2
-
-
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 40 HP Capacity . Note:- (i) items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. (iii) Fuel and lubricants required for inspection and testing will be supplied by the Deptt.
2
-
-
Fuel filter element including 'O' ring complete
2
-
-
Lub oil filter element complete
2
-
-
Air filter element
2
-
-
Fan belt
2
-
-
Inhibitor Corrosion
10
-
-
Disconnecting/unscrewing of coupling for 40 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
1
-
-
Coupling set suitable for 40 HP pumping set
1
-
-
Replacement of CI impeller
1
-
-
Replacement of MN steel bush
1
-
-
Replacement of gland sleeve
1
-
-
Replacement of body neck ring gun metal
1
-
-
Replacement of pump shaft stainless steel
1
-
-
Key way of impeller disc
1
-
-
Bearing DE/NDE
2
-
-
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 7.5 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in quoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.
2
-
-
Fuel filter element including 'O' ring complete
2
-
-
Lub oil filter element complete
2
-
-
Air filter element
2
-
-
Fan belt
2
-
-
Inhibitor Corrosion
8
-
-
Disconnecting/unscrewing of coupling for 7.5 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
1
-
-
Coupling set suitable for 7.5 HP pumping set
1
-
-
Replacement of CI impeller
1
-
-
Replacement of MN steel bush
1
-
-
Replacement of gland sleeve
1
-
-
Replacement of body neck ring gun metal
1
-
-
Replacement of pump shaft stainless steel
1
-
-
Key way of impeller disc
1
-
-
Bearing DE/NDE
2
-
-
M&L for complete serving by expert/auth service engineer once in quarter (three monthsor interval) including cleaning of engine with kerosene or by blower as per necessary, prevention of leakage of fuel/oil/water coolent, tightening of nut and bolts, retensioning of fan belt, descaling of radiator, cleaning with cleaning agent, cleaning of fins by applying pressurised air using blower, checking of all electrical connections and testing on full load of Diesel Engine Driven Pumping set of 20-25 HP Capacity . Note:- (i)Items like Nuts, bolts, washers, Banjo bolts required at site deemed to be included in uoted rate.(ii) Major spares required at site will be measured and paid separately. Fuel and lubricants required for inspection and testing will be supplied by the Deptt.
4
-
-
Fuel filter element including 'O' ring complete
4
-
-
Lub oil filter element complete
4
-
-
Air filter element
4
-
-
Fan belt
4
-
-
Inhibitor Corrosion
10
-
-
Disconnecting/unscrewing of coupling for 20-25 HP pump set and separating pump and motor/ Gen Set disconnecting all water connections from pump including suction and discharge pipe line and taking out the pump from base frame for carryout the necessary reapirs and installing on existing location after repair, making all the connections carefully, allignment of pump and motor completely, testing & commissioning at site to the entire satisfaction of the Engineer-in-Charge. Note:- All the spares/parts/job repairs required to be replaced shall br measured and paid separately
1
-
-
Coupling set suitable for 20-25 HP pumping set
1
-
-
Replacement of CI impeller
1
-
-
Replacement of MN steel bush
1
-
-
Replacement of gland sleeve
1
-
-
Replacement of body neck ring gun metal
1
-
-
Replacement of pump shaft stainless steel
1
-
-
Key way of impeller disc
1
-
-
Bearing DE/NDE
2
-
-
Takingout & replacement of old unserviceable ball bearing No 7311 BECBP complete all as specified and directed Make SKF/NBC
10
-
-
Takingout & replacement of old unserviceable roller bearing No NU411 complete all as specified and directed Make SKF/NBC
9
-
-
Takingout & replacement of old unserviceable roller bearing No NU319EMZ1C3 complete all as specified and directed Make SKF/NBC
2
-
-
Takingout & replacement of old unserviceable roller bearing No 6319C3 complete all as specified and directed Make SKF/NBC
8
-
-
S&F in repair to dynamo 12/24 Volt including replacement of wiring, bearing, bushing including replacement of copper coil of suitable size and testing on completion and fixing on existing position complete all as specified and directed by Engineer-in-Charge.
1
-
-
M&L for repairs to self starter 12 volts including replacement of armature, bushing, carbon bushes including testing on completion and fixing on existing position complete all as specified and directed by Engineer-in-Charge
1
-
-
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make with pump of head 230 mtr, discharge 140 mtr cube 1485 RPM of capcity 200 HP for repair / replacing of the following accessories
1
-
-
Main shaft made out of MN Steel
1
-
-
Impeller SS of suitablesize
1
-
-
Gland Cap
1
-
-
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 125 HP for repair / replacing of the following accessories
1
-
-
Main shaft made out of MN Steel
1
-
-
Impeller SS of suitablesize
1
-
-
Gland Cap
1
-
-
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 60 HP for repair / replacing of the following accessories
1
-
-
Main shaft made out of MN Steel
1
-
-
Impeller SS of suitablesize
1
-
-
Gland Cap
1
-
-
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 50/40 HP for repair / replacing of the following accessories
1
-
-
Main shaft made out of MN Steel
1
-
-
Impeller SS of suitablesize
1
-
-
Gland Cap
1
-
-
Dismantling of Centrifugal pump set mechanicall/electrically of following capacity squirrel cage induction motor 3 phase 415 Volt 1485/1500 RPM of any make of capcity 20/10 HP for repair / replacing of the following accessories
1
-
-
Main shaft made out of MN Steel
1
-
-
Impeller SS of suitablesize
1
-
-
Gland Cap
1
-
-
Dismantling of induction motor of capacity 200 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
1
-
-
Dismantling of induction motor of capacity 125 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
1
-
-
Dismantling of induction motor of capacity 60 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
1
-
-
Dismantling of induction motor of capacity 50/40 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
1
-
-
Dismantling of induction motor of capacity 10/15/20 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
1
-
-
Dismantling of induction motor of capacity 1.5 to 5 HP from site and transporting to workshop at Tezpur/Guwahati for rewinding with superenamelled copper wire with adeuate size copper conductor, replacement of DE/NDE bearing including necessary small items like varatex paper lux superior uality of varnish ferrules and refixing to the existing foundation duly coupled with centrifugal pump set
2
-
-
S&F in replacement of antivibration pad to base frame of Pumping set as per sample complete all as specified and directed by Engineer-in-Charge.
8
-
-
Overhauling and calibration of fuel pump of Diesel engine 127 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .
1
-
-
Repair and calibration of injector assembly of Diesel engine 127 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.
1
-
-
Overhauling and calibration of fuel pump of Diesel engine 20-26 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .
1
-
-
Repair and calibration of injector assembly of Diesel engine 20-26 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.
1
-
-
Repair and calibration of injector assembly of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.
1
-
-
Overhauling and calibration of fuel pump of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .
1
-
-
Repair and calibration of injector assembly of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of nozzle, spring, barrel plunger, injector cup complete and refitting to its original position duly changing the worn out nut, bolts/studs etc complete all as specified and directed .Note :- Replacement of unserviceable parts shall be paid separately as 'Supply only' under relevant item of schedule.
1
-
-
Overhauling and calibration of fuel pump of Diesel engine 40/60 BHP Make : Kirloskar by authorised service centre including replacement of injector nozzle including worn out parts i.e delivery valve, pump plunger, nozzle spring adjustment screws etc complete all as specified and directed .
1
-
-
M & L for opening up short circuited electric induction motor of 5 HP capacity 3 phase AC 440 Volts, cutting and removing the short circuited stator winding coils complete and re-winding the same with super enamelled copper conductor wires of appropriate size as per the existing gauge including cleaning of slots, all necessary insulating materials, varnishing, drying and testing on load complete all as specified.
1
-
-
M & L for opening up short circuited electric induction motor of 10 HP capacity 3 phase AC 440 Volts, cutting and removing the short circuited stator winding coils complete and re-winding the same with super enamelled copper conductor wires of appropriate size as per the existing gauge including cleaning of slots, all necessary insulating materials, varnishing, drying and testing on load complete all as specified.
1
-
-
S & F cast iron foot valves with flanged end in replacement 100 mm bore all as per including necessary rubber gasket, MS nuts, bolts, washers etc of suitable size complete all as specified and directed. Make : BIR/Kirloskar/Venus/RAMCO
2
-
-
S & F cast iron foot valves with flanged end in replacement 150 mm bore all as per including necessary rubber gasket, MS nuts, bolts, washers etc of suitable size complete all as specified and directed. BIR/Kirloskar/Venus/RAMCO
1
-
-
S&F replacement of battery 12 v 180 Ah maintenance free make: Exide/Amron/Luminous
2
-
-
S&F replacement of battery 12 v 150 Ah maintenance free make: Exide/Amron/Luminous
2
-
-
S&F replacement of battery 12 v 88 Ah maintenance free make: Exide/Amron/Luminous
2
-
-
S&F leather sheet gasket 3 mm thick
30
-
-
S&F rubber sheet gasket 3 mm thick
40
-
-
Gland packing superior quality 15/16/20 mm
40
-
-
Bolts & nuts 24/20/15 mm dia
70
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements