The MES has issued a formal invitation for competitive bids for the Military Engineer Services project, for Maintenance And Servicing Of 132 11 Kv Transformers Control Relay Panels Cables Earthings And Allied Works At Mrs At Naval Dockyard Visakhapatnam Under Ge (i) Dm Visakhapatnam in Visakhapatnam, Andhra Pradesh, with an estimated contract value of Rs. 47,98,000. The bid opening date for this tender is 23-10-2026 and the last date for bid submission is 20-11-2026. Interested bidders for Military Engineer Services tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Military Engineer Services - MES Tender - AP Tender

Opening Date23 Oct 2026
Closing Soon20 Nov 2026
Tender Amount₹ 47,98,000 
Notes
Download

Costs

Description

Maintenance And Servicing Of 132 11 Kv Transformers Control Relay Panels Cables Earthings And Allied Works At Mrs At Naval Dockyard Visakhapatnam Under Ge (i) Dm Visakhapatnam

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Note for item No. 1.00 to 3.00 :- (a) New transformer oil to be bought in company sealed ISI marked container with test certificate and cost of container & transportation & lab test shall be inclusive of the quoted rate (b) Filtration /dehydration of transformer oil shall be carried out at the location where transformer is installed and required pipe connection from filter machine to transformer shall be made and rate shall be inclusive of quoted rate. (c) Necessary filter/dehydration plant having pressure gauge, hour meter, temperaturature gauge to be brought at site by contractor and to be kept permanently inside ND (V) till completion of work and rate deemed to be included in the quoted rate. In any condition, in-out of the filter machine during the progress of the work will not be allowed. (d) Transformer oil test report before and after dehydration/filtration shall be submitted duly authenticated by authorised person .

-

-

-

... More
M & L for replacement of silica gel grains in the breather assembly of transformer complete all as specified and directed.

20

-

-

... More
M & L for replacement of breather assembly made with polycarbonate base and clear acylic glass of size to accommodate 2.0 kg of silica gel for transformer complete all as specified and directed.

2

-

-

... More
M&L for maintenance/servicing of 132/11 KV transformer OLTC control panel board after dismantling taking out all doors, covers from front and rear. Servicing comprising of thorough cleaning of complete inside cabinet with forced air and suitable cleaning agent, removing all dust/dirt, cleaning of all insulators, busbars, switchgears, all cable terminals with CTC and clean dry cloth, cleaning of outside surface with CTC and dry cloth, tightening of all nuts, bolts & washers. Repair comprising of replacement of burnt aluminium cable lugs, burnt switchgear, non-functional panel meters, non-functional indicator lamps, damaged panel metering wirings, nonfunctional selector switches, unsv CTs, unsv bakelite fuse with fuse base, damaged panel door/cover knobs & door locks, damaged door hinges, damaged cable insulation with coloured heat shrink insulating sleeves and required nuts, bolts & washers. Overhauling comprising of dismantling cable ends from panel board and cable duct, replace with new one, providing proper aluminium cable lugs and refixing to original position with required nuts, bolts & washers complete all as specified and directed.

2

-

-

... More
Note:- Items require for replacement such as Panel Meters, indicator lamps, CT, selector switches, metering cables will be inclusive of quoted rate. (ii) required cleaning items, aluminium cable lugs, nuts-bolts-washers, door hinges, door locks, door/cover knobs, bakelite fuse base with HRC fuse of panel wiring circuits shall be inclusive of quoted rate.

-

-

-

... More
Periodical cleaning of complete transformer outer surface including 132 KV bushings, radiators, marshaling tank with volatile cleaning agent at every alternate 3 month to keep the complete outside surface dry and clean all as specified and directed. Note :- 2 times cleaning i.e. quarterly basis measured as one each job.

2

-

-

... More
M&L for painting of old painted yard steel structure/MS laddder surface of tower lights with one coat of red oxide and two coats of synthetic enamel paint complete all as specified and as directed

6

-

-

... More
Material & labour for cleaning of 132 outdoor kit feeder 1 , Feeder 2, TR 2 & TR3 HV side complete removing all dirt and dust accumulated inside fins with suitable cleaning agent cleaning of complete mounting MS structure and painting the supporting structure with one coat of aluminium paint opening and reconnection of all earth terminals after cleaning jointing surfces complete all as specified and as directed.

4

-

-

... More
M&L required for servicing & maint of 132KV, horizontal double break isolators "GRPS" make, 132 KV, triple pole, 31.5 KA centre post rotating horizontal double break type isolators suitable for upright mounting with manual operated mechanism for main switch and earth switch (i.e. mechanically gang operated) with all accessories required for normal operation of the isolator, but without support insulators, without supporting structure and without terminal connectors with following configuration (copper design) : - a) For 800 Amps with one earth switch. b) Support insulators for the above isolators. One stack consisting of 325 KV having a creepage distance of 4495 mm and cantilever strength of 6 KN as manufactured & tested (31mm/KV) (Per No.). c) Terminal connectors for the above isolators a set of 06 Nos. Rigid type bimetallic terminal connectors suitable for single ASR Zebra conductor.

2

-

-

... More
M&L for complete Repl of earth conductor after opening aluminium pad clamp by removing nuts, bolts from 132KV yard lightning protection conductor decarbonizing all contact surface of conductor, replacement of unserviceable aluminium PAD clamp suitable for panther conductor and 132KV Air break switch / Lightning arrestor terminal all as specified and directed

180

-

-

... More
Maintenance, servicing,Testing of following IED's fitted on 132KV control relay panel as per checklist which mainly include disassembling various parts (if necessary) to check for healthiness, cleaning, tightness checks, functional & protection checks with automatic Secondary injection relay test kit having six channels to be used to carried out healthiness checking of entire protection circuit, metering circuit and functional checks of all auxillary relays and overall control devices like TRIP/N/CLOSE switch, LOCAL/REMOTE switch & its's controls to be checked complete all as specified and directed. Note : Replacement of defective parts shall be measured and paid separately.

