Municipal Administration Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Administration Department Tender
Opening Date11 Feb 2021
Closing Date18 Feb 2021
Tender Amount₹ 74,24,053
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
376024Tender No
10(3)/VNP/14thFC/2020-21Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Parks with walking track from Kunapareddy Nagar;Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. (Observed Data)
638
-
90157
... More
Development of Parks with walking track from Kunapareddy Nagar;Bed preparation for Korean/Mexican: Dressing the surface to the desired shape, laying of 150 mm. (6?) thick fine red garden soil, covered with a thin layer of 10 mm thick sand, watering, rolling (compacting to 4" thickness by hand roller), including the cost of red garden soil, sand and labour charges etc., for complete bed preparation and laying and ramming of lawn mats / rolls in proper position on existing prepared bed by internal transportation from dumped place, including cost of labour for laying, ramming by hand roller / demesha, internal transportation and watering etc., complete for finished item of work excluding cost of grass, fertilizers and chemicals etc., for 1 Sqm (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
442
-
77903
... More
Development of Parks with walking track from Kunapareddy Nagar;Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine and edging & weeding of the lawns (once in 15 days from June - Nov and once in 30 days from Dec - May) with watering 10 to 15 ltrs /per Sqmt/per day basing on season and weather conditions (30 watering is required in a month to maintain sub-soil moisture continuously), application of fertilizers, insecticides, Fungicides (once in a month) by manual excluding cost of fertilizers & water.
442
-
43795
... More
Development of Parks with walking track from Kunapareddy Nagar;Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
425
-
94116
... More
Development of Parks with walking track from Kunapareddy Nagar;Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month
425
-
118238
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.For Bougainvillea
352
-
14784
... More
Development of Parks with walking track from Kunapareddy Nagar;For Murraya paniculata
676
-
23660
... More
Development of Parks with walking track from Kunapareddy Nagar;For Nerrium oleander
352
-
15840
... More
Development of Parks with walking track from Kunapareddy Nagar;For Caesalpinia
352
-
15840
... More
Development of Parks with walking track from Kunapareddy Nagar;For Ixora dwarf
1175
-
35250
... More
Development of Parks with walking track from Kunapareddy Nagar;For Allamanda cathartica
11753
-
21150
... More
Development of Parks with walking track from Kunapareddy Nagar;For Acalypha inferna
1175
-
21150
... More
Development of Parks with walking track from Kunapareddy Nagar;For Tecoma capensis
1175
-
35250
... More
Development of Parks with walking track from Kunapareddy Nagar;For Heliconia
1175
-
47000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Clerodendrum inferme
1175
-
47000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Photinia
1175
-
47000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Korean grass
442
-
66300
... More
Development of Parks with walking track from Kunapareddy Nagar;For Wedelia trilobata
842
-
15155
... More
Development of Parks with walking track from Kunapareddy Nagar;For Pandanus gold
842
-
15156
... More
Development of Parks with walking track from Kunapareddy Nagar;For Rhoeo spathacea
842
-
15156
... More
Development of Parks with walking track from Kunapareddy Nagar;For Alternanthera
842
-
15156
... More
Development of Parks with walking track from Kunapareddy Nagar;For Conocarpus erectus
37
-
7770
... More
Development of Parks with walking track from Kunapareddy Nagar;For Peltophorum pterocarpum
10
-
3000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Azadirachta indica
13
-
2340
... More
Development of Parks with walking track from Kunapareddy Nagar;For Mimusops elengi
9
-
2700
... More
Development of Parks with walking track from Kunapareddy Nagar;For Erythrina variegata
11
-
4400
... More
Development of Parks with walking track from Kunapareddy Nagar;For Nyctanthes arbor-tristis
30
-
12000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Wodyetia bifurcata
28
-
14000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Millingtonia hortensis
18
-
5040
... More
Development of Parks with walking track from Kunapareddy Nagar;For Neolamarckia cadamba
2
-
560
... More
Development of Parks with walking track from Kunapareddy Nagar;For Plumeria rubra
27
-
12150
... More
Development of Parks with walking track from Kunapareddy Nagar;For Spathodea campanulata
6
-
1050
... More
Development of Parks with walking track from Kunapareddy Nagar;For Terminalia catappa
3
-
900
... More
Development of Parks with walking track from Kunapareddy Nagar;For Roystonea regia
22
-
8800
... More
Development of Parks with walking track from Kunapareddy Nagar;For Tecoma gaudichaudi
13
-
5200
... More
Development of Parks with walking track from Kunapareddy Nagar;For Bignonia megapotamica
6
-
2400
... More
Development of Parks with walking track from Kunapareddy Nagar;For Terminalia mantaly
41
-
26650
... More
Development of Parks with walking track from Kunapareddy Nagar;For Plumeria alba
39
-
17550
... More
Development of Parks with walking track from Kunapareddy Nagar;For Saraca asoca
13
-
5200
... More
Development of Parks with walking track from Kunapareddy Nagar;For Butea monosperma
4
-
1600
... More
Development of Parks with walking track from Kunapareddy Nagar;For Bauhinia blakeana
2
-
560
... More
Development of Parks with walking track from Kunapareddy Nagar;For Callistemon citrinus
18
-
7200
... More
Development of Parks with walking track from Kunapareddy Nagar;For Ficus benjamina
13
-
2600
... More
Development of Parks with walking track from Kunapareddy Nagar;For Samanea saman
10
-
4000
... More
Development of Parks with walking track from Kunapareddy Nagar;For Cordia sebestena
23
-
6900
... More
Development of Parks with walking track from Kunapareddy Nagar;For Pongamia pinnata
18
-
3150
... More
Development of Parks with walking track from Kunapareddy Nagar;For Lagerstroemia speciosa
5
-
3745
... More
Development of Parks with walking track from Kunapareddy Nagar;For Cassia fistula
4
-
1120
... More
Development of Parks with walking track from Kunapareddy Nagar;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
206
-
46086
... More
Development of Parks with walking track from Kunapareddy Nagar;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
67
-
269922
... More
Development of Parks with walking track from Kunapareddy Nagar;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH
3000
-
844830
... More
Development of Parks with walking track from Kunapareddy Nagar;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).
20
-
117859
... More
Development of Parks with walking track from Kunapareddy Nagar;Providing Plasteing with CM (1:3), 12 mm thick including Cost & Conveyance of all materials and labour charges for mixing and curing etc., Complete as per S.S.
194
-
62542
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
65
-
14563
... More
Development of Parks with walking track from Kunapareddy Nagar;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)
561
-
320785
... More
Development of Parks with walking track from Kunapareddy Nagar;Filling with carted coarse sand in with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)
284
-
162715
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work
1255
-
732481
... More
Development of Parks with walking track from Kunapareddy Nagar;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
30
-
6712
... More
Development of Parks with walking track from Kunapareddy Nagar;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
20
-
80574
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and placing of the VRCC M-20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-2-14) For FENCING POLES.
2
-
16640
... More
Development of Parks with walking track from Kunapareddy Nagar;Providing concrete for plain/reinforced concrete (M15) in open foundations using 20 mm nominal size Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH
13
-
68512
... More
Development of Parks with walking track from Kunapareddy Nagar;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)
786
-
48873
... More
Development of Parks with walking track from Kunapareddy Nagar;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).
0.9
-
5893
... More
Development of Parks with walking track from Kunapareddy Nagar;Providing Plasteing with CM (1:3), 12 mm thick including Cost & Conveyance of all materials and labour charges for mixing and curing etc., Complete as per S.S.
6
-
1934
... More
Development of Parks with walking track from Kunapareddy Nagar;Painting to the walls with 2 coats of luxury plastic emulsion antain less than 50 Grams per liter of approved brand and shads including one coat of cement primer after throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyaance of all materials to work site and all operational incidental, labour charges etc., complete for finished item of work as per SS 911 for External Walls.
6
-
1344
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work
295
-
26152
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials to site with all taxes and duties etc complete for finished item of work
98
-
8688
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work.
3
-
266
... More
Development of Parks with walking track from Kunapareddy Nagar;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
17
-
2876
... More
Development of Parks with walking track from Kunapareddy Nagar;Supplying and fixing G.I. Chainlink fabric fencing of required width in mesh size 50x50 mm opening of 4 mm dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work
84
-
61458
... More
Development of Parks with walking track from Kunapareddy Nagar;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
55
-
12305
... More
Development of Parks with walking track from Kunapareddy Nagar;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)
12
-
48344
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and placing of the VRCC M-20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (BLD-CSTN-2-14) For FENCING POLES.
43
-
357750
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work
4115
-
364795
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials to site with all taxes and duties etc complete for finished item of work
1970
-
174641
... More
Development of Parks with walking track from Kunapareddy Nagar;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work.
58.8
-
5213
... More
Development of Parks with walking track from Kunapareddy Nagar;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
244
-
41277
... More
Development of Parks with walking track from Kunapareddy Nagar;Supplying and fixing G.I. Chainlink fabric fencing of required width in mesh size 50x50 mm opening of 4 mm dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work
1440
-
1053562
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements