Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Opening Date21 Jun 2021
Closing Date6 Jul 2021
Tender Amount₹ 62,27,212 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of shed at Tirumala;Filling of foundations and basement with best river sand in layers of not more than 15 cms. thick each well watered to saturation and consolidated including cost and conveyance of all materials, incidental charges etc., complete.

200

-

260622

... More
Construction of shed at Tirumala;Filling with useful available excavated earth (excluding rock) in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work. Note: Cost of transportation of good quality earth has not been included. Only labour for carrying carted earth with a lead of 50m to the foundation pits has been taken in the rate. The cost of carted earth / sand may be worked out separately if the same is not available from adjoining area.

40

-

1571.2

... More
Construction of shed at Tirumala;Conveyance of excavated surplus earth/debris to a distance 2 kms from the site of work at the place specified by the Engineer-in-Charge including loading and unloading etc., complete as directed during execution.

550

-

26559.5

... More
Construction of shed at Tirumala;Cement Concrete (1:4:8) using 40 mm ( 0.54 cu.m), 20mm (0.27 cu.m) and 12 mm (0.09 cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete.

80

-

387978.4

... More
Construction of shed at Tirumala;Machine mixed and vibrated design mix concrete M30 for pavement works for durability consideration with necessary reinforcement using 0.425 cu.m of 19mm to 22mm HBG crushed metal 0.425 cu.m of 12mm to 14mm IRC HBG crushed metal, 0.406 cu.m of sand of any approved quarry and cement 415 Kgs with water cement ratio of 0.38 (158 lit/cu.m of C.C) well compacted including centering with steel or wooden frames, preferably steel frames in straight position casting, curing cost and conveyance of all materials including centering charges, form work etc., complete but excluding cost of steel and binding wire, fabrication charges etc., complete as directed during execution and neat finishing of top surface and also providing expansion joints, construction joints wherever found necessary excluding cost of asphalt pad etc., complete. NOTE: If pavement concrete is laid in between the existing kerbs deduction may be made proportionately for centering charges of 160.00/cu.m

37

-

283021.51

... More
Construction of shed at Tirumala;Plain Cement Concrete (1:2.5:5) -Grade M15 using 20 mm ( 0.54 cu.m) and 12 mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete. Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix.

4

-

22272.4

... More
Construction of shed at Tirumala;Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cum (707 kgs),. 10 mm HBG crushed metal, 0.362 cum (471 kgs) , sand 0.407 cum (616 kgs.) and cement 380 kgs with water cement ratio of 0.48 ( 182.40 ltrs/ cum of CC)etc., to site and including Seignoirage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing, centering, shuttering charges etc. Using Steel scaffolding pipes , jack props, wallers, Foot plates , brackets, steel centering plates, etc., Unsupported height up to 3.66 m, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with cement from standard suppliers approved by the department. Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix if mixing is done by volume mixing.

-

-

-

... More
Construction of shed at Tirumala;Note : The design mix shall be got designed by furnishing the information required as per clause 19.1.1 &19.1.2 of IS 456-2000 by the contractor at his own cost and get approved from the competent authority before execution. The cement considered for above M25 grade concrete is 380 kg/cu.m and the rate is arrived accordingly in the estimate. After the mix is designed and approved, if there is any variation in the quantity of cement, over the cement content adopted in the estimate, the same will be considered and paid/recovered at estimate rate + T.P ( Either increase or decrease in quantity adopted in the estimate). Payment will not be made for variation in the quantity of other materials such as coarse & Fine aggregates.

-

-

-

... More
Construction of shed at Tirumala;Raft and Column Footings

11

-

102311.88

... More
Construction of shed at Tirumala;Columns Up to Basement( Pedestals )

17

-

168960.96

... More
Construction of shed at Tirumala;Columns In First Floor

9

-

114563.88

... More
Construction of shed at Tirumala;Columns In Second Floor

0.5

-

6730.28

... More
Construction of shed at Tirumala;Plinth Beams

12

-

143704.68

... More
Construction of shed at Tirumala;lintels In First Floor

9

-

113737.95

... More
Construction of shed at Tirumala;Roof Beams In First Floor

9

-

106941.87

... More
Construction of shed at Tirumala;RCC M- 20 Design mix using 20mm HBG crushed metal 0.480 cu.m , 10mm HBG crushed metal 0.320 cu.m , sand 0.400 cu.m and cement 350 kgs with water cement ratio of 0.53 (185.5 Lit per cu.m of CC ) etc. horizontal plain sunshades or lofts projecting from the face of the wall 65mm average thickness,80mm thick at the face of the wall and 50mm thick at the free end and cast monolithically with the lintels or tailed to the full thickness of the wall where there are no lintels using 20mm size graded machine crushed hard granite metal (coarse aggregate) from any source conforming to the relevant ISI standards including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, centering, shuttering charges etc.,complete, but excluding cost of steel and its fabrication charges for finished item of work. - do - 0.80 m width Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix if mixing is done by volume mixing

-

-

-

... More
Construction of shed at Tirumala;For Sunshade - In First Floor

20

-

21087.8

... More
Construction of shed at Tirumala;Supply and placing of the M20 Design Mix using of 10mm HBG crushed metal 0.480cu.m,6mm HBG Crushed metal 0.320cu.m,sand 0.400cu.m and cement 350Kgs with water cement ratio of 0.53(185.50 ltrs/cu.m of CC) etc., from any source confirming to the relevant ISI standard including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing, centering charges, shuttering charges etc., complete with minimum cement content as per IS code from standard suppliers approved by the department but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Construction of shed at Tirumala;- do - for 50 mm thick precast slabs using 10 mm graded aggregate HBG crushed metal from any source conforming to the relevant ISI standards, with necessary reinforcement excluding cost of steel and tying of grills, centering charges, but including cost of necessary form work etc., complete as directed by the department.

45

-

19240.65

... More
Construction of shed at Tirumala;Supply and placing of the M20 Design Mix using of 10mm HBG crushed metal 0.480cu.m,6mm HBG Crushed metal 0.320cu.m,sand 0.400cu.m and cement 350Kg with water cement ratio of 0.53(185.50 ltrs/cu.m of CC) etc., from any source confirming to the relevant ISI standard including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with minimum cement content as per IS code from standard suppliers approved by the department but excluding cost of steel and its fabrication charges, centering charges, shuttering charges for finished item of work (APSS No. 402)

20

-

12491.4

... More
Construction of shed at Tirumala;Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix if mixing is done by volume mixing. RCC M20 Design mix precast slabs 80 mm thick using 20 mm graded size HBG crushed metal

-

-

-

... More
Construction of shed at Tirumala;Providing high yield strength Deformed bars below 36mm Fe-500 (HYSD)/ Thermo Mechanically Treated (TMT) bars mild steel (MS) steel bars ( Fe-500 grade as per IS 1786-1979) of different dia metres for RCC works, including labour charges for strengthen, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18sWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as over laps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126) (In the absence of 18G binding wire,2 nos of 20G binding wire in tandem are to be strictly adhered). Note: Unless otherwise fabrication and placement of steel, no pre-payment shall be made against the supply of steel reinforcement

14

-

908142.76

... More
Construction of shed at Tirumala;Cement Concrete (1:3:6) using 20 mm ( 0.54 cu.m) and 12 mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete. Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix.

32

-

170756.8

... More
Construction of shed at Tirumala;Construction of Brick Masonry CM (1:6) using well burnt Bricks 2nd class or ground moulded (Non- modular or traditional size) (230 x 110 x 70 mm)including curing, cost and conveyance of all materials as directed during execution and complying with standard specifications etc., complete.

-

-

-

... More
Construction of shed at Tirumala;Upto basement

40

-

265139.2

... More
Construction of shed at Tirumala;In First floor

82

-

554845.62

... More
Construction of shed at Tirumala;In Second Floor

2

-

13641.76

... More
Construction of shed at Tirumala;Construction of 110 mm thick Brick partition walls CM (1:4) using well burnt bricks 2nd class or ground moulded (Non modular or traditional size) bricks (230X110X70 mm) including curing, cost and conveyance of all materials etc,. Complete

-

-

-

... More
Construction of shed at Tirumala;In First Floor

130

-

106555.8

... More
Construction of shed at Tirumala;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108

10

-

36979.7

... More
Construction of shed at Tirumala;Providing and fixing factory made uPVC white colour sliding glazed window above 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads, uPVC extruded interlocks and uPVC extruded Inline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy (white powder coated) handle on one side of extreme panel along with zinc plated mild steel multi point locking having transmission gear with keeps, zinc alloy (white powder coated) touch lock with hook (if required for wire mesh panel), stainless steel (SS 304 grade) body with adjustable double nylon rollers (weight bearing capacity to be 120kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc.

