Tirumala Tirupati Devasthanams Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Electrical Generators And Transformers
Building Construction
Electrical and Electronics
Opening Date30 Jun 2021
Closing Date15 Jul 2021
Tender Amount₹ 13,19,895
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
420059Tender No
10/EE-X/TTD/VZG/2021-22Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
civil work;- do - in CM(1:5) 12 mm thick in Second Floor
12
-
2887.32
... More
civil work;Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 500 ml of liquid concentrated micronized cement water proof compound complies with IS:2645-2003 of approved make per 50 kg bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item.
30
-
14800.8
... More
civil work;- do - in CM (1:3) 12 mm thick in F F ceiling
25
-
6461
... More
civil work;Painting to new walls with Synthetic polymer luxury plastic Emulsion paint - (interior) two coats over a primary coat (total three coats) of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for internal walls
75
-
13635.75
... More
civil work;Casement window double panels with top fixed with S.S. frictionhinges (350 x 19 x 1.9 mm) made of (small series) frame47 x 50mm, sash 47 x 68 mm & mullion 47 x 68 mm allhaving wall thickness of 1.9 ± 0.2 mm and single glazing beadofappropriate dimension. ( Area of window upto 2.50 sqm).
-
-
-
... More
civil work;for roof slab
3.5
-
19986.23
... More
civil work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work.
102
-
3674.04
... More
civil work;Supply and fixing of premium make CPVC pipes and fittings to meet the requirement of ASTM-D-2846 and are produced in CTS (Copper tube sizes 1/2" to 2" Ahirvad flowguard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778: 2007)
-
-
-
... More
civil work;-do- Un skilled Mazdoors
5
-
2463.65
... More
civil work;Earthwork excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all Operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work
102
-
25611.18
... More
civil work;For columns upto basement
2.25
-
20204.82
... More
civil work;Providing Unplasticized PVC SWR Rain water downfall pipes for the following dia with ISI:13592 Type -A mark with necessary shoes, bends, collars etc., including making holes in walls, RCC slabs, beams, columns, including fixing with necessary wooden plugs (where it is required pipe clear of wall, wooden blocks of size equal to that of ears of the pipe shall be used), screws, iron clamps of 18 G and making good the same including cost and conveyance of all materials and incidental charges etc., complete as directed during execution.- do - 110 mm dia PVC pipe with wooden block of size 150mmx50mmx50mm
6
-
1465.68
... More
civil work;Note : The design mix shall be got designed by furnishing the information required as per clause 19.1.1 &19.1.2 of IS 456-2000 by the contractor at his own cost and get approved from the competent authority before execution. The cement considered for above M25 grade concrete is 380 kg/cu.m and the rate is arrived accordingly in the estimate. After the mix is designed and approved, if there is any variation in the quantity of cement, over the cement content adopted in the estimate, the same will be considered and paid/recovered at estimate rate + T.P ( Either increase or decrease in quantity adopted in the estimate). Payment will not be made for variation in the quantity of other materials such as coarse & Fine aggregates.
-
-
-
... More
civil work;Manufacture,Supply and fixing of MS tubular trusses made of MS tubes of specified dia including welding,cutting,fixing in position and painting two coats with synthetic ename paint Gr-1 over one primung coat with red oxide ,transportation etc.,complete as directed during execution.
3200
-
370432
... More
civil work;Painting to new walls with Acrylic Exterior Emulsion paint two coats over primary coat (total three coats) of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for external walls.
75
-
16982.25
... More
civil work;Providing and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame,sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVCprofile), uPVC extruded glazing beads of appropriate dimension, EPDMgasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size forfixing frame to finished wall, plastic packers, plastic caps and necessarystainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusionwelded including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approveddrawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes and silicon sealant . Note: For uPVC frame, sash and mullion extruded profiles minus 5%tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made.
9
-
60570.36
... More
civil work;Machine mixed and vibrated design mix M25 graded concrete for RCC works using of 20 mm HBG crushed metal 0.530 cum , 10 mm HBG crushed metal,0.362 cum , sand 0.407 cum and cement 380 kgs with water cement ratio of 0.48 (182.40 ltrs/ cum of CC) for durability consideration from approved quarry including cost and conveyance of all materials and water etc to site and including seigniorage charges, sales & other taxes on all materials including all operational , incidental and labor charges such as mixing charges, laying concrete, curing etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement concrete as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc, complete.
-
-
-
... More
civil work;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108
8
-
27404.32
... More
civil work;for columns in Second Floor
0.15
-
1648.28
... More
civil work;-do- in C.M (1:6) up to basement
10
-
59676.3
... More
civil work;- do - in CM(1:5) 20 mm thick in first Floor
90
-
31872.6
... More
civil work;Plastering in cement mortar using best river sand for approved source including cost and conveyance of all materials, screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete for the following propotions
-
-
-
... More
civil work;-do- in C.M (1:6) for super structure in Second floor
2
-
11996.42
... More
civil work;Finishing the flooring with Granolithic cement Concrete (1:1:2) for 20 mm thick using 6mm to 12mm size HBG crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m X 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost and conveyance of all materials like cement, metal, sand and water etc., complete for finished item of work.
100
-
39870
... More
civil work;- do - in CM(1:5) 20 mm thick in Second Floor
10
-
3674.4
... More
civil work;RCC M 20 design mix using 20 mm HBG crushed metal .480 Cum 10mm HBG crushed metal .320 cum, sand .400 Cu, and cement 350Kgs with water cement ratio of 0.53(185.5 lit per Cum of CC) etc., .horizontal plain sunshades or lofts projecting from the face of the wall 65 mm average thickness, 80 mm thick at the face of the wall and 50 mm thick at the free end and cast monolithically with the lintels or tailed to the full thickness of the wall where there are no lintels using 20 mm nominal size graded HBG crushed metal from any approved quarry confirming to the relevant ISI Standards including cost and conveyance of all matreials like cement, Fine aggregates(Sand) coarse aggregate, Water etc., to site and including all operational ,incidental and labour charges such as machine mixing,laying concerte, curing etc., completed but excluding cost of steel and its fabrication charges for finshned item of work. -do- 0.60 m width (1.0 x 0.065 x 0.60 m)
6
-
2111.1
... More
civil work;Providing centering, shuttering and scaffolding with props and steel plates using cashewrina Ballies and Wooden runners & staging including all bracings, cross members as per the approved shuttering plan and other accessories as per the norms and stability calculations including cost and conveyance of all accessories etc., complete for R.C.C. Roof slabs up to 150mm depth and up to 3.66 m of floor height including curing of RCC roof slabs removing of centering etc.,complete as directed during execution complete. (proper slopes to drain off wash/ rain water shall be provided as directed )
30
-
12590.4
... More
civil work;Construction of Brick Masonry in CM (1:6) using well burnt Bricks 2nd class or ground moulded ( Non- modular or traditional size) from approved kilns ( 230 x 110 x 70mm)including curing, cost and conveyance of all materials as directed during execution and complying with standard specifications etc.,complete.
-
-
-
... More
civil work;-do- 22.20mm OD pipe SDR 13.5
15
-
1365.75
... More
civil work;Filling of foundations and basement with best river sand in layers of not more than 15 cms. thick each well watered to saturation and consolidated including cost and conveyance of all materials, incidental charges etc., complete.
42
-
25165.56
... More
civil work;Supply and fixing of Galvalume sheet Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.47mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020,strength: Maximum 12 Meters with Regular Range Colours with minimum end lap of 15 cms etc., complete as directed during execution.
85
-
47927.25
... More
civil work;For plinth beams
4.5
-
49017.51
... More
civil work;Providing High Yield Strength deformed (HYSD)Fe 500 / Thermo mechancially treated (TMT) steel bars (as per IS 1786 - 1979) of different diametres for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars including all wastages such as over laps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS NO.126)
2.2
-
151480.1
... More
civil work;- do - in CM(1:5) 12 mm thick in first Floor
76
-
17276.32
... More
civil work;Construction of 110 mm thick Brick partition walls in CM (1:4) using well burnt bricks 2nd class or ground moulded (Non modular or traditional size) bricks (230X110X70 mm) including curing, cost and conveyance of all materials etc,. Complete
7
-
5192.25
... More
civil work;Supply of labour for miscellaneous works
-
-
-
... More
civil work;Raft & Footings
10
-
83777.2
... More
civil work;Supply of SYMET BIB COCK (CAT.NO:121) Standard 15 mm size as per IS 9763-2000 with ISI mark male thread with deluxe handles,86 mm long and 102 mm high and 43mm breadth 12mm seat dia and replaceable washers,having approx. weight of 90gms.
2
-
228.62
... More
civil work;-do- T or L beams / Lintel beams in First floor
1.5
-
14120.3
... More
civil work;-do- in C.M (1:6) for super structure in First floor
10
-
59897.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements