Visakhapatnam Port Trust Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Port Trust - VPT Tender
Eprocure
Opening Date22 Jan 2021
Closing Date8 Feb 2021
Tender AmountRefer Documents
Costs
EMD
₹ 7,000Document Cost
₹ 472Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_VPT_68009_1Bid Award Id
ViewTender No
IENG/CP/EE(West)/T/89, dt.21.01.2021Tender Authority
Visakhapatnam Port Trust ViewPurchaser Address
-Website
http://https://vizagport.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Scraping the old walls and removing the existing white wash or colour wash or distemper etc., and exposing the existing plastering surface and cleaning the surface etc., as required and as directed by the Engineer-in-charge, complete.
543
-
6.07
... More
Providing two coats of white cement based putty Birla or JK or equivalent quality of approved make to walls, ceiling surfaces etc., with putty blade or trowel including cleaning the surface, scraping the surface with fine water proof emery paper after consecutive coats make the surface ready for painting etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
292.5
-
112.3
... More
Painting priming coat to walls and ceiling surface with approved liquid cement primer including cleaning the surface, scraping the surface and washing with soap water as required etc., complete. All labour and materials.
543
-
872.55
... More
Painting two coat to walls, ceiling surfaces, with approved plastic Emulsion paint including cleaning the surface etc., as required complete. All labour and materials.
292.5
-
999.1
... More
Providing painting two coats with weather coat smooth exterior paint or equivalent of approved quality, colour, and shade etc., on plastered/concrete surface including cleaning the surface, watering etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
250.4
-
100.95
... More
Supplying and fixing ornamental MS. grills of approved pattern using MS. square or round bars and MS. flats etc., of approved size to doors, windows, jafferies, balconies, gates etc., , as required and as directed by the Engineer-in-charge complete. All labour and materials.
297.2
-
106.4
... More
Supplying and fixing GI fly prrof mesh to doors, windows, cupboards etc., including fixing complete. All labour and materials but excluding frame work.
2.4
-
220.1
... More
Painting with synthetic enamel paint of approved colour and shade except white enamel paint including cleaning the surface and scraping the surface wherever required etc., as required andas directed by the Engineer-in-Charge, complete. All labour and materials.
-
-
-
... More
Two coats to old wood work
90.8
-
1143.1
... More
Two coats to new iron work
21.6
-
1033.25
... More
Plastering with CM 1:3, 20mm thick including raking out joints, cleaning the surface, curing etc., including mixing water proofing compound pudlo or impermo 2% by weight of cement etc. as required and as directed by the Engineer-in-charge, complete. All labour and materials
20
-
381.25
... More
Scaffolding for around the building on East and sourth side including all labour and materials as directed by the Engineer in charge, complete.
200
-
156.45
... More
Supplying and fixing polyethylene water storage tank of 1000 Ltrs. capacity conforming to I.S. 12701, rotational moulded cylindrical vertical type including top cover with locking provision, necessary G.I. fittings for inlet, outlet, overflows and washout including lifting, hoisting in position, fixingetc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
1
-
7057.9
... More
Supplying and laying PVC (Rigid PVC) soil waste and rain water pipes IS 13592-1992 type-B(6kg/cm2) and fittings or specials including cutting the pipes, chamfer the pipe ends, cost of colvent cement/lubricant,joining, fixing,pipe clips, leak proof testing etc., including cutting masonry/concrete as required at floors and walls etc., and making good the same as per original etc., as directed by the Engineer-in-charge, complete. All labour and materials but excluding cost of specials.
24
-
607.82
... More
Supplying, 10mm, dia plain bend 45 unplasticised PVC (Rigid P.V.C) soil waste and rain water, fittings and accessories including cost of rubber rings for jointing purpose including transportation loading unloading and stacking etc., as directed by the Engineer-in-charge, complete. All labour and materials.
8
-
43.53
... More
Plain cement concrete 1:3:6 nominal mix (using 220 Kg of cement per M3 of finishied concrete) using 20mm graded granite metal of approved quality as coarse aggregate and river sand as fine aggregate including mixing, depositing in position, vibrating or tamping, finishing, curing etc., including form work (boxing) in bed blocks, plinth courses and similar types of works etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
1.1
-
6882.4
... More
Plastering to concrete surface with CM 1:3 (1 cement: 3 sand) of thickness not exceeding 6mm using 25.5 kg of cement and 0.05 m3 of sand per 10 m2 smooth and even finishing, cleaning the surface, hacking and roughening the concrete surface, curing etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
15.9
-
115.25
... More
White washing two coats to walls, ceiling etc., including scraping, projections on walls, cleaning the surface etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
15.9
-
2476.85
... More
Rendering smooth the surface using 1kg of cement per m2 of area including thread lining, curing etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
96
-
59.3
... More
Supply of labour including all tools and plants etc., as required and as directed by the Engineer-in-charge, complete.
-
-
-
... More
1st class carpenter.
2
-
539
... More
2nd class carpenter.
2
-
492.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements