Visakhapatnam Port Trust Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Port Trust - VPT Tender
Civil And Construction
Eprocure
Opening Date16 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 44,01,959
Costs
EMD
₹ 88,050Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Up Gradation Of R14 Railway Track From 52kg Track Structure To 60kg Track Structure
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_VPT_223887_1Tender No
IENG/CP/SE(Rlys)/T/80,Dt. 16.01.2025Tender Authority
Visakhapatnam Port Trust ViewPurchaser Address
-Website
http://https://vizagport.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Removing C.C. Blocks in pavements carefully without damaging the blocks and reuse the same wherever necessary including removing the mortar joints around block and stacking them within a lead of 50 m. as required and as directed by the Engineer-in-charge complete.
15.6
1185
18491
... More
Dismantling RCC/PCC to the required lines and levels by using mechanical equipment of jack hammer including necessary compressor equipment, cutting bits, fuel, operator charges, tools etc., or any other equipment machinery and removing the debris with a lead of 50 m including cutting the reinforcement bars and stacking the useful materials, handing over the bars to stores etc., as required and as directed by the Engineer-in-charge complete.
80
862
69000
... More
Linking of B.G.track with 60kg/52Kg/90R rails on new Prestressed concrete sleepers with M+7 density with grooved rubber pads, M.S.liners and elastic rail clips including spreading of concrete sleepers, pairing and seating rails, bolting joints for unwelded joints and fixing with liners and elastic rail clips to the gauge, slewing to the alignment, levelling etc., including all leads and lifts, tools and plant etc., as required and as directed by the Engineer-in-Charge, complete (labour charges only)
0.72
419601
302113
... More
Linking of Points and crossings B.G. Track 1 in 8½ with 52Kg / 90 R rails on PSC layout with optional bearing plates,gauge, cant etc., complete at site as per the IRS drawing including spreading special size sleepers to the correct spacing, seating, switches, crossings and joining rails with bolts and nuts spiking, check railing opposite to wing rails, fixing point lever box with locking arrangements cutting and drilling holes to rails wherever necessary slewing to the alignment, nominal level, packing with ballast, joining the approaches etc., including all leads and lifts etc., as required and as directed by the Engineer-in-Charge, complete including tools, plant and labour charges only.
2
88417
176835
... More
Supplying and stacking of machine crushed granite metal ballast of 50 mm size at site of work along permanent way tracks as required and as directed by the Engineer-in-Charge, complete with all leads and lifts. All labour and materials.
1232
1434
1767489
... More
Spreading ballast of granite metal along and across the p-way tracks within a lead of 50 m and lift of 2 m. Under traffic working conditions including tools etc., as required and as directed by the Engineer-in-Charge complete. Labour charges only.
1232
190
234265
... More
Drilling holes upto 32 mm dia. to B.G. Rails web 90R/52/60 kg of B.G. track, at p-way stores / stack yard as directed by the Engineer-in- Charge including handling of rails in full length (upto 13 m) within a lead of 30 m and lift as required for drilling holes by means of drilling machine, stacking the drilled rails within 30 m as required complete including tools, plant.
904
112
101790
... More
Gas cutting rail flanges of 60 / 52 kg at p-way yard / stack yard including supply of necessary gas, handling, cutting, tools and plant etc.,as directed by the Engineer-in-Charge complete. All labour and materials.
417.6
121
50759
... More
Check railing one side to the rails of the B.G. Track with 90 R / 52 kg/60 rails, wooden / PSC layout, positioning of check rails inside, jointing, check bolting with check blocks, washers, spiking, cutting of rails, maintaining level, alignment etc., as required complete including drilling holes for fish joints to the rails, all leads and lifts as directed by the Engineer-in-Charge under traffic working conditions including tools and plant. Labour charges only.
0.45
72283
32672
... More
Packing B.G railway track of pre-stressed concrete sleepers with metal ballast / gravel / crushed dust including lifting the track in stages so as to keep a ballast cushion of 25cm deep underneath the sleepers and packing the sleepers below the rail seat, slewing to the alignment 2nd packing throughout the length of the sleepers, slewing to the final alignment, to the required cant, gauge, level, picking up slacks, boxing and dressing etc., as required and as directed by the Engineer-in-Charge complete under traffic conditions including plant, tools and labour charges only.
-
-
-
... More
a) First Packing.
0.92
129482
119123
... More
b) Second Packing
0.92
109863
101074
... More
c) Third Packing
0.92
109863
101074
... More
Supply of welding portions passed by R.D.S.O including supply of Pre-fabricated moulds and other associated accessories like vent pipe etc., complete by road from firm's works to the port railway yards nearest to the site of work including insurance, loading etc., as directed by the Engineer-in-Charge, complete. All labour and materials,but excluding unloading and stacking at destination for use in A.T welding
98
2577
252610
... More
Conversion of single rails/SWR to 3 rails panels or longer panels on cess/insitu by alumino Thermit S.K.V Process Welding including supply of skilled / Artisan staff like welder, moulder, chipper, lutter, aligner, striker / hammer man and adequate Nos. of semi-skilled labour and supplying petrol @ 1.6 litres / joint for facilitating welding works on track by shifting the joint sleepers up to 30 cm. on either side, providing suitable gap of about 23 mm to 25 mm by pulling back of rail including removing keys, spikes and other fastenings as required and re-fixing the same after welding, cleaning the rail ends, fixing the petrol tank & heating the rail ends by railway / approved contractors equipment and chipping excess materials if required, bringing the shifted joint sleepers to the specific spacing and packing them to the required specification as directed including adjustment of required for welding, aligning, levelling etc., complete including contractor's own files for filing after welding in running track etc., as directed by the Engineer-in-Charge, complete. All labour and materials,. But excluding supply of welding portions.
98
2425
237660
... More
Plain cement concrete M 20 mix using 20mm graded granite metal of approved quality as coarse aggregate and river sand as fine aggregate including mixing, depositing in position, tamping or vibrating, finishing, curing etc., as required & as directed by the engineer in charge complete. All labour and materials.
51.24
5557
284779
... More
Transportation of rails up to a distance of 5 km lead, points and crossings and P. Way fittings of 52 kg / 90 of varying lengths not exceeding 13 m (42'-8") to anywhere in port area by lorry/ or other means including carriage and handling, loading and unloading by mechanical means (i.e. by crane) and stacking within 30 m lead at nominated area as directed by the Engineer-in-Charge complete including tools, plant and labour charges.
211.28
391
82748
... More
Transportation of pre-stressed concrete sleepers upto distance of 5 km lead of B.G. track size 2750 x 154 / 270 x 235 mm to anywhere in port area by lorry or other means including carriage and handling, loading, unloading by mechanical means (i.e. by crane) and stacking at nominated place as directed by the Engineer-in-Charge complete including tools, plant and labour charges.
553.5
362
200616
... More
Transportation of Special size Pre-stressed concrete sleepers upto distance of 5 km lead for points and crossings and approach to any where in port area by lorry / by means of mechanical means (i.e., by crane) or other means including loading, unloading and stacking at nominated place as directed by the Engineer-in-charge complete including tools plant and labour charges.
5
6886
34433
... More
Transportion of debris / excavated earth to a lead of 5 km including stacking, loading, unloading and levelling the unloaded materials at a place of unloading as required and as directed by the Engineer-in-charge complete.
415.97
92
38419
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%