Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Civil Works Roads
Opening Date9 Jul 2020
Closing Date17 Jul 2020
Tender Amount₹ 13,01,393 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

830

6640

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

420

3360

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

1230

9840

-

... More
No. of corrections______only.

-

-

-

... More
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes, shurbs, saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoRT & H Clause 201 of Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

2150

17200

-

... More
Providing B.T. Patchwork for pot holes using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100 grade Bitumen including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes with mix duly tamping to fill up all corners , tamping and compacting with 8t to 10t road roller and finishing including cost of all materials, T&P, and labolur charges for all operations etc. complete, for finished item of work as directed by Engineer-In - charge

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

25

101775

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

20.5

83763

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

5

20580

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

12

48468

-

... More
No. of corrections______only.

-

-

-

... More
Providing B.T. Patchwork for pot holes using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100 grade Bitumen including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes with mix duly tamping to fill up all corners , tamping and compacting with 8t to 10t road roller and finishing including cost of all materials, T&P, and labolur charges for all operations etc. complete, for finished item of work as directed by Engineer-In - charge

-

-

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

14

57022

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

17

69479

-

... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost of all materials and including premixing the material with water at FMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Power Roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th Revision) for finished item of work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

28

52920

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

18

34344

-

... More
No. of corrections______only.

-

-

-

... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost of all materials and including premixing the material with water at FMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and compacting with Power Roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th Revision) for finished item of work.

-

-

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

3.5

6786

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

4

7424

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

5

9450

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

13

24804

-

... More
No. of corrections______only.

-

-

-

... More
Providing 20mm thick Open Graded Bituminous Premix Carpet using 0.018 cum. of 13.2 mm and 0.009 cum of 11.2 mm IRC size HBG machine crushed granite chips for 10 sqm. premixed with bitumen of 80/100 grade at the rate of 14.60 Kgs. Per 10 sqm. laid over a tack coat of 2.25 Kgs./10 sqm. of bitumen using a total quantity of 16.85 Kgs. of bitumen per 10 sqm. including cost and conveyance of materials to site with all leads and lifts and stacking the metal to departmental gauge for premeasurements and labour charges for cleaning, brushing the road surface and mechanically heating the bitumen and aggregate to proper temperature and mixing the bitumen and aggregate in mini hot mix plant of 6 to 10 Tonne capacity including the cost of laying the tack coat and spreading the premix to proper camber, consolidation with 8 to 10 Tonne power road roller including all labour charges, hire and operational charges of all T&P, barricading, diversion of traffic, providing caution boards and banner flags during day time and danger lights during night times etc., complete for 10 sqm. as per MOST Specification No.503 operation only 509 as directed by the Engineer-in-Charge of the work

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

510

68850

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

410

55350

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

78

10608

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

98

13132

-

... More
No. of corrections______only.

-

-

-

... More
Providing B.T. seal coat(simultaneously) over the newly laid O.G.P.C. using 0.009 cum. of 6.7mm IRC size HBG machine crushed chips premixed with 0.980 Kgs. of bitumen 80/100 grade of suitable grade per 1 sqm. of road surface rolling with 8-10 power road roller and labour charges including hire and operational charges of all T & P and including cost and conveyance of 6.7mm chips to road side with all leads and lifts and stacking to departmental gauge for premeasurements and cost and conveyance of bitumen to work site including barricading diversion of traffic providing caution boards and bannger flags during day time and danger lights during night times etc. complete as per MOST Specification No.513 & 503 operation only as directed by the Engineer-in-Charge

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

510

27030

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

410

21730

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

78

4212

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

98

5194

-

... More
No. of corrections______only.

-

-

-

... More
Providing BT Patch work for Pot holes of depth ranging from 15 to 25mm using 10-12mm HBG chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting and finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete.

-

-

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

220

22440

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

450

45900

-

... More
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders and making-up loss of material / irregularities on the shoulder designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer-in-Charge of the work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

1700

22100

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

1000

13000

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

250

3250

-

... More
No. of corrections______only.

-

-

-

... More
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders and making-up loss of material / irregularities on the shoulder designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer-in-Charge of the work.

-

-

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

270

3510

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

700

9100

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

850

11050

-

... More
Making up loss of materials / irregularities as the shoulders to design level by adding fresh approved soil and compacting with appropriate equipment as per MORTH Specification No.3003.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

1400

43400

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

1000

31000

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

200

6200

-

... More
No. of corrections______only.

-

-

-

... More
Making up loss of materials / irregularities as the shoulders to design level by adding fresh approved soil and compacting with appropriate equipment as per MORTH Specification No.3003.

-

-

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

250

7750

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

300

9300

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

800

24800

-

... More
Painting of KM / HM Stones/ and Village Name boards with Single Coat using 1st quality of ready mixed synthetic enamel paint of approved colour and brand to give even shade after thoroughly brushing to remove all dirty including cost, conveyance of all materials to site, cost of synthetic enamel paint, brushes, labour charges for all operations such as painting single coat and all other incidental charges etc., complete as directed by the Engineer-in-Charge of the work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

25

1300

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

25

1300

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

6

312

-

... More
No. of corrections______only.

