Jawaharlal Nehru Technological University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Jawaharlal Nehru Technological University - JNTU Tender

Opening Date12 Oct 2021
Closing Date26 Oct 2021
Tender Amount₹ 22,66,036 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation of bathrooms and toilets;Supply & fixing 4'' (101.6 mm) Nahany Trap (without inlet with out Jali) UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand) complete including cost of cutting & making good the walls and floors etc as directed by Engineer-in-charge including cost & conveyance of all materials to work site, all labour charges for fixing etc; complete for finished item of work.

140

-

11620

... More
Renovation of bathrooms and toilets;Providing 110mm dia - Singel Tee - PVC pipe fittings (price/Sudhakar or any ISI Brand complete finished item of work.

230

-

20930

... More
Renovation of bathrooms and toilets;Providing 110mm dia - Round Jali - UPVC/SWR Pipe fittings or any ISI Brand complete finished item of work.

260

-

5200

... More
Renovation of bathrooms and toilets;Providing 110mm dia - Coupler - PVC pipe fittings (price/Sudhakar or any ISI Brand complete finished item of work.

325

-

17875

... More
Renovation of bathrooms and toilets;Providing 110mm dia - Door Bend 87.5 Degree - PVC pipe fittings (price/Sudhakar or any ISI Brand complete finished item of work.

118

-

10738

... More
Renovation of bathrooms and toilets;Providing 110mm dia - Vent Cowl - PVC pipe fittings (price/Sudhakar or any ISI Brand complete finished item of work.

46

-

736

... More
Renovation of bathrooms and toilets;Supplying and fixing Orissa Pan White glazed 580mmx440mm long of parry Neycer/H.S.W/ Parryware make with 'P' & 'S' trap - ISI Mark,low down PVC flush tank of 10 liters capacity including constructing Brick masonry seat and CC Squatting plate, Foot rest, brass stop cock india make 300 grams and 12.7mm PVC Connectiuon finishing etc complete as per standard practice for finished item of work

50

-

208300

... More
Renovation of bathrooms and toilets;Supply & fixing of European type first quality box colset integral with P or S type vitreous trap, including 10 litres capacity low level PVC flushing cisrtern of pary ware slimlinge make and colour conforming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connector, 15mm dia CP brass stop cock 300 grams, all fixtures of ISI mark, cutting & making good the walls and floors wherever required including cost & conveyance of all materials to work site, all labour charges for all operations for fixing etrc; complete including providing white frame and inged cover to the commode etc; as directed by Engieer- in- charge (Neycer/Parryware/Hindustan) during execution etc; complete for finished item of work.

21

-

104118

... More
Renovation of bathrooms and toilets;Filling with Sand in trenches, sides of foundations & basement from approved quarry consolidating deposited layer by watering and ramming, including all operational, incidental, labour charges, complete including cost and conveyance of sand / gravel for finished item of work. (APSS No 309 & 310).

48

-

31296

... More
Renovation of bathrooms and toilets;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 40mm size (SS5) hard Trap metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, Including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations ramming in 15 cm layers Including vibrator charges finishing top surface to the required level curing etc., complete for finished item of workExcluding seigniorage charges (APSS No. 402)

33

-

112563

... More
Renovation of bathrooms and toilets;Flooring with non-skid ceramic tiles (450 x 450mm) of 1st quality of all shade and sizes, not less than 7 to 8 mm thick set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with epoxy 3-5 mm mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab the rate is befour laying size and shade should be got approvel from the Engineer-in-charge.The rate is including cost and conveyance of all materials like cement, sand, water, ceramic tiles, epoxy, etc., to site (excluding cost of C.C. bed) cost of seigniorage charges on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)

276

-

305532

... More
Renovation of bathrooms and toilets;Providing and fixing flooring with full depth jointing and pointing to the Vitrified/ Ceramic Tile flooring in specified thick for tiles of any sizes with epoxy emulsion grout/ synthetic / resin adhesive in width of 3-5 mm with Nylon spacers excluding cost of tiles

750

-

221250

... More
Renovation of bathrooms and toilets;Supplying and fixing of WPVC door frame of size 100 x 50 mm including cost & Conveyance of door frame, brackets, necessary screws and labor charges for fixing in position, etc. complete for finished item of work

436

-

292120

... More
Renovation of bathrooms and toilets;Supplying and fixing of WPVC door shutter of 30mm thick including cost & Conveyance of door frame, brackets, necessary screws and labor charges for fixing in position, etc. complete for finished item of work

153

-

337365

... More
Renovation of bathrooms and toilets;Construction of masonry in CM (1:6) using cement concrete bricks of size 290x225x140 mm manufactured with cement, sand, 6mm HBG chips and compressive strength not less than 50kg/cm2 hydraulic pressed and all other materials obtainable from approved sources to site of work construction of masonry, scaffolding, curing including all leads and lifts for water in all seasons etc. complete for finished item of work.Excluding seigniorage charges,

8

-

41592

... More
Renovation of bathrooms and toilets;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site,Including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) but Excluding seigniorage charges,

100

-

38200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.