Visakhapatnam Metropolitan Region Development Authority Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Visakhapatnam Metropolitan Region Development Authority Tender

Civil And Construction
Civil Works Others
Opening Date6 Jan 2023
Closing Date23 Jan 2023
Tender Amount₹ 3,38,380 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Kanyaka parameswari;Plastering in Cm (1:4) 12mm thick using best sand including cost, and conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers.

180

-

63900

... More
Kanyaka parameswari;Providing boarders with CM (1:3) mix 20mm thick wide alround the brick wall including cost conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers

47

-

18048

... More
Kanyaka parameswari;Providing exeternal emulsion paint two coats over a base coat of white cement (total 3 coats) incljuding cost and conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers

180

-

34819.2

... More
Kanyaka parameswari;VRCC M30 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) complete as per SS and as directed by the Departmental officers Columns footing for gate pillars below GL

0.55

-

5069.35

... More
Kanyaka parameswari;VRCC M30 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) complete as per SS and as directed by the Departmental officers Columns for gate pillars above GL

0.5

-

6183.5

... More
Kanyaka parameswari;VRCC M30 Grade design mix using 20mm and 12mm size graded HBG Metak (machince curshed) (SS-5) including cost and centerubg and conveyance of all materials to site , labour charges for all operations such as machinge mixing, laying, pocking, vibhrating, tamping, concreting, scaffolding and curing concrete etc., including all water leads complete as per SS (excluding cost of steel and its fabrications) complete as per SS and as directed by the Departmental officers Plinth Beam

2.5

-

29240

... More
Kanyaka parameswari;Fabrication and placing of Tor steel/Fe 500 grade steel reinforcement confirming to IS-226 and 1786-1985 of SAIL/ VSP/ TISCON or any approved TMT of different diameters including straightening, cutting & bending to required sizes & shapes, placing in position with cover blocks of approved material & size, including lift charges for all floors, tieing firmly with MS binding wire of 18 guage, forming grills for reinforcement work as per approved design & drawings (to be supplied at the time of executing the work) including cost, all taxes and conveyance of steel and all materials to site including all wastages such as overlaps, couplings, welded joints, chairs, space bars, binding wire, cover blocks and all operational, incidential, labour charges etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge. (APSS No.126)

284

-

22245.72

... More
Kanyaka parameswari;Supply and fixing of Iron Gate of size 2.00 x 1.50m using main support 100x50x6mm M.S.Rectangular frame L-Shape and Curved supports of 25x25mm squre solid rod in side and Horizontal & Vertical 15x15mm solid rods and fixing to top arrows and ornemental circles at 10x6mm flat fixing to top one row and bottam two rows includin cost , all taxes, conveyance of all materials to site and all labour charges for fixing including cost of hinges, aldrops, towerbolts, welding,grinding, jointing material etc., complete as per SS and as directed by the Departmental officers

3

-

13500

... More
Kanyaka parameswari;Painting to new Iron work with enamel paint of two coats over a single coat of Red Oxide Primer of apporved brand and shade in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912

6

-

1080



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.