-

-

-

... More
Painting of KM / HM Stones/ and Village Name boards with Single Coat using 1st quality of ready mixed synthetic enamel paint of approved colour and brand to give even shade after thoroughly brushing to remove all dirty including cost, conveyance of all materials to site, cost of synthetic enamel paint, brushes, labour charges for all operations such as painting single coat and all other incidental charges etc., complete as directed by the Engineer-in-Charge of the work.

-

-

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

3

156

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

8

416

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

20

1040

-

... More
Painting letters of KM / HM Stones with ready mixed synthetic enamel paint of Ist quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operations etc. complete for finished item of work as directed by the Engineer-in-charge of the work (R&B) on roads upto size of (5 to 8 cm).

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

50

300

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

50

300

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

10

60

-

... More
No. of corrections______only.

-

-

-

... More
Painting letters of KM / HM Stones with ready mixed synthetic enamel paint of Ist quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operations etc. complete for finished item of work as directed by the Engineer-in-charge of the work (R&B) on roads upto size of (5 to 8 cm).

-

-

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

5

30

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

24

144

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

45

270

-

... More
Painting letters of KM / HM Stones with ready mixed synthetic enamel paint of Ist quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operations etc. complete for finished item of work as directed by the Engineer-in-charge of the work (R&B) on roads upto size of (8 to 10 cm).

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

400

2800

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

450

3150

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

50

350

-

... More
No. of corrections______only.

-

-

-

... More
Painting letters of KM / HM Stones with ready mixed synthetic enamel paint of Ist quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operations etc. complete for finished item of work as directed by the Engineer-in-charge of the work (R&B) on roads upto size of (8 to 10 cm).

-

-

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

20

140

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

75

525

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

290

2030

-

... More
White Washing with White Cement Single Coat including cost of White Cement, Brushes, Conveyance of all Materials to Site, Labour Charges for all operations such as Painting and all incidental charges for finished item of work as directed by the Engineer-in-Charge of the work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

200

3600

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

190

3420

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

50

900

-

... More
No. of corrections______only.

-

-

-

... More
White Washing with White Cement Single Coat including cost of White Cement, Brushes, Conveyance of all Materials to Site, Labour Charges for all operations such as Painting and all incidental charges for finished item of work as directed by the Engineer-in-Charge of the work of Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

200

3600

-

... More
Random Rubble Stone masonry in CM (1:6) prop: (cement : sand) using using hard rough stone other than granite from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., complete for finished item of work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

12

30420

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

7

18718

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

4

10400

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

6

15834

-

... More
No. of corrections______only.

-

-

-

... More
Plastering with CM (1:5) 20 mm thick including cost, conveyance of all materials to site and including cost of cement and labour charges for all operations such as mixing mortar, scaffolding, laying, neat finishing, curing etc., for Plastering over brick work and all water leads and all other incidental charges etc., complete for finished item of work as directed by the Engineer-in-Charge of the work.

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

40

12520

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

28

8764

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

15

4680

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

21

6573

-

... More
No. of corrections______only.

-

-

-

... More
Manufacture Supply and fixing of HM Stones of Standard Size and Specification including cost and conveyance of all materials to manufacturers site fabrication of steel, recasting stones with M-15 Grade concrete using graded metal and chips and painting two coats on concrete surface and lettering on HM posts average 5 letters of 10 cm. height each including labour charges for all operations such as digging pits at corresponding lead watering till set for curing, neat finishing and cost of all hire and operational charges of concrete mixers, generator and tractor with tralley and all other incidental charges etc., complete as directed by the Engineer-in-Charge of the work

-

-

-

... More
Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

18

10170

-

... More
MES Water works to Sabbavaram Road from Km.0/0 to 11/100

8

4528

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

7

3955

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

9

5094

-

... More
Engaging Special Labour for clearing vents / debris in CD works and Drains etc., and also removal of wind fallen trees / tree trunks on the road margins during rainy season as directed by the Engineer-in-Charge of the work of Asakapalli - Aganampudi Road from Km.0/0 to 11/0 & 12/0 to 14/300

16

6720

-

... More
Engaging Special Labour for clearing vents / debris in CD works and Drains etc., and also removal of wind fallen trees / tree trunks on the road margins during rainy season as directed by the Engineer-in-Charge of the work of MES Water works to Sabbavaram Road from Km.0/0 to 11/100

11

4620

-

... More
No. of corrections______only.

-

-

-

... More
Engaging Special Labour for clearing vents / debris in CD works and Drains etc., and also removal of wind fallen trees / tree trunks on the road margins during rainy season as directed by the Engineer-in-Charge of the work

-

-

-

... More
B.N. Road to Pedagadi (via) Rampuram from Km.0/0 to 2/250

2

840

-

... More
N.H.5 to VEPZ Road from Km.0/0 to 2/900

3

1260

-

... More
Sabavaram - Gorlivanipalem to Vangali Road from Km.0/0 to 5/250

5

2100

-

... More
Sabbavaram - Venkannapalem to Pedagollalapalem (via) Gorlivanipalem, Pedanaidupalem, Amruthapuram to Asakpalli - Aganampudi Road from Km.0/0 to 8/800

9

3780

-

... More
No. of corrections______only.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.