Visakhapatnam Metropolitan Region Development Authority Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Metropolitan Region Development Authority Tender
Housekeeping Services
Agriculture or Forestry Works
Opening Date23 Feb 2023
Closing Date1 Mar 2023
Tender Amount₹ 82,59,265
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
596936Bid Award Id
ViewTender No
6/2022-23/UFD/VMRDA, Dt.23.02.2023Tender Authority
Visakhapatnam Metropolitan Region Development Authority ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Digging of 60x60x60cm pit, filling with soil mixture of red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
840
-
257997.6
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Digging of 1x1x1 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
10
-
13978.2
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Lawn including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
8520
-
1874400
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Areca palm/kentia palms(13"x13") 6 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
100
-
23600
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Pisonia alba (8"x10") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
976
-
40992
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Raphis palm (21"x21") 7 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
372
-
271560
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Dracena varietys(7"x8") 1 ftincluding transportation and unloading at site complete as per standard specifications as directed by the departmental officers
309
-
16377
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Bougainvillea all colours (8"x10") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
911
-
81079
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Euphorbia yellow (7"x8") 1 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
65
-
2730
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Ficus panda (21"x21") 7ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
25
-
17075
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Vietchia merrili Gold(21"x21") 7ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
13
-
36855
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Acalphya wilkinsania (7"x8") 1 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
150
-
7050
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of China box (13"x13") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
150
-
20550
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Pisonia alba/Eranthemum gold (13"x13") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
150
-
22050
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Thuja (21"x21")7 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
15
-
14970
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Syzygium myrtifolium (21"x21") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
15
-
33075
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Ficus panda Topiary Plant(25''x25'') 8 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
5
-
28875
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Topirary plants with multi balls (8) 10ft (the topiraries are to be finalized after taking concent of the concerned officers)
2
-
180000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Topirary plants (the topiraries are to be finalized after taking concent of the concerned officers) including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
3
-
165000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Landscape/Softscape (Development) from Sclptures area to Hanumanthuwaka view point Bed preparation for Lawn: Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete bed preparation and laying and ramming of lawn mats or rolls inproper position on existing made bed by internal transportation from dumped place,including cost of labour for laying,ramming by hand rolles/dhimsa,internal transportation and watering etc, complete for finished item of work excluding the cost of grass,fertilizers, chemicals etc for . for 1 Sqm
2000
-
563540
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Hedge Plantation Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for the item of work,but excluding the cost of the fertilizers and plant material.(*10 to 11 nos per sqm of plants and bag size shall be arrived based on spacing as per design) Hedge (394.67*0.6M =236.8 @10plants per sqm= 2368
236.8
-
103157.18
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Digging of 60x60x60cm pit, filling with soil mixture of red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
490
-
150498.6
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Internal transport of plants from Kailasagiri foot hill to planting point on uphill 2 vehicles per day x 5 days = 10 vehicles (Each vehicle @ 4000/- per day)
10
-
40000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Loading and unloading of plants for internal transportation (10 Mazdoors for 1 day x 5 days )
50
-
26250
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Lawn including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
2000
-
440000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Bougainvillea all colours (8"x10") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
360
-
32040
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Pseudo eranthemum/ Eranthemum gold/ maroon colour etc(8"x10") 2 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
695
-
29190
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Ixora singaporensis (13"x13") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
300
-
56700
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Sanchizia nobilis etc(8"x10") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
233
-
10019
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Furcaria varities / Agave (7"x8") 1ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
200
-
8400
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Senna auriculata (8"x10") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
240
-
12720
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Zephyranthes lily (7"x8") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
240
-
10080
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Tecoma capensis orange (7"x8") 1 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
400
-
18800
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Plumeria singapoorensis (21"x21") 7ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
10
-
7880
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Adeniums (13"x13") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
20
-
7360
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Bougainvillea balls Multi colour etc(21"x21") 7 ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
100
-
65600
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Buddha bamboo (18"x18") 6ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
60
-
59880
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Bougainvillea famosa (18" x 18" )6ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
50
-
23650
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Ficus panda gold (18" x18") 6ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
50
-
28900
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Schefflera varigated (13" x13") 2ft including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
20
-
4620
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Aglonema Red (13" x13") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
10
-
2310
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Buddha bamboo (18"x18") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
10
-
9980
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Dracena white (victoria)(18"x18") including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
10
-
7350
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of fiber pots 25 x 25 size including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
6
-
30000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of black plastic pots 18 x 18 including transportation and unloading at site complete as per standard specifications as directed by the departmental officers
150
-
37500
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of electric lawn mowers (3HP, 3 Phase)
2
-
135000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Electrical wire 45 Mtrs for electric lawn mower
4
-
18000
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Petrol operated grass cutting machines
4
-
159144
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Battery operated pesticides sprayer
4
-
22800
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Chainsaw chains 16 inches (STIHL)
4
-
4700
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Chainsaw chains 18 inches (STIHL)
4
-
5400
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Chainsaw chains 25 inches (STIHL)
4
-
8600
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Garden scissor with wooden handle 21" size
20
-
25500
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Falcon make Secatuer
10
-
5500
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of vermi compost
335.8
-
5473.54
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Neem cake
335.8
-
7723.4
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of NPK
335.8
-
14439.4
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Cholrodust
125
-
8125
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Towards errection of shade net structure (Flat shape all GI 4mm at 250 Sqm)
250
-
137500
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of SS Plants trolly towards transportation plants
2
-
48510
Development and additional beautification of Greenery from Visakha Diary parlour, Siva parvathula ar;Cost and supply of Irrigation equipments
1
-
200000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements