Panchayat Raj Engineering Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Panchayat Raj Engineering Department Tender
Civil And Construction
Water Storage And Supply
Opening Date1 Apr 2025
Closing Soon10 Apr 2025
Tender Amount₹ 5,30,037
Costs
EMD
₹ 5,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
796958Tender No
105/2024-25/Executive Engineer RWSS Division Paderu Dt.07.03.2025Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply, delivery, installation and commissioning of Submercible Pump sets(open well) with 55LPM and head 98.82m(3HP) 25 stage at Sump and suitable to Borewell And Pump set with 55LPM and head 98.8 m(3HP) at bore wellswith motor Single phase 2880 RPM, 415 volts of reputed make with minimum overall efficiency of 40% at the duty point with radial/mised flow with non-return valve including cost, conveynce of motor, pump set, panel board with necessary equipment along with required length of GI pipe medium class (B class) ISI marked, reputed make with "C" class couplings, bends, flanges etc with required lenght of 3 core PVC sheathed flat cable, required lenth of 7/18 copper wire and instailation and errection of all materials and all labour charges fixing as per the direction of the department officers etc. complete, including all required accessories but excluidng CED/GST etc complete.
1
22365
57915
... More
Construction of pipeline for water supply with 63mm dia, 6kg/cm2 HDPE PE-100 grade Pipes as per IS: 4984-1995 with its ammendments and revisions thereon including cost and supply of pipes, lowering, laying and jointing of Pipe lines true to alignment and gradient, trench excavation manually for pipe lines in all types of soils and refilling trenches with excavated earth except rock requiring blasting (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work, filling pipeline with water and testing to hydraulic field test pressure including all labour charges laying and jointing as per the directions of the departmental officers and as per the technical specifications of 17 (Part-B of Vol-I) but excluding GST and CED for finished item of pipeline' 63 mm dia HDPE 6 Kg/sqcm ((manually) Pumping Main
250
400
100050
... More
Construction of pipeline for water supply with 63mm dia, 6kg/cm2 HDPE PE-100 grade Pipes as per IS: 4984-1995 with its ammendments and revisions thereon including cost and supply of pipes, lowering, laying and jointing of Pipe lines true to alignment and gradient, trench excavation manually for pipe lines in all types of soils and refilling trenches with excavated earth except rock requiring blasting (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work, filling pipeline with water and testing to hydraulic field test pressure including all labour charges laying and jointing as per the directions of the departmental officers and as per the technical specifications of 17 (Part-B of Vol-I) but excluding GST and CED for finished item of pipeline' 63 mm dia HDPE 6 Kg/sqcm ((manually) for Distribution.
250
400
100050
... More
Construction of Functional House Hold Tap Connections (FHTC) with PP Clamp Saddle ,Non return cum Flow control valve of 15 mm dia designed for 5 LPM discharge @0.5 bar pressure loss,Compression male/female threaded,cost and supply of 20 mm dia HDPE 16.0 Kg/cm2 (for a length of 3.0 Mts)with laying,jointing,trench excavation up to 0.5 Mts depth including testing,refilling,cost & supply of 15 mm dia GI pipe Medium grade ( for a length of 1.40 Mts) with necessary fittings,supply&fixing of 12.7 mm brass bib cock(long body) indian make heavy duty for finished item of work including cost,conveyance of all materials,labour charges etc with relevent IS codes,by using with food grade material suitable for usage in drinking water system to the extent of departmental satisfaction including Over heads and Contractor Profit@13.615% but excluding GST and Seignorage charges.
24
1591
38184
... More
Construction of Fhtcs Pedastal with CC(1:2:4) proper Mix Using mm HBG metal including C/C of all materials and labour charges etc.completed
24
1310
31440
... More
Construction of Name board mentioning all purticularss of the work with sub works Earth work in exacavation for foundation with CC(1:4:8),super structure with brick masonary in CM(1:6),plastering withCM(1:5) mix of 12 mm thick painting and lettering with acrylic emulsion including cost and conveyance of all materials and labour charges but excluding all taxes and seigniorages charges but including overheads and contractor profit 13.615%
1
6702
6702
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%