Urban Development Authority Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Urban Development Authority Tender
Opening Date1 Dec 2020
Closing Date15 Dec 2020
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
360502Bid Award Id
ViewTender No
18(3)/DM/2020-2021, Dt: 28-11-2020Tender Authority
Urban Development Authority ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply of manually operated LPG gas burners system as a stand by which should be used for during maintenance of automatic burners system.
4
-
-
Supply of 1 No manually operated LPG Gas burner system in the Ash trench
1
-
-
Supply of LPG Gas pipe line system from LPG gas Cylinders room to all burners.This includes auto ignition system ,flame failure device and gas drain consisting of a quick shut off valve ,filter,pressure switches,pressure gauages,secondary pressure regulator,solenoid valves and flexible hoses; LPG supply to the burners will be sourced from cylinder manifold system with grouping cylinders and through MS pipes.
1
-
-
Gas cleaning system (GCS) shall have Ash Extractor before the Furnace for the Removal of ash and shall have a Venturi scrubbing Arrangement after the furnace capable of removing fine dust particles through wet washing.Capacity of GCS Shall match the furnace rating and capable of washing the hot burned gas exiting from the furnace enabling the burnt let out. The venture scrubber shall be connected to a wash column for Gas Wash water seperartion.
1
-
-
Supply, Delivery & Installing of 2 Hp Centrifugal pump of circulate to mild Alkaline water through the venturi Scrubber at a rate of not less than 2 litres with a Discharge pressure Head of 3 Kg/Cm2 min) in the venturi Scrubber
1
-
-
Supply, Delivery & Installing of 5 HP motor with ID fan of rating for flue gas Withdrawal from the furnce in terms of Volumetric flow rate & Pressure head development .ID fan MOC shall be SS.
1
-
-
Fabrication & Supply of stack Chimney of 30 meters height .The stack chimney shall be fabricated out of MS material of thick 8 to 5mm varying from bottom to top with a top diametre shall not be less than 300mm.stack chimney shall be provided with accessories such as Sampling Nozzle,Lightning Arrestor,Drain Plug ,Bottom Door etc.,
1
-
-
Pipe Lines of Suitable diametres and length made of MS Material to interconnect equipments
1
-
-
Electrical Panel Board with complete Controls and indicators,Electrical Cables,Wiring to all Equipments From our Panel board
1
-
-
Labour Charges For installation and commisioning for Above Said Items
1
-
-
Transportation Packing Loading and Un loading Charges
1
-
-
Maintainance Charges for all equipments for First Two Years
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements