National Aluminium Company Limited Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
National Aluminium Company Limited - NALCO Tender
Eprocure
Opening Date25 Jul 2020
Closing Date15 Aug 2020
Tender Amount₹ 7,60,555 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Amc Of 33kv Switch Yards In Port Facilities And 11 Kv Switch Yards And Electrics In Transit House
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NALCO_573369_1Bid Award Id
ViewTender No
NALCO/PF/e-TENDER/82/74/4699Tender Authority
National Aluminium Company Limited ViewPurchaser Address
-Website
http://https://nalcoindia.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
AMC OF 33KV SWITCH YARDS IN PORT FACILITIES AND 11 KV SWITCH YARDS AND ELECTRICS IN TRANSIT HOUSE
AMC OF 33KV SWITCH YARDS IN PORT FACILITIES AND 11 KV SWITCH YARDS AND ELECTRICS IN TRANSIT HOUSE
BOQ Items
... More
c. 2X40W 4ft LED Lamp Fittings
32
-
-
... More
d. 1X20W LED Lamp Fittings
28
-
-
... More
e. 1X24W LED Lamp Fittings
84
-
-
... More
f. 1X15W LED Lamp Fittings
204
-
-
... More
g. 1X9W LED Lamp Fittings
142
-
-
... More
h. 1X10W 2ft LED Lamp Fittings
40
-
-
... More
i.1X5W 1ft LED Lamp Fittings
120
-
-
... More
j. 1X70W Gate Post lamps
8
-
-
... More
k.1X 150W lamp Fittings
12
-
-
... More
l. Bulkhead fittings NXC11 GLS lamp
12
-
-
... More
m.Modular type buzzers
58
-
-
... More
A1.2 TECHNICAL CLEANING Activities: To be carried out Once in every 02 months.
(i) Thorough Cleaning of all light fixtures & fans.
(ii) Thorough Cleaning of all switch boards/panels/MDBs/LDBs.
[Refer A1 .2 of Scope of Work for details]
-
-
-
... More
a. All Light fixtures & fans
6252
-
-
... More
b.All Switch boards/ Power points/Panels/MDBs/LDBs etc
3840
-
-
... More
A1.3 100 KVA DG Set Activities:
i) Regular Cleaning (internal and External),Regular Checking of fuel Level, Topping up of Diesel DG Fuel Tank whenever required (Fuel will be supplied by NALCO free of cost)
(ii) Daily trial-run for minimum of 30 minutes.
(iii) Operation during power failures from APEPDCL, Normalisation of TH loads with DG Power during power failure & vice versa after resumption of power supply.
(iv) Liaisoning with APEPDCL, when required, for restoration of power supply or repair of breakdowns. [Refer A1 .3 of Scope of Work for details]
2
-
-
... More
A1.4 Water Pump MOTORS and DOL STARTERS (Once in 04 Months) Activities:
(i) Cleaning of Motors, terminals and starters , checking the components, tightening of connections, servicing of push buttons.
(ii) Replacement of DOL Starters if necessary (Starters will be supplied by NALCO free of cost)
[Refer A1.4 of Scope of Work for details]
6
-
-
... More
A2.1 11KV Switch Yard, Transformer ,LT Panel( In TRANSIT HOUSE) : Maintenance Frequency Once in 04 months. Activities: A. 11KV Structure:- (i) Taking shutdown/LC from APEPDCL. (ii) Cleaning of all insulators, LAs, AB S/W, Earth S/W, JB, Etc. Replacement of defective parts/components like insulators, terminations, clamps, conductors, etc. (iii) Checking the operation of AB S/W, setting the alignment, application of petroleum jelly to electrical contacts & grease to all moving parts (iv) Replacement of defective nuts, bolts, washers, cable lugs etc & ensuring the tightness of all terminations. (v) Checking of HG Fuse set & replacement of fuse wire during every maintenance. B. 11KV/0.433Volts, 250KVA Transformer: (i) Cleaning of the Transformer & Replacement of silica gel. (ii) Checking/ arresting Oil leaks. (iii) Checking/tightening all the Primary & secondary terminations, neutral & body earthing. (iv) Names/Numbers to be rewritten every year. C. LT Panel: (i) Cleaning of panel internally & externally & Checking/tightening all terminations. (ii) Checking & replacing all defective components like MCCB, Voltmeters, ammeters, indication lamps, etc. (LED Indication lamps, nuts, bolts, screws , washers, lugs, small piece wires upto 5 Mtrs, all consumables shall be in party’s scope). (iii) Cleaning of entire switch yard after completion of total work. [Refer A 2.1 of scope of Work for details]
6
-
-
... More
A2.2 Painting of 11KV Structure (Once during the contract Period) [Refer A. 2.2 of scope of Work for details]
1
-
-
... More
A2.3 Painting of Transformer & LT Panel (Once during the contract Period)
[Refer A 2.3 of scope of Work for details]
2
-
-
... More
A3.1 Servicing of 1-ph, 230V Ceiling/Exhaust fans (To be serviced once during the 2 years of contract) (i) Dismantling of fan from its position. (ii) Cleaning of fan assembely with brush & petrol, etc, applying grease to bearings, replacement of bearings if found defective, cleaning, heating & applying varnish to improve insulation, heating & drying (iii) Reassembling the fan completely & testing the fan for smooth running (vi) Ensuring proper earthing & neutral connections & proper tightness of fan fixing to hook . [Refer A 3.1 of Scope of Work for details]
-
-
-
... More
a) Exhaust fans 300mm sweep
33
-
-
... More
b) Ceiling fans 1200mm sweep
70
-
-
... More
A3.2 SERVICING OF PUMP & MOTORS (To be serviced once in a year & twice during the 2 years of contract)
Activities:
(i) Dismantling of Pump Motor from its position
(ii) Thorough Cleaning of Motor & Pump.
(iii) Servicing of pump & motor by opening the assemblies, applying grease to bearings & replacement of bearings by new if required. .
(iv) Cleaning, heating & applying varnish to improve insulation.
(v) Reassembling the pump & motor completely & testing for smooth running
(vi) Painting of motors & pump
(vii) Checking & ensuring proper earthing, neutral connections & the proper tightness of foundation nuts/bolts.
(viii) Replacement of pump gaskets by new.
[Refer A 3.2 of Scope of Work for details]
-
-
-
... More
a) Servicing of Pump & Motor (3-Ph, 415V, 2.2KW)
2
-
-
... More
b) Servicing of Pump & Motor (1-Ph, 230V, 1.1KW)
2
-
-
... More
A4. LT PANELS (Once in 04 Months)
Activities:
(i) Cleaning of Panels externally & internally.
(ii) Checking of all terminations & making good if found defect in terminations.
(iii) Checking of MCCBs, MCBs, Isolators & replacement if required (MCCB will be supplied by NALCO free of cost).
(iv) Replacement of defective Voltmeters, ammeters, indication lamps, etc. if required. (Meters/lamps will be supplied by NALCO free of cost).
(v)Checking & ensuring the proper earthing of LT Panels.
(vi) Rewriting of nomenclature if found erased.
[Refer A.4 of Scope of Work for details]
-
-
-
... More
a) FDB (P)
30
-
-
... More
b) FDB (L)
42
-
-
... More
c) BDB (L)
6
-
-
... More
d) MDB
6
-
-
... More
e) APFC Panel
6
-
-
... More
f) ASCO Panel
6
-
-
... More
g) MDB (L)
6
-
-
... More
h) DB (Lift)
6
-
-
... More
i) Area Lighting panel
6
-
-
... More
A5 Maintenance of Earth Pits EPs)(All Panels, 11KV SW Yd & 100KVA DG Set)
Activities:
(i) Cleaning and watering the EPs.
(ii)Earth termination point to be checked for proper tightness, replacement of nuts, bolts, washers if necessary
(iii)Replacement of damaged earth flat (Flat will be supplied by NALCO free of cost).Replace Chamber covers, if found damaged.
(iv)Earth resistance of all EPs individually & of grid to be measured with earth tester once in a year & values to be recorded.
v)Wright/Rewrite Pit Numbers on EP chamber Once a Year.
[Refer A5 of Scope of Work for details]
80
-
-
... More
A6 Optional work to be done on requirement basis [Rewinding of fans & Water Pump Motors] [Refer A6 of Scope of work for details]
-
-
-
... More
a) Ceiling fan
14
-
-
... More
b) Exhaust fan
10
-
-
... More
c) Pump Motors i) 3-Ph, 415V, 2.2KW
1
-
-
... More
ii) ii) 1-ph, 230V, 1.1KW
1
-
-
... More
PART-B (IN PORT FACILITIES)
-
-
-
... More
(All the Items to be operated ONCE in 04 Months over and above breakdown calls)
-
-
-
... More
33KV Switch yard-01 [Refer Point No.1 of scope of Work]
6
-
-
... More
33KV Switch yard-02 [Refer Point No.2 of scope of Work]
6
-
-
... More
Caustic soda Pump House MCC Panel ( 2300mm H X 3200mm W X 850mm D ) [Refer Point No.3 of Scope of work]
6
-
-
... More
Wagon Unloading shed-1 feeder pillar Panel [2270mm H X 1700mm W X 830mm D] [Refer Point No.4 of Scope of work]
6
-
-
... More
Silo-2 Feeder Pillar [2270mm H X 2510mm W X 830mm D] [Refer Point No.5 of Scope of work]
6
-
-
... More
Silo-1 Feeder Pillar [2270mm H X 2510mm W X 830mm D] [Refer Point No.6 of Scope of work]
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements