Visakhapatnam Metropolitan Region Development Authority Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Visakhapatnam Metropolitan Region Development Authority Tender

Civil And Construction
Road Construction
Opening Date20 Jul 2022
Closing Date4 Aug 2022
Tender Amount₹ 5,71,16,157 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹53,500/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size (SS5) hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,all taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge - For Drains and Culverts

1463

-

6070542.94

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) with graded hard granite stone aggregate of size 20mm and 12mm SS-5 including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,all taxes on all materials, all operational, incidential, labour charges including Centering, shuttering, scaffolding with props etc. as per the approved shuttering plan , mixing concrete, laying, lift charges, tamping, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge For Drains Bed

1438

-

6850948.36

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Vibrated Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) with graded hard granite stone aggregate of size 20mm and 12mm SS-5 including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges,all taxes on all materials, all operational, incidential, labour charges including Centering, shuttering, scaffolding with props etc. as per the approved shuttering plan , mixing concrete, laying, lift charges, tamping, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge For 40' road

2597.6

-

15191336.27

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Plastering in Cm (1:5) 12mm thick using best sand including cost, and conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers.

4490

-

1400116.7

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Plastering in Cm (1:5) 12mm thick using best sand including cost, and conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers.

7632

-

2349511.2

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M 20 Design Mix Concrete using 20mm graded HBG metal including charges for all operations Bed blocks: a) 600mm Culverts, b) 750mm Culverts, c) 900mm Culverts

139.08

-

1075929.83

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M30 Design Mix Concrete using 20mm graded HBG metal including charges for all operations Culvert Slabs: a) 600mm Culverts, b) 750mm Culverts

221.43

-

2055237.97

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M30 Design Mix Concrete using 20mm graded HBG metal including charges for all operations Culvert Slabs: c) 900mm Culverts

71.37

-

604146.34

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Fabrication and placing of Tor steel/Fe-500 grade steel reinforcement confirming to IS-226 and 1786-1985 of SAIL/ VSP/ TISCON or any approved TMT of different diameters including straightening, cutting & bending to required sizes & shapes, placing in position with cover blocks of approved material & size, including lift charges for all floors, tieing firmly with MS binding wire of 18 guage, forming grills for reinforcement work as per approved design & drawings (to be supplied at the time of executing the work) including cost, all taxes and conveyance of steel and all materials to site including all wastages such as overlaps, couplings, welded joints, chairs, space bars, binding wire, cover blocks and all operational, incidential, labour charges etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge. (APSS No.126)

40015.2

-

3048758.09

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Manufacturing , Supply and delivery of MS Grill of approved size including cost conveyance of all materials and all labourcharges such as cutting, welding and fixing the grill in position with approved specification and size and charges for all operations and complete as per SS and as directed by the Engineer incharge Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light weight) 30 Kgs

90

-

239220

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Refilling the foundations and basements with available excavated earth complying with standard specifications for filling foundations and basements including watering and pulverizing with crow bars to saturation conditions, tampering etc., including cost, transportation and labour charges for all operations but excluding conveyance charges of imported soil complete for finished item of work as per SS and as directed by the Department Officers.

800

-

32752

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Compound wall for Park (Open Spaces) Earth work excavation for foundations (Manual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

550

-

117716.5

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Fal-G Block Masonary in CM (1:5) mix using Flay ash bricksof size 290mmx225mm x140mm having compressive strength 50/Kg /SCM including cost convyeance to site of all material and labour charges for all operations etc., complete as per SS and as directed by the departmental officers

530

-

3149005.6

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Providing boarders with CM (1:4) mix 20mm thick wide alround the brick wall including cost conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers

910

-

301765.1

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Providing exeternal emulsion paint two coats over a base coat of white cement (total 3 coats) incljuding cost and conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers

4490

-

767790

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M20 Grade design mix using 20mm and 12mm size graded HBG Metal (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) a) Columns footing for gate pillars below GL

2.55

-

23516.05

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M20 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) b) Columns for gate pillars above GL

2.2

-

24404.95

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M20 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) - c) Plinth Beam (4.4+.38+.38)

2.15

-

24752.05

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;VRCC M20 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) d)Slab 100mm thick top and bottom of Grill

74.1

-

806951.22

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Supply and fixing of Iron Gate of size 2.20 x 2.45m using main support 100x50x6mm M.S.Rectangular frame L-Shape and Curved supports of 25x25mm squre solid rod in side and Horizontal & Vertical 15x15mm solid rods and fixing to top arrows and ornemental circles at 10x6mm flat fixing to top one row and bottam two rows includin cost , all taxes, conveyance of all materials to site and all labour charges for fixing including cost of hinges, aldrops, towerbolts, welding,grinding, jointing material etc., complete as per SS and as directed by the Departmental officers

9.46

-

42570

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Supply and fixing of GI Grill with 25mm Square hallow 2.65mm GI Pipe and GI Flat 50mm, 6mm flat alround the frame as per design( separate sheet enclosed) on the top of compound wall including cost and conveyance all material to site and all labour charges for all the operations, incidental charges etc., complete for finished item of work and directed by the departmental officers.

735.84

-

2435630.4

... More
Development and Formation of Roads with Quarry Rubbish Embankment, Construction of Storm water drain;Painting to new Iron work with enamel paint of two coats over a single coat of Red Oxide Primer of apporved brand and shade in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912

735.84

-

129603.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.