26

-

183797.9

... More
Construction of shed at Tirumala;Profileof frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shallbe filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of window above2.50 sqm upto 4.00 sqm.) Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made.

-

-

-

... More
Construction of shed at Tirumala;Supplying and fixing in position Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of standard make with hot pressed bonded with liquid phenol formaldehyde with rebate cutting, Single leaf using Best Indian Teak wood frames of size 75mm x 100mm without threshold plate, including cost of M.S "Z" Hold fasts of 230 x 50 x 6mm, M.S Powder coated Butt hinges of 125 x 65 x 2.12mm, screws, nails, etc., complete, (excluding cost of other fixtures which will be paid separately but including labour charges for fixing the fixtures). 1002, 2202, Part - I 1991

16

-

72738.56

... More
Construction of shed at Tirumala;Supplying of the following Anodized alluminium hardware fittings of approved make to the door and windows including cost of screws , nails etc., including cost and conveyance etc., complete as directed during execution.

-

-

-

... More
Construction of shed at Tirumala;Anodized Aluminium Aldrop sliding door bolts 16 mm x 300 mm long

4

-

1573.12

... More
Construction of shed at Tirumala;Anodized Alluminium Tower bolts of size 10 mm dia X 200 mm long with ISI mark IS 204

8

-

943.44

... More
Construction of shed at Tirumala;Anodized Alluminium Tower bolts of size 10 mm dia X 250 mm long with ISI mark IS 204 (pt-II) 1978

8

-

1135.84

... More
Construction of shed at Tirumala;Anodized alluminium Door Handle 100 mm long with ISI mark IS 208

8

-

567.92

... More
Construction of shed at Tirumala;Supply of Heavy Duty Alluminium Door stopper

4

-

242.72

... More
Construction of shed at Tirumala;Supplying and fixing in position M.S Ornamental grills for windows and ventilators or for veranda openings using M.S. Flats, square rods, angles sheets etc., of approved design including necessary cuttings, bending fabrication, welding, grinding and finishing smooth including painting the grills with Two coats with Synthetic enamel paint over a Primary coat (Red oxide metal primer) (total three coats) of approved make and colour including cost of making the holes into RCC or masonry works and making good the same wherever necessary, including cost and conveyance of all materials, incidental charges etc., complete.

875

-

89153.75

... More
Construction of shed at Tirumala;Plastering in Cement mortar using best river sand from approved quarry including cost and conveyance of all materials, screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete for the following proportions

-

-

-

... More
Construction of shed at Tirumala;In CM (1:3) 12mm thick

-

-

-

... More
Construction of shed at Tirumala;In First floor

175

-

46305

... More
Construction of shed at Tirumala;In CM (1:5) 12mm thick

-

-

-

... More
Construction of shed at Tirumala;up to basement

160

-

40371.2

... More
Construction of shed at Tirumala;In First floor

400

-

106448

... More
Construction of shed at Tirumala;In second Floor

25

-

6789

... More
Construction of shed at Tirumala;In CM (1:5) 20mm thick

-

-

-

... More
Construction of shed at Tirumala;up to basement

150

-

58693.5

... More
Construction of shed at Tirumala;In First floor

600

-

242694

... More
Construction of shed at Tirumala;In Second Floor

12

-

4926.36

... More
Construction of shed at Tirumala;Finishing the flooring with Granolithic cement Concrete (1:1:2) for 20 mm thick using 6mm to 12mm size HBG crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m X 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost and conveyance of all materials like cement, metal, sand and water etc., complete for finished item of work.

320

-

138188.8

... More
Construction of shed at Tirumala;Painting two coats for New wood work with Ready mixed Synthetic Enamel paint in all shades Grade-I having VOC (Volatile Organic Compound) coat content less than 50 grams/liter and over a priming coat with wood primer (total 3 coats) approved colour and make including brushes to have an even shade including cost and conveyance of all materials as directed during execution complying with standard specifications etc., complete.

25

-

4645

... More
Construction of shed at Tirumala;Painting two coats for New Iron work with Ready mixed Synthetic Enamel paint in all shades Grade-I having VOC (Volatile Organic Compound) coat content less than 50 grams/liter and over a primary coat with Red oxide metal primer one coat (total 3 coats) approved colour and make including brushes to have an even shade including cost and conveyance of all materials as directed during execution complying with standard specifications etc., complete.

50

-

8715

... More
Construction of shed at Tirumala;Painting two coats for new walls with Acrylic Emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/liter over a primer coat Cement primer grade-II (water thinnable) (total 3 coats) of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for external walls.

762

-

183177.18

... More
Construction of shed at Tirumala;Painting with two coats for new walls Acrylic Emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 50 grams/liter over a primer coat Cement primer grade-I (water thinnable) (total 3 coats) of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for internal walls.

605

-

105173.2

... More
Construction of shed at Tirumala;Supplying and fixing in position M.S tubes & pipes of all diameters as per ISI 1161 of approved size design including necessary cuttings, bending fabrication, welding, grinding and finishing smooth including painting the same with Two coats with ready mixed Synthetic enamel paint in all shades Grade-1 having VOC(volatile Organic compound )content less than 50grams/Litre over a Primary coat (Red oxide primer grade-1) (total three coats) of approved make and colour including cost of making the holes into RCC or masonry works and making good the same wherever necessary, including cost and conveyance of all materials, incidental charges etc., complete.

4600

-

549516

... More
Construction of shed at Tirumala;Supply, fixing and Painting of MS Plates of various sizes inlcuding cost and conveyance etrc complete as directed during Supply, fixing and Painting of Ms Plates of various sizes inlcuding cost and conveyance etrc complete as directed during the execution of the work. Including Labour charges for fabricating steel works like window grills, compound wall grills, iron doors windows including cost of welding rods, power charges including cost of fixing in position. including painting the grills with two coats over a primary coat (total three coats) with synthetic enamel paint of approved make and colour etc., complete

380

-

37597.2

... More
Construction of shed at Tirumala;Supply of bolts and nuts

150

-

13224

... More
Construction of shed at Tirumala;Supply and fixing of Galvalume sheet Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.47mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours with minimum end lap of 15 cms etc.,complete as directed during execution. (Original coil shall be of make TATA Blue scope/JSW)

450

-

270630

... More
Construction of shed at Tirumala;Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.47mm thick, Width: 0.585, Length: Maximum 2½ Meters.

100

-

26564

... More
Construction of shed at Tirumala;Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap ISI Mark or equivalent brand approved by the department. 580x440mm.

2

-

3537.04

... More
Construction of shed at Tirumala;Supplying & Fixing Indian make 550 x 400 mm - Single C.P. Pillar cock Flat Back Wash Hand Basin 1st quality confirming to IS:2556-Part-4:1972 with ISI mark or equivalent approved by the department, with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread confirming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block.

2

-

3868.18

... More
Construction of shed at Tirumala;Supplying and fixing of BITW coat hanger of size 0.60 x 0.076 x 0.025 m including finishing smooth the teak wood reapers and polishing with two coats of French Polish over Bee waxing of approved quality and fixing the specified (CP or aluminium ) coat hooks of different sizes of required numbers at equal spacing as directed during execution and fixing the coat hangers to the walls including cost and conveyance of all materials like screws, nails etc( excluding cost of hooks and fixing charges).

8

-

1342.24

... More
Construction of shed at Tirumala;Supplying and fixing of NP Coat Hooks

45

-

2331.45

... More
Construction of shed at Tirumala;supply & fixing towel rod (CP) of 24'' long and 3/4'' dia

4

-

1742.68

... More
Construction of shed at Tirumala;supply & fixing NP soap dish heavy type with NP Screws.

2

-

486.92

... More
Construction of shed at Tirumala;Supplying and fixing in position 600 x 450 mm size wall mirror with 5 mm thick glass (Saint Gobion) with 6 mm plywood IS 303 bwr (both sides commercial) back in position with 12 mm  Aluminium 'U' channel (Jindal make) including cost and conveyance of all materials etc., complete.

4

-

2838.6

... More
Construction of shed at Tirumala;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 15 mm NB Size 

5

-

3217.35

... More
Construction of shed at Tirumala;Supplying, laying and jointing of G.I. pipes of "B" class of ISI marked and  approved by the department including cost and conveyance and all other incidental charges etc., and properties and weight as per IS 1239  marked (other than TATA make). Laying and jointing  of G.I. Pipes and G.I Specials of approved make such as tees, couplings(sockets), reducing tees, reducing sockets, reducing elbows, hex nipples, GI cross, long couplings and nipples where ever necessary including jointing the pipes or running along the walls/floor  including making holes/grooving the walls and making it good with C.M (1:3) including cost of wooden plugs, cleats, clamps and screws  as directed during execution including cost and conveyance of all materials etc.,complete. 