-

-

-

... More
Transformer Diffrential relays P632

3

-

-

... More
Over current Earth fault relays P141

6

-

-

... More
Distance/Cable diffrential relays P442

2

-

-

... More
Bus bar diffrential relays P746

2

-

-

... More
M&L for THERMOGRAPHIC TESTING of 132kV switch yard with IMAGE INFRARED CAMERA to detect Hot spots, to avoid electrical failures and increase safety for all current-carrying devices. Visual and mechanical inspection to be done when load is applied to the system. Use & follow appropriate caution, safety devices, and personal protective equipment. Provide a report which includes the following, all as specified and directed. 1. Description of equipment tested. 2. Discrepancies if any. (HOT Spots). 3. Identify load conditions at time of inspection. 4. Provide photographs and/or thermo grams.

5

-

-

... More
M&L for complete checking of trip circuit from transformer marshalling box control panel to relay control panel for ensuring proper functioning of all trippings like buccholz, winding & oil temp, OSR, PRV and OLTC circuit and making necessary repairs (if necessary) of all contacts points, checking of forced air circulation system with rise in oil/winding temp, replacement of necessary relays, contactors complete all as specified and directed.

2

-

-

... More
Supply and fix/retrofit of latest updated version of Schneider Numerical relay in place of Schneider Micom P-127 protection relay, 110V, 5A, type-BAOZ112Ca1 to Schneider make 11KV VCB including dismantling taking down unsv one and including testing/checking of all other parameters of relays for proper tripping order all as specified and directed.

8

-

-

... More
Supply and fix Schneider High speed trip relay, type-VAJH, 110V to Schneider make 11KV VCB incl necessary connection testing complete incl dismantling taking down unsv one and including testing/checking of all other parameters of relays for proper tripping order all as specified and directed.all as specified and directed.

4

-

-

... More
M&L for dismantling & taking out radiator cooling fan from its mounting position , transportation from yard to to civil workshop outside ND (V) for re winding of heavy duty 3ph exhaust fan after opening complete motor assy, bearings, bushings, removal of burnt copper wire, cleaning of core, inserting proper insulating paper in slots, winding with and as per existing size/turn of super enamelled copper wire, heating, vernishing, replacement of unsv bearings / bushings / capacitor pad / connector block, connection wire 3 core, assemble of rotor and stator unit with capacitor, connecting wire, capacitor pad, down rod, blades complete all as specified and directed.

3

-

-

... More
Material & labour for preparation of surfaces by scrapping and removing old painted surface with wire brush and applying white wash to wall/coping/Plinth protection area, Earth pits of MRS bldg/GIS bldg complete at alternate 60 days all as specified and directed.

3

-

-

... More
M&L for cleaning of 11 KV power reactors with Capacitor bank and all mounting structures, 11KV cable kits, all supporting 11KV pin insulators, replacement of damaged 11KV pin insulator, opening and reconnection of all GI/AL strips of capacitor terminals after duly cleaning the surfaces, painting to complete mounting structure with one coat of aluminium paint, opening and reconnection of all earth terminals after cleaning jointing surfaces complete all as specified and directed.

14

-

-

... More
M&L for complete servicing of APFC panel 3600 KVAR, (Auto /manual Opr mode), cleaning of Vacuum contactor type CS-VP11, 11KV, 50 Hz having control voltage 110V DC, opening and reconnection of all contactor, DC contact, Bus bar, terminal complete all as specified and directed.

2

-

-

... More
Supply and fix current limiting reactor, Air core/ Dry type series reactor, Outdoor type, 11KV, 350 kVAR, 50 Hz , Continuous duty suitable for 1200 kVAR, Reactor %age- 5.67, insulation class `F or H' cooling - AN (level 28/75) temperature cat- 10/D , standard as per IS 13925 (Part1):2012 all as specified and directed Note : (i) The contractor must personally supervise the entire, proceedings of the activity any damage occurred during execution of work, he is solely responsible for payments of damaged. (ii) Scanning of harmons by conducting the reactor effectiveness, test with the testing equipment for 3 phase 11 KV system capacities upto 1200 KVAR and submission of necessary test result to Engineer-in-Charge. (iii) The unit rate quoted shall be deemed to be included for total proceedings regarding testing, commissioning, erection including two coats of painting fuse structure.

3

-

-

... More
M&L for repl of Power Vaccum Contactor 11KV, 50 Hz, CG model No CS-VP11, Insulation voltage 12 kV, Rated current - 400A , Control voltage 110V DC complete as specified and directed.

3

-

-

... More
Supply and fix 11 KV capacitor bank unit Mangoldt type , outdoor type, single phase, heavy duty, Voltage rating -7.3kV, 50Hz, Output-350kVAR, Rated current- 28.3A, Insulation level: LI60kV/AC28kV, Dielectric type, Discharge time 5 Min with free mounting on outdoor structure aluminum wound, all as specified and directed Note : (i) The contractor must personally supervise the entire, proceedings of the activity any damage occurred during execution of work, he is solely responsible for payments of damaged. (ii) Scanning of harmons by conducting the reactor effectiveness, test with the testing equipment for 3 phase 11 KV system capacities upto 1200 KVAR and submission of necessary test result to Engineer-in-Charge. (iii) The unit rate quoted shall be deemed to be included for total proceedings regarding testing, commissioning, erection including two coats of painting fuse structure.

6

-

-



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.