To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Municipal Administration Department Tender
Opening Date12 Feb 2021
Closing Date25 Feb 2021
Tender Amount₹ 1,13,96,979 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
376158Bid Award Id
ViewTender No
4-2/14FC 2019-20/ALGM/2020-21Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CC Drain;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Mechanical Means etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of GST & NAC
3044.33
-
297979
... More
CC Drain;Supply and filling with Sand complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work (APDSS No.101) etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
313.08
-
160763
... More
CC Drain;Laying Cement concrete (1:4:8) using 40mm nominal size HBG metal M/C including cost and conveyance of all materials from approved quarry, machine mixing, vibrating, laying, levelling, ramming, curing and labour charges etc., complete. As per APSS 402 etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
313.08
-
1231838
... More
CC Drain;V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and OPC course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days excluding centering charges as per APSS - 402. FOR Bed concrete etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
198.45
-
864085
... More
CC Drain;V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and OPC course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days excluding centering charges as per APSS - 402. FOR Side Walls and Culverts etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
730.35
-
3303563
... More
CC Drain;V.C.C. (1:3:6) using 20mm (SS-5) HBG M/C graded Metal and OPC course and fine agregates conforming to IS:383 including cost and conveyance of all materials, Labour charges, Machine Mixing, vibrating, laying in position quring for 21 days excluding centering charges as per APSS - 402. FOR Bed concrete & Side Walls etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
544.4
-
2462463
... More
CC Drain;Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and water to work site and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc., complete for finished item of work etc complete and as Directed by the Engineer-in-charge of the work but excluding Cost of Seiogirage, GST & NAC
4499.15
-
1372961
... More
CC Drain;Supply and placing of the V.R.C.C. M - 20 Nominal Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). For Culvert Slab etc complete and as Directed by the Engineer-in-charge of the work
26.1
-
218535
... More
CC Drain;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work etc complete and as Directed by the Engineer-in-charge of the work
2088
-
130813
... More
CC Drain;Laying cement concrete (1:2:4) using 20 mm nominal size HB metal M/C including cost and conveyance of all materials from approved quarry, machine mixing, vibrating, laying, levelling, ramming, curing and labour charges etc complete as per APSS 402 etc complete and as Directed by the Engineer-in-charge of the work
43.5
-
216854
... More
CC Drain;Carting of excavated Earthwork with a lead of 1 km, including loading & unloading and conveyance charges for machines per kilometer for transporting materials by tippers and tractors etc., complete as directed by the Engineer-in-charge of work.
3548.33
-
114079