South Central Railway Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

South Central Railway - SCR Tender

Works
Electrical Works
Ireps
Opening Date13 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 2,42,80,549.95 
Notes
Download

Costs

Summary

Glu: Electrification Of Proposed New Lines In Connection With "proposal For Provision Of Standard Layout On Double Line

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2(b)Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

5348000

... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 6

-

-

111965

... More
3(b)Erection of fabricated steel work such as TTC, Portals, SPS etc. 7

-

-

323820

... More
3(e)Supply and erection of Guy rod assembly.

-

-

91434

... More
4(a)(i)Supply without insulator and Erection of Single bracket assembly for conventional OHE. 9

-

-

1556100

... More
4 (a) (ii)Extra on 4(a) (1) for supporting two OHEs. 10

-

-

58870

... More
4(b)(i)Supply without Insulator and erection of a pull off arrangement for one OHE.

-

-

83230

... More
5 (a) (i)Supply without insulator and erection of mounting arrangement for span wire. 12

-

-

14714

... More
5 (a) (ii)Supply & Erection of span wire (130 sq.mm) 13

-

-

107100

... More
6(a)Erection of regulated conventional OHE.

-

-

217126

... More
8(a) (v)Supply and erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE. 15

-

-

668556

... More
8(a) (xii)Marking of "Y" - Measurement at BWA locations.

-

-

1554

... More
8(b)(ii) Supply without Insulator & erection of materials for termination of Double Overhead equipment conductor.

-

-

80010

... More
9(d)Supply without insulators and erection of anti creep with Cadmiumm copper catenary wire in polluted area.

-

-

32648

... More
10(a) Extra on Item 6(a) for supply and erection of additional fittings at a turn-out or diamond crossing or overlap. 19

-

-

16856

... More
11(a) (i)Supply without insulator and erection of 25 kV solid core cut-in insulator.

-

-

42672

... More
11(a) (ii)Supply without insulator and erection of 25 kV solid core suspension insulator. 21

-

-

9849

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators. 22

-

-

8988

... More
12(a)Supply without Insulators and erection of 25 kV Section Insulator assembly.

-

-

224511

... More
13(a)Supply without insulators and erection of 25 kV Single Pole Isolator without earth contact assembly. 24

-

-

360318

... More
13(c )Supply without insulators and erection of 25 KV Double pole isolator. 25

-

-

93884

... More
13(d)Extra for supply and erection of an earth contact assembly in an isolator. 26

-

-

16828

... More
13(e)Extra on item 13(a), (b) or (c) for an inter-locking device. 27

-

-

42434

... More
15(a)Supply and erection of all types of copper jumpers.

-

-

66143

... More
15(d)Supply of materials and erection of large copper jumper wire 160 sq.mm between Aluminium bus and cross feeders. 29

-

-

3311

... More
16(a)Supply and erection of structure bonds. 30

-

-

105000

... More
16(aa)Drilling of holes on rails 31

-

-

5600

... More
16(b)Supply and erection of longitudinal bond. 32

-

-

29820

... More
16(c) Supply and erection of transverse and special bonds. 33

-

-

16380

... More
17(a)Supply and erection of Earth electrode. 34

-

-

5803

... More
17(b)Extra for special embedment of earth electrode. 35

-

-

1813

... More
31(a)Transfer of equipment from one mast or support to other.

-

-

23688

... More
31(b)Provision of an additional bracket assembly / assemblies on a mast or support. 37

-

-

14000

... More
31(d) Dismantling of Over Head Equipment. 38

-

-

5272.75

... More
31(e )Dismantling of Feeder wire / Return conductor. 39

-

-

2275

... More
31(f)Splicing and extension of Over head conductors. 40

-

-

3864

... More
31(h)Slewing of equipment. 41

-

-

31430

... More
31(k) (i) Dismantlement of OHE mast / structure by cutting. 42

-

-

19600

... More
31(l)(i) Retrieval of traction masts, main masts, TTC uprights etc. 43

-

-

35000

... More
31 (n) Dismantlement of guy rod. 44

-

-

1582

... More
31 ( r) Dismantling of cantilever assemblies including insulators 45

-

-

4158

... More
31 (s)Dismantling of fabricated steel & SPS.

-

-

197.75

... More
31 (t)(i)Dismantling of regulating equipment (Three pulley type) with counter weight assembly for conventional /composite OHE. 47

-

-

5950

... More
31 (t)(iv)Dismantling of copper jumper.

-

-

406

... More
31(t)(v)Dismantling of a material of termination of double over head equipment conductor.

-

-

1568

... More
32/3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station under power block.

-

-

111965

... More
32/3(b)Erection of fabricated steel work such as TTC, Portals, SPS etc under power block. 51

-

-

323820

... More
32/3(e)Erection of Guy rod assembly under power block.

-

-

9492

... More
32/4(a) (i)Erection of Single bracket assembly for conventional OHE under power block. 53

-

-

103950

... More
32/ 5 (a) (ii)Erection of span wire (130 sq.mm) under power block. 54

-

-

7700

... More
32/6 (a)Erection of regulated conventional OHE under power block.

-

-

91070

... More
32/8(a) (v)Erection of regulating equipment (3-pulley type) with counter weight assembly for conventional OHE under power block. 56

-

-

35700

... More
32/11 (b)Erection of 25 kV Post Insulators under power block. 57

-

-

2268

... More
32/12 (a)Erection of 25 kV Section Insulator assembly under power block. 58

-

-

14133

... More
32/15 (a)Erection of all types of copper jumpers under power block.

-

-

4466

... More
32/15 (d)Erection of large copper jumper wire 160 sq.mm between Aluminium bus and cross feeders under power block. 60

-

-

406

... More
32/ 31(a)Transfer of equipment from one mast or support to other under power block.

-

-

23688

... More
32/31 (d) Dismantling of Over Head Equipment under power block. 63

-

-

5272.75

... More
32/31 (e )Dismantling of Feeder wire / Return conductor under Power block. 64

-

-

2275

... More
32/31(f)Splicing and extension of Over Head conductors under power block.

-

-

3864

... More
32/31(l)(i)Retrieval of traction masts, main masts, TTC uprights etc under power block. 66

-

-

35000

... More
32/ 31(k)(i)Dismantlement of OHE masts/structure by cutting under power block. 67

-

-

19600

... More
32/31 (r) Dismantling of cantiliver assemblies including insulators under power block. 68

-

-

4158

... More
32/31 (s)Dismantling of fabricated steel & SPS under power block. 69

-

-

197.75

... More
32/31 (t)(iv)Dismantling of copper jumper under power block.

-

-

406

... More
32/ 31(t)(v)Dismantling of a material of termination of double over head equipment conductor under power block. 71

-

-

1568

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a). 72

-

-

55860

... More
33 / 3(b)Extra on erection rate for steel work done manually under item No. 3(b). 73

-

-

161840

... More
33/ 6(a) Extra on erection rate for stringing work done manually under item 6(a) ,6(d). 74

-

-

45542

... More
40 Supply and Erection of Number Plates on existing masts. 75

-

-

40250

... More
41 Supply and erection of various types of Caution boards for 25 kV Traction.

-

-

12600

... More
42 Supply and erection of Shock Treatment charts Tri - lingual English, Hindi and telugu (Laminated).

-

-

735

... More
3(a) Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS Specifications.

-

-

7042157.5

... More
3(b)Supply of fabricated steel work other than masts such as TTC's, portal sets (with all components) etc as per RDSO drawings and IS specifications.

-

-

3589985

... More
3(c) Supply of Fabricated steel work other than mast, TTCs, portals, such as SPS, special fabricated steel etc.

-

-

522698.75

... More
11(ax)(ii)Supply of insulators for item no 11(a)(i),(ii) for polluted zone

-

-

39247

... More
11(bx)Supply of 25KV Post insulator for 11(b). 87

-

-

59532.2

... More
12(ax)Supply of section and 9 Ton Insulator for item No.12(a) 88

-

-

73593

... More
13(ax)Supply of 25KV Post & Operating rod insulators for item 13(a) 89

-

-

129542.4

... More
13(cx)Supply of 25 KV post & Operating rod insulators for item 13 (c )

-

-

86361.6

... More
31(f)(i) Supply of Contact wire Splice 91

-

-

6150

... More
31(f)(ii) Supply of catenary wire Splice 92

-

-

2420

... More
Supply of Large span wire ending clamp. 93

-

-

22140

... More
53Transportation of released/New TrD materials.

-

-

30000

... More
Providing and laying pitching with stone boulders, weighing not less than 35 kg each 94 with voids filled with cement sand mortar 1:4 on slopes laid with moorum/sand including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specification including OPC 53 grade cement of 1.25qtl per cum

-

-

158361

... More
Breaking of mass concrete by using pnematic breaker (tractor mounted) including disposal of debris out of the yard limits including crossing of tracks, rehandling etc.,

-

-

59268

... More
Supply of Porcelain bracket insulator(1050 CD). 83

-

-

334500

... More
Supply of Porcelain stay insulator(1050 CD). 84

-

-

329250

... More
Supply of 25 kV Porcelain 9-Tone Insulator [Polluted Zone] 1050 mm CD.

-

-

244640

... More
Supply of heavy duty light weight Iron ladder Trolley complete assembly with cast nylon wheels 4 nos.

-

-

327096

... More
Supply of 5 Ton gearless hand operated pulling and lifting machine (tirfor), lifting capacity 5.2 Ton & Pulling capacity 3.2 Ton with 20 mtrs.

-

-

115640



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.