Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Opening Date1 Feb 2020
Closing Date7 Feb 2020
Tender Amount₹ 4,25,551 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
312242Bid Award Id
ViewTender No
NIT No 52 Dt 25 01 2020Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with bitumen Emulsion 80/100 Gr (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared Bituminous/Granular surface treated with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th Revision) and as directed by the Engineer-in-Charge.
623
6853
-
... More
Providing, laying of close graded premix surfacing material (Mixed seal surfacing) of 20mm thickness by hot mix plant using hard blasted gr5anite crushed aggregates of 13.2 mm to 0.09mm (Type ‘B’) as per Table 500-19 of specification 508 of MoRT&H (5th Revision) premixed with bituminous binder VG-30 (60/70) grade @ 19.00 Kg per 10 Sqn aream including cost of all materials and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H (5th Revision) Specification No.508 complete for finished item of work in all respected as directed by Engineer-in-Charge.
623
84105
-
... More
Hire charges of JCB / Front end loader for clearing debris, cow dung from shoulders including hire charges, fuel charges, crew charges and any incidental charges etc., complete as directed by the Engineer-in-charge during the execution of work (Rate as per SSR 2019-20).
13
20731
-
... More
Forming shoulders with borrowed useful seclected earth having MDD of not less than 1.75 gms/cc from outside road boundary by mechanical means with all leads and lifts in cluding pre watering of soil at borrow area, removeal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with Vibratory Road Roller @ OMC to meet requirement to table 300-2 of MORT&H, including all hire and operational charges of T&P, complete for finished item of work as per MORT&H specification 305 (5th revision).
51
7548
-
... More
(RUPEES FOUR LAKHS ELEVEN THOUSAND EIGHT HUNDRED AND THGIRTY SEVEN ONLY)
-
411837
-
... More
Rate of progress
-
-
-
... More
Progress Upto 1 Month - 100% of work should be completed in all respects.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements