Visakhapatnam Port Trust Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Visakhapatnam Port Trust - VPT Tender

Works
Machinery and Tools
Eprocure
Opening Date11 Oct 2023
Closing Date1 Nov 2023
Tender Amount₹ 35,61,285 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling existing PSC B.G. Track laid with 52 Kg / 90 R rails including removing all rails, PSC sleepers, fittings, fastening etc., including stacking the released rails, sleepers and fittings etc., within a lead of 30 m at nominated place or yard, lift etc. complete as required and as directed by the Engineer-in-Charge under traffic working conditions including tools, plant and labour charges only.

0.72

50779

70526.05

... More
Linking of B.G.track with 60kg/52Kg/90R rails on new Prestressed concrete sleepers with M+7 density with grooved rubber pads, M.S.liners and elastic rail clips including spreading of concrete sleepers, pairing and seating rails, bolting joints and fixing with liners and elastic rail clips to the gauge, slewing to the alignment, leveling etc., including all leads and lifts, tools and plant etc., as directed by the Engineer-in-Charge (labour charges only).

0.72

289466

402036.2

... More
Gas cutting rail flanges of 90 R / 52 kg at p-way yard / stack yard as directed by the Engineer-in-Charge including supply of necessary gas, handling, cutting, tools and plant etc., complete. All labour and materials.

180.18

21901

121.55

... More
Drilling holes upto 32 mm dia. to B.G. Rails web 90 R/52 kg of B.G. track, at P-way stores / stack yard including handling of rails in full length (upto 13 m) within a lead of 30 m and lift as required for drilling holes by means of drilling machine, stacking the drilled rails within 30 m as required complete including tools, plant etc.,as directed by the Engineer-in-Charge, Complete. All labour and Hire charges of Machinery.

300

33780

112.6

... More
Check railing to one side to the rails of the B.G. Track with 90 R / 52 kg rails , wooden / PSC layout, positioning of check rails inside, jointing, check bolting with check blocks, washers, spiking, cutting of rails, maintaining level, alignment etc., as required complete including drilling holes for fish joints to the rails, all leads and lifts as directed by the Engineer-in-Charge under traffic working conditions including tools and plant. Labour charges only.

0.15

10842

72283.2

... More
Packing B.G railway track of Pre-stressed concrete sleepers with metal ballast / gravel / crusher dust including lifting the track in stages so as to keep a ballast cushion of 25cm deep underneath the sleepers and packing the sleepers below the rail seat, slewing to the alignment 2nd packing throughout the length of the sleepers, slewing to the final alignment, to the required cant, gauge, level, picking up slacks, boxing and dressing complete as directed by the Engineer-in-Charge under traffic conditions including plant, tools and labour charges only

-

-

-

... More
a) First Packing

0.96

124173

129482

... More
b) Second Packing

0.96

105359

109863.5

... More
c) Third Packing

0.96

105359

109863.5

... More
Supplying and stacking of machine crushed granite metal ballast of 50 mm size at site of work along permanent way tracks as directed by the Engineer-in-Charge, complete with all leads and lifts. All labour and materials.

1231.5

1766771

1434.65

... More
Spreading ballast of granite metal along and across theP-way tracks within a lead of 50 m and lift of 2 m and as directed by the Engineer-in-Charge. Under traffic working conditions including tools etc., complete. Labour charges only.

1231.5

234170

190.15

... More
Supply of welding portions passed by R.D.S.O including supply of Pre-fabricated moulds and other associated accessories like vent pipe etc., complete by road from firm's works to the port railway yards nearest to the site of work including insurance, loading etc., as directed by the Engineer-in-charge complete. But excluding unloading and stacking at destination for use in A.T welding.

74

190746

2577.65

... More
Conversion of single rails/SWR to 3 rails panels or longer panels on cess/insitu by alumino Thermit S.K.V Process Welding including supply of skilled / Artisan staff like welder, moulder, chipper, lutter, aligner, striker / hammer man and adequate Nos. of semi-skilled labour and supplying petrol @ 1.6 litres / joint for facilitating welding works on track by shifting the joint sleepers up to 30 cm. on either side, providing suitable gap of about 23 mm to 25 mm by pulling back of rail including removing keys, spikes and other fastenings as required and re-fixing the same after welding, cleaning the rail ends, fixing the petrol tank & heating the rail ends by railway / approved contractors equipment and chipping excess materials if required, bringing the shifted joint sleepers to the specific spacing and packing them to the required specification as directed including adjustment of required for welding, aligning, levelling etc., complete including contractor's own files for filing after welding in running track etc., as directed by the Engineer-in-charge complete. But excluding supply of welding portions

74

179457

2425.1

... More
Transportation of debris/excess earth to a lead of 4km including loading, unloading, stacking and levelling at the unloaded place etc., as directed by the Engineer-in-charge complete. All labour and materials.

597.3

47999

80.36



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.