To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Construction Material
Eprocure
Opening Date11 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 2,04,56,269
Costs
EMD
₹ 4,10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nit No.193/2024-25, Dt.03.03.2025 Of The Engineer-in-chief, Panchayatraj, Vijayawada.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ENCPR_139868_1Bid Award Id
ViewTender No
NIT No.193/2024-25, Dt.03.03.2025 of the Engineer-in-Chief, Panchayatraj, Vijayawada.Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://pmgsytenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - for Abutments & Wing walls.
192.5
6900
1328250
... More
Construction of one vent 1000 mm dia. Pipe Culverts - 6 No.s (0/770, 1/270, 1/720, 1/930, 2/530, 2/770)
-
-
-
... More
Construction of 6 m span RCC Slab culvert- 1 No.
-
-
-
... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete (precast) for 200 M Stone
13
799
10387
... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST, etc., complete.
8
226
1808
... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded, including Overhead charges & Contractor's profit but excluding GST, etc., complete - For Sub Structures.
0.5
77070
38535
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - 1000mm dia RCC NP3 Pipes(P/E) - For Pipe Culverts.
37.5
9790
367125
... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, Overhead charges & Contractor's profit but excluding GST etc., complete for finished item of work.
32.4
560
18144
... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete (precast) for Ordinary KM Stone
3
2830
8490
... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,, including Overhead charges & Contractor's profit but excluding GST, etc., complete.
10875
14
153337.5
... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including Overhead charges& Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
14.5
1760
25520
... More
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.15 of MORD using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant by manual means, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 507 MORD'2014, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
10875
232
2523000
... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
15000
96
1440000
... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including Overhead charges& Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
15
1760
26400
... More
Construction of five vents 1000 mm dia. Pipe Culvert - 1 No. (0/170)
-
-
-
... More
Providing & fixing of typical PMGSY LOGO Board as per MORD secifications and drawing consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC fixed over Alluminium Composite Material of 4mm thickness fixed on a 25x25x5mm size MS frame alround edges and 25mmx5mm size Ms flats in middle duly welding the top and bottom plates 1 No of 75x75 x6mm MS Square hallow section post of 2.95 m height welded with 200x200x5mmthick MS base plate of at bottom duly embedded in CC M 20 grade block of 450x450x600mm, 600mm below ground level including lettering, colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges, Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete for finished item of work. - Logo board with every 2 Km .
3
5790
17370
... More
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
40
767
30680
... More
Providing and erecting direction and place identification retro-refectorised sign as per MoRD specifications and drawings made of encapsulated lens type refective type sheeting as per IRC 67 fixed over aluiminium sheeting,4mm thick with area not exceeding 0.90 sqm board fixed on 25x25x5mm size MS frame alround and 25mm x5mm size MS flat in the middle supported on 75x75 x6mm MS angle section posts welded with 50x50x5 mm MS hold fast at bottom, firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges, Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete for finished item of work.
4
3650
14600
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For Foundations
261.5
122
31903
... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For levelling course.
18
6230
112140
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD, including Overhead charges & Contractor's profit but excluding GST, etc., complete.
8120
2
19894
... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing Consisting of Three boards made of encapsulated lens type Retro reflective sheeting as per IRC 67 fixed over Alluminium Composite Material of 4mm thickness fixed on a frame of 25x25x5mm MS angle alround edges and MS flats 25x5mm in the middle duly welding he lower plate and middle plate to 2 nos of verticle posts 75x75 x6mm MS square hallow section of 2.80m length welded with 200x200x5mm thick MS base plate at bottom duly embedded in CC M20 grade blocks of 450x450x600mm, 600mm below ground level and the top most diamond plate welded to middle plate by 47x47 X6mms MS square hallow section tube duly supported by 47x47x6mm MS square tube in between two vertical posts including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheetwith primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges, Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete for finished item of work.
1
13380
13380
... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For levelling course.
28.5
6230
177555
... More
Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 & 407 MORD, by using machinery, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
1088
457
497216
... More
Reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - for Raft.
69.5
8070
560865
... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH, including Overheads & Contractor's profit but excluding GST and Seigniorage charges, etc., complete up to 5m height. - For Super Structure (Deck slab)
24.5
9630
235935
... More
Providing and fixing of Citizen information board as per MoRD specifications and drawings consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC 67 fixed over Alluminium Composite Material of 4mm thickness and 900/750mm size fixed on a frame of 25x25x5mm thick MS angle alround edges and 25x5mm thick MS flats in the middle welded to 75 x 5 mm size MS Flat plates on back and welded to 75x75x6mm MS square hallow sections of length 3.05m welded with 300x300x5mm MS Base plate at bottom duly embedded in cement concrete M20 grade of size 600x600x750 mm, 750mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges, Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete for finished item of work.
1
18270
18270
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - 1000mm dia RCC NP3 Pipes(P/E) - For Pipe Culverts.
45
9790
440550
... More
Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM), including Overhead charges & Contractor's profit but excluding GST, etc., complete.
10875
41
453487.5
... More
Road Part
-
-
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For Foundations.
65
122
7930
... More
Construction of Cement treated Gravel Sub base using 4.00 per cent quantity of cement by weight of soil (percentage of cement will vary by Design Mix) and by Providing, laying and spreading well graded meterial (i.e 9.5 mm to 4.75 mm size Gravel of 66% and crusher dust of size 2.36mm @ 34%) having LL 45, PI 20 & Uniformty coefficient (Cu) 5 on a prepared sub-grade, pulverising, adding the designed quantity of cement to the spread soil, mix shall be designed for a minimum laboratory 7 days unconfined compressive strength of not less than 1.7 MPa (17 Kg/cm2) for sub-base and mixing in place with rotavator, grading with the tractor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base as per MORD Technical Specification Clause 404, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
1276
1860
2373360
... More
Road Furniture
-
-
-
... More
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
1000
229
229000
... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - for Head walls of pipe culverts.
115
6530
750950
... More
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete
4
8400
33600
... More
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, Overhead charges & Contractor's profit but excluding GST etc., complete for finished item of work.
16
3514
56224
... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - for Head walls of pipe culverts.
150.5
6530
982765
... More
Package No.AP19PVT127-L052-Road from Kondru Road to Tulam in Pedabayalu Mandal of Alluri Sitharama Raju District
-
-
-
... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - for Cut off walls and Toe walls.
107.5
6270
674025
... More
Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH, including Overhead charges & Contractor's profit but excluding GST, etc., complete.
2000
551
1102000
... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges, Overhead charges & Contractor's profit but excluding GST etc., complete for finished item of work.
72
336
24192
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For Protection Work.
42
1250
52500
... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in foundation complete as per drawings and technical specification Clauses 1000 & 1202 MORD / Sections 1100 & 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded, including Overhead charges & Contractor's profit but excluding GST, etc., complete - For Foundation.
5.5
76800
422400
... More
Supplying, fitting, and placing HYSD bar reinforcement (Fe 500) in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including Overhead charges & Contractor's profit but excluding GST, etc., complete - For Super Structures.
2
78950
157900
... More
Construction of Cement treated Granular Base using 4.00 per cent quantity of cement by weight of soil (percentage of cement will vary by Design Mix) and by Providing, laying and spreading well graded material (Table 400.4 of MoRTH) having LL 45, PI 20 & Uniformty coefficient (Cu) 5 on a prepared sub grade, adding the designed quantity of cement to the spread Material, the mix shall be designed for a minimum laboratory 7 days unconfined compressive strength of not less than 3.00 MPa (30 Kg/cm2) for base course and mixing in place with rotavator, grading with the tractor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base, as per MORTH Specification 403, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete.
1088
4450
4841600
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For Foundations
129
122
15738
... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete - For levelling course.
14.5
6230
90335
... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign boards as per MoRD specifications and drawings made of encapsulated lens type reflective sheeting as per IRC:67 fixed over aluminium sheeting 4 mm thick fixed on 25x25x5mm size MS angles alround and 25mm x5mm size MS flats in middle supported on 75x75 x6mm MS angle section post welded with 50x50x5 mm MS angle hold fast at bottom firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges, Overhead charges & Contractor's profit but excluding GST and Seigniorage charges, etc., complete for finished item of work - at Speed breakers near Junctions, T Boards at Junctions, Prohibited boards at junctions (triangle of size 600 X 600mm size).
4
2850
11400