-

-

-

... More
Construction of shed at Tirumala; --Do-- 40mm dia G.I pipe

50

-

20472.5

... More
Construction of shed at Tirumala; --Do-- 25mm dia G.I pipe

50

-

17403.5

... More
Construction of shed at Tirumala; --Do--  20mm dia G.I pipe

10

-

2672.2

... More
Construction of shed at Tirumala;Supplying, laying and jointing in position the PVC /SWR pipes & fittings ( as per ISI standards) 6kg/cm2 (Type-B) labour charges for laying, fixing and commissioning the PVC pipes including couplers/bends/tees etc., any dia including fixing necessary fittings like bends, plugs, couplers, junctions, tees,etc., with solvent jointing as per standard practice.

-

-

-

... More
Construction of shed at Tirumala;-do-110mm dia 6kg/cm2  double socket pipe

60

-

24390

... More
Construction of shed at Tirumala;Supply of Prince/ Sudhakar make or equivalent quality U.V resistant UPVC SWR pipes & fittings ( as per ISI standards) 

-

-

-

... More
Construction of shed at Tirumala;110mm dia bends 87.5 degrees

8

-

641.2

... More
Construction of shed at Tirumala;110mm dia door bends 87.5 degrees

8

-

833.52

... More
Construction of shed at Tirumala;110mm dia single Tee

8

-

833.52

... More
Construction of shed at Tirumala;110mm x 75mm dia Reducer

8

-

439.68

... More
Construction of shed at Tirumala;110mm dia Single "Y" (with door)

8

-

1328.16

... More
Construction of shed at Tirumala;110mm dia Double "Y" (with door)

8

-

1795.36

... More
Construction of shed at Tirumala;110mm dia Vent cowl

8

-

146.56

... More
Construction of shed at Tirumala;Supplying & fixing 150 mm x 100 mm SWG gully traps of ISI make confirming to IS 651 & 4127 with C.I Grating & Construction of  Brick masonry in CM (1:6) prop. intermediate chamber and fitted with  304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover.

2

-

1099.64

... More
Construction of shed at Tirumala;Supplying and fixing of 3" (76.2 mm ) Nahany Trap ( without Jali without inlet)

4

-

338.92

... More
Construction of shed at Tirumala;Supplying and fixing of following  S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type.

-

-

-

... More
Construction of shed at Tirumala;40 mm dia NB size

2

-

4994.14

... More
Construction of shed at Tirumala;25mm dia NB size

4

-

4891.32

... More
Construction of shed at Tirumala;20mm dia NB size

4

-

3434.92

... More
Construction of shed at Tirumala;Supply and fixing 12.7mm brass bib cock  Indian make heavy duty 300grams (Seiko / senior)

10

-

2154.8

... More
Construction of shed at Tirumala;Flooring with Antiskid floor tiles 1st quality of all series & shades (as per manufacture specification), set over base coat of cement mortar (1:6) 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 kgs per sq.m. jointed with neat cement to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like flooring slab, cement, sand and water etc., complete,  for finished item of work. (Note: Unless otherwise laying of flooring is finished, no pre-payment shall be made for the tiles against supply)

25

-

25770

... More
Construction of shed at Tirumala; -do- Supply of Non-skid red or white full body Ceramic floor tiles of size 450 x 450 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs

-

-

-

... More
Construction of shed at Tirumala;Finishing the sides of walls with  Ist quality glazed wall tiles of following sizes of approved colour and brands  including pointing the joints with  the same colour of cement by mixing the same colour pigment in white cement and over a bed of C.M.(1:3), 12 mm thick & Cement slurry of 33 Kg /10 sq.m shall be used for fixing bed tiles including cost and conveyance of all materials, curing, incidental charges etc., complete (No separate plastering shall be paid to the walls).  (Note: Unless otherwise laying of flooring is finished, no pre-payment shall be made for the tiles against supply)

65

-

44335.2

... More
Construction of shed at Tirumala; -do- Supply of glazed red or white full body ceramic wall tiles of size 300 x 450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs

-

-

-

... More
Construction of shed at Tirumala;Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Flowguard  SDR 11 pipes are made from identical CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)

-

-

-

... More
Construction of shed at Tirumala;22.20mm OD Pipe - SDR 11

40

-

4259.2

... More
Construction of shed at Tirumala;28.60mm OD Pipe - SDR 11

40

-

6595.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.