Tribal Welfare Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Bridge Construction
Opening Date6 Dec 2019
Closing Date20 Dec 2019
Tender Amount₹ 30,44,757 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,337
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
301301Bid Award Id
ViewTender No
Nit.No.61/2019-20/SE/TW/SCA/DB/Dt.28.11.2019Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earthwork in excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material and seigniorage charges complete for finished item of work as per Technical Specification 305 MORD / 304 MORTH for bailing out water.
378
38953
103.05
... More
Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification MoRT&H 1500, 1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course.
40.05
174422
4355.1
... More
Vibrated Plain Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification MORTH & H 1500,1700,2100( 4th revision) and 802, 803,1202 &1203 MORD complete for finished item of work for footings of Abutments, Piers and Wing Walls and raft foundations.
253.8
1146745
4518.3
... More
Vibrated Plain Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost, , and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification MORTH & H 1500,1700,2100( 4th revision) and 802, 804, 805, 806, 807, 1202 &1204 MORD complete for finished item of work for substructure for Body Walls, Parapet Walls, Abutments, Piers and Wing Walls.
144.6
691043
4779
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
36.72
225813
6149.6
... More
Construction of Gravel Shoulders with naturally occuring gravel including cost, , charges and conveyance of all materials to work site and spreading in uniform layers by with motor graded on prepared surface, by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per MoRT&H specification 401, 407 (4th revision) and 408 MORD as directed by the Engineer-in-Charge complete for finished item of work.
4.9
2445
498.9
... More
Vibrated reinforced cement concrete design mix M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for Bed Blocks
7.37
44605
6052.3
... More
Vibrated reinforced cement concrete design mix M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for Deck Slab
53.28
360716
6770.2
... More
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600,1700, & 2702 (4th Revision) and 800, 1206.3 MORD as directed by the Engineer-in-Charge complete for finished item of work for wearing coat over Deck Slab and Approch Slab.
11.14
66091
5932.8
... More
Back filling behind Abutments with gravel including cost and conveyance of all materials to site, and all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work.
221.09
147312
666.3
... More
Providing and laying stone boulders for apron for bed protection with stone boulders of minimum size 300mm thick other than granite and weighing not less than 40 Kgs as per Table 1300.1, laid dry including cost and conveyance of all materials to site, and labour charges complete for finished item of work as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH.
18
22750
1263.9
... More
Construction of RCC railing of M25 grade using HBG crushed stone aggregate of size not exceeding 20 mm and fine aggregate conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion including cost conveyance of all materials to site and seigniorage charges, labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution, excluding cost of steel and its fabrication charges as per approved drawings and technical specificationsas per MoRT&H 2703, 1500, 1600, 1700(4th Revision) and 800, 900 and 1208.3 MORD complete for finished item of work as per standard plans of MORTH vide drawing No.SD/202.
60
335991
5599.85
... More
Providing and fixing in position 25 mm thick mastic pad in expansion joint 650mm deep for fixed ends of simply supported spans, covered with sealant including cost and conveyance of all material to site and labour charges as per drawing and technical specifications 1207.2 MORD / 2600 MORTH complete for finished item of work.
27.5
17344
630.7
... More
Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Super structure.
5
256162
51232.3
... More
Providing weep holes in plain / reinforced concrete Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., as per technical specification MoRT&H 2706 & 2200 (4th Revision), 614, 709, 1204.3.7 MORD complete for finished item of work for weep holes.
28
14185
506.6
... More
TOTAL NUMBER OF ITMES 18 (EIGHTEEN ) ITEMS ONLY
-
3776678
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements