Visakhapatnam Port Trust Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Port Trust - VPT Tender
Civil And Construction
Eprocure
Opening Date17 Apr 2021
Closing Date3 May 2021
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 472Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_VPT_75996_1Bid Award Id
ViewTender No
IENG/CP/EE(North) /T/ 09, Dt. 16 -04-2021Tender Authority
Visakhapatnam Port Trust ViewPurchaser Address
-Website
http://https://vizagport.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Extra charges for lifting of materials i.e concrete to various floors including all leads, lifts and labour etc., as directed by the engineer-in-charge, complete.
-
-
-
... More
Up to 6 m height
13.65
-
159.5
... More
Up to 12 m height
5.43
-
735.15
... More
Supply and laying of APP water proofing membrane STP super thermology or equivalent APP (Atactic polypropylene) modified reinforced bituminous water proofing membrane of 3 mm thick over the terrace and parapets with an overlapping of 100 mm, application of priming coat after cleaning the surface with wire brushes, providing and application of one coat of cold applied bitumen primer shalitex, primer over the terrace or parapet surface at the rate of 300 grams per square metre including cost of primer, APP water proofing membrane etc., as directed by the Engineer-in-charge, complete. All labour and materials.
805.1
-
636.77
... More
Supply of Motor Truck for the transportation of all sorts of materials such as sand, gravel, metal, steel, cement, boulders, debris, furniture, water supply pumps and motors including fuel charges, driver charges etc., as directed by the Engineer-in-Charge, complete. (Payment will be made for number of hours worked at site only)
9
-
258.5
... More
Supplying unplasticized P.V.C. (Rigid P.V.C.) Single Tee of 110 mm dia conforming to relevant latest IS including cost of rubber rings for jointing purposes at site of work including transportation, loading, unloading and stacking etc., as directed by the Engineer - in - Charge, complete. All labour and materials.
6
-
67.99
... More
Supplying unplasticized P.V.C. (Rigid P.V.C.) , Soil, waste and rain water pipes of 110 mm dia conforming to IS 13592: 1992 Type B (6 kg/cm2) including cost of rubber rings for jointing purposes and Laying 110 mm dia P.V.C. soil, waste and rain water pipe and fittings or specials including cutting the pipes, chamfer the pipe ends, cost of solvent cement / lubricant, jointing, fixing pipe clips, leak proof testing, etc. including cutting masonry / concrete as required at floors and walls etc. and making good the same as per original etc., as directed by the Engineer-in-Charge, complete. All labour and materials.
6
-
607.82
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements