Visakhapatnam Port Trust Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Visakhapatnam Port Trust - VPT Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Dec 2023
Closing Date4 Jan 2024
Tender Amount₹ 90,41,229 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing tack coat with bitumen on normal bituminous surfaces @ 2.50 kg/10m2 emulsion RS grade as per IRC specification including scrapping the old surface, cleaning, spraying emulsion etc., as required and as directed by engineer-in-charge complete. All labour and materials but excluding cost of emulsion

17203

224499

13.05

... More
Supply of bituminous emulsion RS grade min. 65% bitumen content bulk at site of work including loading,unloading etc., as required and as directed by the engineer-in-charge complete. All labour and materials.

4.3

154133

35836.45

... More
Providing bituminous macadam grading 2 using 3.40% bitumen 60/70 hot-mix hot-laid base or binder coarse as per clause 504 of M/o RT & H's specifications for road and bridge works, including heating and mixing of coarse aggregate, fine aggregate and binder in hot-mix plant, transporting the premix to site of work by tipper lorry and laying with paver-finisher, rolling etc., as required and as directed by engineer-in-charge complete. All labour and materials.

35.63

251295

7052.9

... More
Providing bituminous concrete (asphalt concrete) grading 1 or 2 using 5% bitumen 60/70 and 3% rock dust filler hot-mix hot-laid wearing coarse as per 509 of M/o RT & H's specifications for road and bridge works, including heating and mixing of coarse aggregate, fine aggregate, filler and binder in hot-mix plant, transporting the premix to site of work by tipper truck and laying with paver-finisher, rolling etc., as required and as directed by the Engineer-in-charge complete. All labour and materials

669.12

7015355

10484.45

... More
SIGNAGE SYSTEM : Supplying and fixing road signage fixture(as per IRC standards and specifications ) on finished black top surface and road kerbs including sign boards etc as required and as directed by Engineer-in-charge, complete. All labour and materials.

-

-

-

... More
a) Thermoplastic road markings as per sec 803 of MoRTH & H speed brakers & road markers etc., as required and as directed by engineer-in-charge all hire and operational charges of the equipment. All labour and materials.

935.25

601684

643.34

... More
b) solar studs

84

152449

1814.87

... More
c) Road studs

597

251749

421.69

... More
Supply of labour including tools and plants etc for man mazdoors and women mazdoors etc as required and as directed by Engineer- in -charge, complete. All labour and materials.

200

125600

628



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.