Roads And Buildings Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Roads And Buildings Department Tender
Opening Date16 Jun 2021
Closing Date30 Jun 2021
Tender Amount₹ 8,03,368 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
414283Bid Award Id
ViewTender No
NIT No.12/TO/DB/EE/(R&B)/TKL/2021-22, dt: 08-06-2021Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
bill of quantities;Making up loss of materials/irrigularities as the shoulders to design level by adding fresh approved soil and compacting with appropriate equipment as per MORTH specification No 3003 .
573
-
19425
bill of quantities;Providing gravel berms with best gravel to irrespective of thickness in layers including cost, conveyance and including labour charges for all operations such as spreading gravel in layers, all water leads, watering and rolling with hand roller and all incidental charges etc., complete as directed by the Engineer - in - charge of the work.
220
-
56870
bill of quantities;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
35
-
69965
bill of quantities;Providing BT Patch work for Pot holes of depth ranging from 70mm and above using 40mm HBG metal with arequired quantity of 10/12 mm HBG M/C key chips and 80/100 Grade Bitumen at 42 Kgs per 1Cum of work for filling the pot holes and ceiling the filled up pot hole with 15c thick layer using 10-12mm HBG chips and 80/100 grade Bituen at 72kg 1cu including reoval of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete
195
-
71292
bill of quantities;Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete
116
-
23548
bill of quantities;Providing and applying prime coat with bitumen Emulsion (SS1) (Bulk) using Emulsion pressure distributor at the rate of 0.70 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-Charge.
860
-
31992
bill of quantities;Providing and applying tack coat with bitumen Emulsion (RS1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
1940
-
19982
bill of quantities;Providing , laying of close graded premix surfacing material ( Mixed seal surfacing) of 20 mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2 mm to 0.09 mm (Type 'B') as per table 500-26 of specification 508 of MoRT&H (4th Revision), premixed with bituminous binder VG-30 grade @ 19.00 Kg per 10 Sqm area, including cost of all materials and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRT&H (5th Revision) Specification No. 512 complete for finished item of work in all respects as directed by Engineer-in-charge.
1940
-
296820
bill of quantities;Brick Masonary in CM (1:6) mix using 2nd class of size 23x 11x7 cm Bricks having 35 Kg/Cm2 strength including cost and conveyance of all materials to site from approved source and including labour charges for all operations such as mixing mortor, construction of Masonary to propoer bonding reacking out of excess mortor neat finishing scaffolding and including of all water leads and watering till set for curring etc., complete for finished item of work as directed by the Departmentla Officer incharge of work
8
-
40960
bill of quantities;Plastering with C.M. (1:5) 12 mm thick including cost seigniorage and conveyance of all materials to site and including cost of cement and labour charges for all operations such as mixing mortor, curing scaffolding etc., for Plastering over brick work and all water leads for curing & watering still for curing & complete as directed by Departmental Officer incharge of work.
90
-
8847
bill of quantities;White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge
285
-
5700
bill of quantities;Painting to KM/HM stones with single coat using 1st quality of ready mixed synthetic enamel paint of approved colour and brand to given shade after throughly brushing to removal all dirty including cost and conveyance of all materials to site and cost of brushes and labour for all operations such as painting single coat and all other incidental charges etc complete for finished item of work as directed by the Engineer in charge of the work in the following (R&B) roads.
90
-
4932
bill of quantities;Painting letters to KM/HM stones with ready mixed synthetic enamel paint of 1st quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operationsetc complete for finished item of work as directed by the Engineer in charge of the work in the following (R&B) roads.( 5 to 8 cm)
550
-
3355
bill of quantities;Painting letters to KM/HM stones with ready mixed synthetic enamel paint of 1st quality of approved brand and shade including cost and conveyance of paint brushes and all other materials required to site of work and labour charges for all operationsetc complete for finished item of work as directed by the Engineer in charge of the work in the following (R&B) roads.(8 to 10 cm)
525
-
3990
bill of quantities;Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc.,
38
-
17480
bill of quantities;Provision for JCB for clearing of Debries and jungle urgent works etc.,
33
-
28050
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements