Visakhapatnam Port Trust Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Port Trust - VPT Tender
Civil And Construction
Eprocure
Opening Date6 Jan 2025
Closing Soon28 Jan 2025
Tender Amount₹ 70,11,716
Costs
EMD
₹ 1,78,700Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Development Of Land Scape Works From Convent To Pcr Circle Above Fly Over In Vpa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_VPT_223044_1Tender No
IENG/CP/SE(West)/T/78 Dt. 06.01.2025Tender Authority
Visakhapatnam Port Trust ViewPurchaser Address
-Website
http://https://vizagport.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work at site and all operational, incidental, labour charges, scaffolding charges, as required and as directed by the engineer-in- charge complete for finished item of work in all floors for external walls. All labour and materials.
1675
500
839024
... More
Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint (having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., as mentioned and as directed by the Engineer-in-charge complete.
1675
325
544492
... More
Supply and laying of 8 SWG GI wire (0.104Kgs/1Mtr) in horizontal /Vertical run in Ground/surface/Recess including, saddles/making connection etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials.
2625
10
26250
... More
Supply of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off the rates inclusive of cost of plants complete for finished item of work, as required and as directed by Engineer-in-charge, complete.
-
-
-
... More
Pandanus gold(7"x8")
1062
45
47790
... More
Lantana orange red(7"x8")
1062
45
47790
... More
Lantana sellowiana(7"x8")
1062
45
47790
... More
Lantana camara(7"x8")
783
45
35235
... More
Rhoeo(7"x8")
1065
45
47925
... More
Vinca rosea(7"x8")
540
45
24300
... More
Plumbago auriculata(7"x8")
279
50
13950
... More
Portulaca(7"x8")
279
50
13950
... More
Pelargonium graveolens(7"x8")
783
50
39150
... More
Wedelia(7"x8")
786
45
35370
... More
Alternanthera Dentata (purple) (7"x8")
99
45
4455
... More
Ipomea neon (climber) (7"x8")
525
50
26250
... More
Ipomea purple (climber) (7"x8")
525
50
26250
... More
Loading and unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc., as required and as directed by Engineer-in-charge, complete for finished item of work. (excluding cost of plant bag)
8850
65
5822
... More
Transportation of bag plants from Kadiyam to PCR circle and convent junction in Port area as required and as directed by the Engineer-in-charge, complete.
17.7
1000
17700
... More
Preparation of soil Mixture for plants grown in containers/Pots, soil Mixture is allowing better growth and good moisture retention, thereby preventing diseases and weeds. soil mixed with other ingredients in a particular proportion as required 3:2:1:1 ratio red garden soil, farmyard manure, cocopeat and river sand, and including cost and conveyance of red garden soil, farmyard manure, cocopeat and river sand to work site and it including Homogeneous mixing, internal transportation soil mixture, all operational, incidental, labour charges, required tools, complete for finished item of work as required and directed by Engineer-in-charge. (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
73.92
2793
206478
... More
Internal transportation of small shrub plants from plants stacking place to planting in a pit, it including all operational, incidental ,labour charges etc., as required and as directed by the Engineer-in-charge complete for finished item of work.
8850
-
8585
... More
Removing polythene bag , planting by keeping the ball of earth intact, fixing the plant by refilling with dug out of soil /supplied soil FYM mixer and ramming around the plant , it including all operational, incidental ,labour charges, required tools etc., as required and as directed by the Engineer-in-charge complete for finished item of work. (for small shrub plants).
8850
2
20001
... More
Complete maintenance of the CC/PVC pots features having as per yard stick in the pots i.e., trees, shrubs, hedge, flower beds, foliages, creepers etc. including watering, weeding pruning, replacement of plants, gap filling, hoeing, removal of waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other pots related works ( excluding cost of water, Manure, Fertilizer, Insecticide, Pesticide) etc., as required and as directed by the Engineer- in- charge complete. All labour and materials.
70728
3
220671
... More
Supplying and transportation of portable water in lorry/tankers having capacity 20KL including erection of suitable mechanical equipment (motor pumps) at backside of the tanker including necessary sprinkling arrangements with control valves filling and delivery of water at site of work crew changes, fuel charges, waiting charges, hire charges, hose pipes, taxes if any and with all equipment and erection charges etc, as required and as directed by the Engineer-in-charge complete. All hire and operational charges (water will be supplied by VPA)
3536.4
122
431971
... More
Supply of fertilizers/pesticides at the site of work as required and as directed by horticulture division/ Engineer-in-charge, complete. including cost of all materials and labour charges
-
-
-
... More
urea
404.06
225
2024
... More
Potash
80.81
720
2328
... More
Chlorpyrifos spray
235.76
355
83914
... More
Replacement of casualities including plant and plantation cost during first year
0.05
668791
33440
... More
Replacement of casualities including plant and plantation cost during second year
0.03
668791
20064
... More
Replacement of casualities including pots & paint cost (i.e., replacement of broken pots coloring of pots and change of location of pots) during First Year
-
-
-
... More
CC pots
140.05
1341
187927
... More
PVC pots
7.3
765
5586
... More
Replacement of casualities including pots & paint cost (i.e., replacement of broken pots coloring of pots and change of location of pots) during Second Year
-
-
-
... More
CC pots
84.03
1341
112756
... More
CC pots
4.38
765
3352
... More
Cess @ 1%
1
69423
69423
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%