To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Panchayat Raj Engineering Department Tender

Works
Eprocure
Opening Date24 Feb 2021
Closing Date18 Mar 2021
Tender AmountRefer Documents 
Notes
Download

Summary

569/2020-21 Dt.15.02.2021 Of The Enc, Pr, Pmgsy, Vijayawada

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per Technical Specification Clause 501.2.2 of MORD including contractors profit & Over head charges, but excluding GST etc., complete.

14673.75

-

7.7

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.9 of MORD including contractors profit & Over head charges, but excluding GST etc., complete

8240

-

26.7

... More
Construction of improved subgrade by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

900

-

266.7

... More
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

969.5

-

948.7

... More
Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

2067.63

-

266.7

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2449.24

-

1668.3

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat

18360

-

35.5

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat

18360

-

13.2

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.9) either using viscous grade bitumen VG30 grade at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying and rolling with a three wheel 0-100 kN static roller capacity, paver finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 506 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

14928.75

-

132.4

... More
Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading of quality requirement as defined in table 500.3 of MORD with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by manual means with the bitumunous binder using 6.50 kgs of bitumen VG 30 grade for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 508 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for seal coat.

14928.75

-

49.2

... More
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Technical specification clause 507 of MORD using tailor made cold mix Binder to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification IRC, SP:100-2014 including contractors profit & Over head charges but excluding GST and Seigneorage etc., complete

3431.25

-

200.5

... More
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For 170mm thick with 3.25m joint spacing.

790.18

-

5038.1

... More
Road Furniture

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 5th KM Stone

1

-

3132.5

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for Ordinary KM Stone

5

-

1800.4

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for 200M Stone

24

-

545.3

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three Alluminium Composite Material as per Drawings, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

2

-

10316

... More
Providing and fixing of Citizen information board as per MoRD specifications and drawings. The board will be a composite unit consisting of 2 MS plates of 1.6 mm (16SWG) thickness and size of 900 x 750 mm welded over welded MS Flat iron plates 50 x 5 mm size on back and welded to 75 mm 3.65 mm thick (B class) steel tube frame of height 3.05m as per the drawing and painted colour, lettering, colour, band, diagrams, specifications. the 75mm dia steel tubes welded with 50 x 50x 6mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 600x600x750 mm, 600mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit, but excluding GST, Seigniorage etc., complete

2

-

12823.1

... More
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three Alluminium Composite Material , top and Bottom plate duly Revited with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 1 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate and Bottom Plate will be made with 25mmX25mmX5mm MS Angles and welded MS tube tube. All MS painted Epoxy on Both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 of MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., completeLogo board @ every 2 km

3

-

3173.75

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign at curves as per IRC:67 3 nos mounted on single pole of 100x100x6 mm MS angle 5.00 Mts long and made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 100 mmx100 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx900 mm, 900mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.@ Curves

26

-

4270.3

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.at Speed breakers near Junctions, (triangle of 600 X 600mm)T Boards at junctions (triangle of size 600 X 600mm size)Prohibited boards at junctions (triangle of size 600 X 600mm size)

22

-

1808.13

... More
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 75mmx75 mm x6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx600 mm,600 mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.Stop boards at junctions (900 mm side octogen)

8

-

2283.57

... More
Providing and erecting direction and place identification retro-refectorised sign as per IRC:67 made of encapsulated lens type refective type sheeting vide clause 1701.2.3 MORD fixed over aluiminium sheeting,2 mm thick with area not exceeding 0.90 sqm supported on mild steel iron posts 75x75x6 mm firmly fixed to ground by means of propoerly designed foundation with M15 grade cement concrete 450x450x600 mm,600 mm below groubd level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.

10

-

2669.49

... More
Providing and fixing of Maintenance information board as per IRC:67 made of type Retro reflective sheeting vide Clause 1701.2.3 MORD / 801.3 MORTH fixed over Alluminium Composite Material of 4mm thickness and size of 900 x 1500 mm on a frame made up of 25X25X6mm thick MS angles and 25x 5mm MS Flats and welded to welded MS flat Iron plates 50 x 5 mm size on back and welded to 75 mm x 75mm x6mm MS hallow squar tube frame of height 3.00m as per the drawing and painted with ready mixed synthetic enamel paint of superior quality in required shade and colour, lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications.The 75mm dia steel tubes welded with 50 x 50x 6 mm angle iron hold fasts of 225 mm long at bottom and painted with primer and two coats of epoxy paint and embedded in to cement concrete M15 grade of size 600 x 600 x 750 mm, 600 mm below ground level as per MoRD specifications clause 1701 including over head charges & contractors profit but excluding GST & Seigniorage charges etc., complete.

1

-

12637.3

... More
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997

452

-

549

... More
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,

249.6

-

258

... More
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

262

-

522.8

... More
Constuction of single row 600 mm Dia pipe culverts (7 Nos @0/074,0/30,0/353,0/456,0/550,0/682,3/230 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

150.78

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

28.7

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

27.09

-

3285.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

88.48

-

3618.2

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 600mm dia NP3 Pipes

70

-

2678.2

... More
Constuction of single row 1000 mm dia ( 3 No @1/930,5/300 and 5/610 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

114.75

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

15.48

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

17.16

-

3285.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

65.64

-

3618.2

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts with 1000mm dia NP3 pipes

30

-

6718.8

... More
Constuction of Sluice (1 No. @4/620 km) Construction of 1 vent 1 m span RCC slab culvert (5 Nos @0/241,1/1385,3/540,3/630,5/756 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

193.1

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.

29

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

57.95

-

3285.2

... More
Plain cement concrete M 15 grade (Design Mix) using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage charges etc., complete-

57.95

-

3618.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

135.95

-

3827

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) Bed blocks

14.85

-

5211.5

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

15.35

-

5670.4

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

2

-

59054.4

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

2

-

60491.1

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

70

-

191

... More
Construction of 1 Vent 1.5 m span RCC slab culvert (1 No @3/330 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

156.26

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete.

16.42

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

16.42

-

3285.2

... More
Plain cement concrete M 15 grade (Design Mix) using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage charges etc., complete-

85.52

-

3618.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

51.22

-

3827

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

4.48

-

5211.5

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

4.41

-

5670.4

... More
Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

4.8

-

541.2

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.6

-

59054.4

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

0.8

-

60491.1

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

34

-

191

... More
Construction of 1 Vent 2.0 m span RCC slab culvert (2 No @4/355,5/410 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

312.52

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete.

32.9

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

32.9

-

3285.2

... More
Plain cement concrete M 15 grade (Design Mix) using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage charges etc., complete-

171.48

-

3618.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

102.76

-

3827

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

9.44

-

5211.5

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

12.48

-

5670.4

... More
Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

9.6

-

541.2

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

1.2

-

59054.4

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

1.6

-

60491.1

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

34

-

191

... More
Construction of 1 Vent 3 m span RCC slab culvert (1No @ 3/130 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

205.09

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete.

21.59

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

22.33

-

3285.2

... More
Plain cement concrete M 15 grade (Design Mix) using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage charges etc., complete-

107.03

-

3618.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

115.86

-

3827

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)

5.2

-

5211.5

... More
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)

10.8

-

5670.4

... More
Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete

6

-

541.2

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures

0.7

-

59054.4

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures

1.6

-

60491.1

... More
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete

50

-

191

... More
Construction of CC Drain

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations

486

-

94.1

... More
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges and Seigneorage etc., complete.

43.2

-

792.9

... More
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course

54

-

3285.2

... More
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-

222.75

-

3618.2

... More
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in Foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for cover slabs

61.2

-

4915.4

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1001 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Foundation

7.34

-

58846.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.