Visakhapatnam Port Trust Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Visakhapatnam Port Trust - VPT Tender

Works
Civil And Construction
Bridge Construction
Pipe Line Project
Eprocure
Opening Date12 May 2023
Closing Date5 Jun 2023
Tender Amount₹ 34,54,400 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Linking of BG track with 60kg/52kg rails on new pre-stressed concrete sleepers with M+7 density with grooved rubber pads, MS liners and elastic rails clips including spreading of concrete sleepers, pairing and seating rails, bolting joints for unwelded joints and fixing with liners and elastic rails clips to the guage, slewing to the alignment, levelling etc., as required and as directed by Engineer-in-charge(Labour charges only)

0.75

301527

402036.2

... More
c) Third packing

1.09

119641

109863.5

... More
Transportation of pre-stressed concrete sleepers of B.G. track size 2750 x 154 / 270 x 235 mm up to a lead of 5km to anywhere in port area by lorry or other means including carriage and handling, loading, unloading by mechanical means (i.e. by crane) and stacking at nominated place as directed by the Engineer-in-Charge complete including tools, plant and labour charges.

576.45

208934

362.45

... More
Supply of welding portions passed by R.D.S.O including supply of Pre-fabricated moulds and other associated accessories like vent pipe etc., as required and as directed by the Engineer-in-charge, complete by road from firm's works to the port railway yards nearest to the site of work including insurance, loading but excluding unloading and stacking at destination for use in A.T welding.

78

201057

2577.65

... More
Painting priming coat with approved red-oxide zinc chromate primer on 60 Kg/ 52 kg / 90 R rails including cleaning the surface and scraping the surface wherever required etc.,as required and as directed by the Engineer-in-charge, complete. All labour and materials.

1020

74659

731.95

... More
Drilling holes upto 32 mm dia. to B.G. Rails web 90 R/52 kg of B.G. track, at p-way stores / stack yard as directed by the Engineer-in- Charge including handling of rails in full length (upto 13 m) within a lead of 30 m and lift as required for drilling holes by means of drilling machine, stacking the drilled rails within 30 m as required and as directed by the Engineer-incharage, complete including tools, plant.

300

33780

112.6

... More
Supplying and stacking of machine crushed granite metal ballast or 50 mm size at site of work along permanent way tracks as directed by the Engineer-in-Charge, complete with all leads and lifts. All labour and materials.

1036.8

1487445

1434.65

... More
Spreading ballast of granite metal along and across the p-way tracks within a lead of 50 m and lift of 2 m and as directed by the Engineer-in-Charge. Under traffic working conditions including tools etc., complete. Labour charges only.

1036.8

197148

190.15

... More
Conversion of single rails/SWR to 3 rails panels or longer panels on cess/insitu by alumino Thermit S.K.V Process Welding including supply of skilled / Artisan staff like welder, moulder, chipper, lutter, aligner, striker / hammer man and adequate Nos. of semi-skilled labour and supplying petrol @ 1.6 litres / joint for facilitating welding works on track by shifting the joint sleepers up to 30 cm. on either side, providing suitable gap of about 23 mm to 25 mm by pulling back of rail including removing keys, spikes and other fastenings as required and re-fixing the same after welding, cleaning the rail ends, fixing the petrol tank & heating the rail ends by railway / approved contractors equipment and chipping excess materials if required, bringing the shifted joint sleepers to the specific spacing and packing them to the required specification as directed including adjustment of required for welding, aligning, levelling etc., complete including contractor's own files for filing after welding in running track. But excluding supply of welding portions.

78

189158

2425.1

... More
Packing B.G railway track of pre-stressed concrete sleepers with metal ballast / gravel / crusher dust including lifting the track in stages so as to keep a ballast cushion of 25cm deep underneath the sleepers and packing the sleepers below the rail seat, slewing to the alignment 2nd packing throughout the length of the sleepers, slewing to the final alignment, to the required cant, gauge, level, picking up slacks, boxing and dressing complete as directed by the Engineer-in-Charge under traffic conditions including plant, tools and labour charges only.

-

-

-

... More
a) First packing

1.09

141006

129482

... More
Painting one coat to 60 Kg/ 52 Kg / 90 R rails with anti corrosive paint of approved colour shade including cleaning the surface and scraping the surface wherever required etc. All labour and materials.

1020

79198

776.45

... More
b) Second packing

1.09

119641

109863.5

... More
Removal of consolidated Coal cargo by mechanical means including disposal of excavated coal cargo materials up to a lead of 4 KM and disposed of the materials as required and as directed by the Engineer-in-charge complete. All labour and materials.

1219.68

151118

123.9

... More
Check railing to one side to the rails of the B.G. Track with 90 R / 52 kg rails, wooden / PSC layout, positioning of checkrails inside, jointing, check bolting with check blocks, washers, spiking, cutting of rails, maintaining level, alignment etc., as required complete including drilling holes for fish joints to the rails, all leads and lifts as directed by the Engineer-in-Charge under traffic working conditions including tools and plant. Labour charges only.

0.15

10842

72283.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.