Military Engineer Services Tender

... More
The MES has issued a formal invitation for competitive bids for the Military Engineer Services project, for Repairs / Maintenance Of Various Chiller Units Of Centralised Ac Plants Of Make Voltas In Naval Station, Bheemunipatnam in Visakhapatnam, Andhra Pradesh, with an estimated contract value of Rs. 24,40,000. The bid opening date for this tender is 09-06-2025 and the last date for bid submission is 30-06-2025. Interested bidders for Military Engineer Services tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date9 Jun 2025
Closing Date30 Jun 2025
Tender Amount₹ 24,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply only Package Unit machine monitoring display complete set Unit Model : DPUWSC55 or equivalent

1

-

-

... More
Supply only MPD, PMN, and controller. Unit Model : APUWSC55.

1

-

-

... More
Supply only Refrigerants gas R-22

31

-

-

... More
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 25 TR AC Plant Make: Voltas Model no WCDSO24DMN P 206 NAD including panel, condenser, evaporator recommissioning re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including brazing of liquid and discharge line, leak test, pressure test, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers instruction with following items as given below all as directed by Engr-in-charge.

1

-

-

... More
Note: (i) The rate quoted shall be deemed to include for necessary T&P, MS Nuts, MS Bolts, MS washers, gaskets drier core filter etc to put into AC Plant and panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 2.03 to 2.07 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.

-

-

-

... More
(iii) Any minor spares/parts/accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/ panel operating parameter microprocesor, motherboard communication, control board, transducers etc, is deemed to be included in the rate. (v) Servicing shall be carried out through OEM/authorised Agency only and test report shall be submitted in duplicate.

-

-

-

... More
Supply only Compressor Model : SM18534RC in cluding brazing.

1

-

-

... More
Supply only condenser unit as per specific requirement sutaible for existing water cooled chiller package existing chiller package Model ACWCDS024DMN New condenser model model: AC170400000CI.

1

-

-

... More
Supply only of DX Evaporator assembly wih enhanced feature as per the reqirment sutaible for the existing water cooled chiller package to new Evaporator , Re-commissioning the unit Including Refrigerant and Existing chiller package model : ACWCDS024DMN New Evaporator model: AC177000000C.

1

-

-

... More
Supply Expansion valve existing model .

2

-

-

... More
Supply only Refrigerants gas R-22

61

-

-

... More
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 30 TR. Make : Voltas Model no WCUR0400MNT IN HANGER 9 including panel recommissioning, Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers instruction and with following items as given below complete all as directed by Engr-in-Charge.

1

-

-

... More
Note: (i) The rate quoted shall be deemed to include for necessary T&P, MS Nuts, MS Bolts, MS washers, gaskets etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 3.03 to 3.09 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.

-

-

-

... More
(iii) Any minor spares/parts/accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/panel operating parameter microprocesor, motherboard communication, control board, shaft seal assembly transducers etc, is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.

-

-

-

... More
Supply only Compressor oil

20

-

-

... More
Supply only Refrigerants gas R-22

61

-

-

... More
Supply only Panel machine monitoring display set Model : WCUR0400MNT or equivalent

1

-

-

... More
Supply of spares pressure transmiter, oil sensor, MVPD, crank shaft, main bearing, piston ring set suction valve read, discharge valve reads, piston including connected accessorries. Unit Model : WCUR0400MNT.

1

-

-

... More
Supply only Pressure Transduser existing model.

1

-

-

... More
Supply and Servicing suction and discharge valve of compresor including replacing of teflon sheet washer and neoprene ring etc

2

-

-

... More
Supply only Expansion valve Existing model

2

-

-

... More
M&L for carrying out complete the rectification of compressors, condensers and evaportor system capacity of 3 x 39 TR. Make : Voltas Model no WCUR0400MNT in MARCOS including panel recommissioning, Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers instruction and as directed by Engr-in- charge.

1

-

-

... More
Note: (i) The rate quoted shall be deemed to include for necessary T&P, MS Nuts, MS Bolts, MS washers, gaskets drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 4.03 to 4.05 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.

-

-

-

... More
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Renewal of control wiring in the system/ panel is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.

-

-

-

... More
Supply only Compressor Model : SM18554RC and MPD incl copper brazining. Model : WCUR0400MNT

1

-

-

... More
Supply only MPD supply 230 VAC. Model: WCUR0400MNT

1

-

-

... More
Supply only Expansion valve existing model.

2

-

-

... More
Supply only Refrigerants gas R-407

122

-

-

... More
M&L for carrying out complete the rectification of compressors, condensers and evaportor system capacity of 3 x 50 TR Hanger 11 Make : Voltas including panel recommissioning, Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as per manufacturers instruction and with following items as given below complete all as directed by Engr-in-charge.

1

-

-

... More
Note: (i) The rate quoted shall be deemed to include for necessary T&P, MS Nuts, MS Bolts, MS washers, gaskets drier core filter etc to put into AC Plant and panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 5.03 to 5.08 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.

-

-

-

... More
(iii) Any minor spares/parts/accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/panel operating parameter microprocessor, motherboard communication, control board, transducers etc, is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.

-

-

-

... More
Supply only pressure switch.

1

-

-

... More
Supply only Contactor Set for 3 pole contactor AC3, 32Amps as existing.

1

-

-

... More
Supply only MVPD & Temperature sensor.

1

-

-

... More
Supply only Refrigerants gas R-22

61

-

-

... More
Compressor Model : SM18554RC and MPD incl copper brazining. Model : WCUR0400MNT

1

-

-

... More
Supply only MCCB 3 pole, 35 KA 100 Amp from the existing pannel, adjustable type.

1

-

-

... More
Supply only expansion valve

2

-

-

... More
M&L for complete rectification of compressors, condensers and evapator system capacity of 60 TR Make : Voltas Model : WCDR060RMN Hanger C-01 including panel recommissioning, Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers instruction and with following items as given below complete all as specified and directed by Engr-in-charge.

1

-

-

... More
Note: (i) The rate quoted shall be deemed to include for necessary T&P, MS Nuts, MS Bolts, MS washers, gaskets etc drier core filter to put into AC Plant and panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 6.03 to 6.06 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.

-

-

-

... More
(iii) Any minor spares/parts/accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/panel operating parameter microprocesor, motherboard communication, control board, transducers etc, is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.

-

-

-

... More
Supply only Electrical panel controller unit model no WCDS048DMN2X2.

1

-

-

... More
Supply only Refrigerants gas R-22

122

-

-

... More
Supply only Expansion valve Existing model

2

-

-

... More
Supply only Power Contactor Set for 3 pole contactor AC 3, 25 Amps MNX 25 as existing panel

2

-

-

... More
M&L for carrying out attending to break down of central type AC plant of capacity upto 60 TR by only auth OEM (M/S VOLTAS) rep/team for fault finding incl attending repairs as and when required such as no start condition of AC plant and repairing, starting, the operating parameter of the chillers checking any vibration, functioning microprocessor, flow swich calibration, HP/LP cut out swich, oil pump and oil heater the AC plant till smooth running and setting up the alignment required parameter of all major/minor parts such as compressor microprocessor based central AC plant, general repair smooth and trouble free operation of plant to the entire satisfaction of user /dep. Attending break down inspection service report duly mentioning the date of inspection signature of service engineer, Engineer -in- Charge shall be submitted for claming payment, as required in ground as ordered by Engr-in-charge.

6

-

-

... More
M&L for carrying out the descaling of the shell & Tube condensers by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon as recommended by manufacturer and the scale deposit inside copper tube by forced circulation and opening the end covers, mechanical brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages, apply grease to all M.S. Bolts & Nuts and put the condensers of the following capacities in operational complete all as directed by Engr - in - Charge:-

-

-

-

... More
15 TR Capacity

2

-

-

... More
25 TR Capacity

3

-

-

... More
30 TR Capacity

3

-

-

... More
39 TR Capacity

3

-

-

... More
50 TR Capacity

3

-

-

... More
60 TR Capacity

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.