Indian Port Rail And Ropeway Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Indian Port Rail And Ropeway Corporation Limited - IPRCL Tender

Works
Eprocure
Opening Date26 Aug 2021
Closing Date4 Oct 2021
Tender Amount₹ 16,52,60,376 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Concrete for foundation & plinth

-

-

-

... More
in hard soil

141

-

-

... More
in rocky soil

141

-

-

... More
in other than hard and rocky soil(in NPB)

1021

-

-

... More
PART B-TOTAL AMOUNT (In Rs.)

-

-

-

... More
DESCRIPTION OF ITEM

-

-

-

... More
Galvanised traction Mast (Rolled, Fabricated) including portal &TTC structres

-

-

-

... More
Supply of Traction Mast

149

-

66663.74

... More
Erection(in PB)

20

-

-

... More
Erection(in NPB)

169

-

-

... More
FIXTURES

-

-

-

... More
Fabricated steel work other than mast

-

-

-

... More
Supply of Small Part Steel

44

-

81833.38

... More
Erection (in PB)

9

-

-

... More
Erection (in NPB)

35

-

-

... More
PART C-TOTAL AMOUNT (In Rs.)

-

-

-

... More
DESCRIPTION OF ITEM

-

-

-

... More
Copper Items(supply of over head equipment)

-

-

-

... More
Contact wire

11

-

479623.65

... More
Catenary wire

0.8

-

278345.93

... More
Dropper wire(5 mm)

4714

-

123.53

... More
160 Sq. mm Copper Conductor

550

-

828.3

... More
105 Sq. mm Jumper wire

550

-

551.51

... More
Erection of OHE(in PB)

3

-

-

... More
Erection of OHE(in NPB)

8

-

-

... More
Supply of briddle wire

3

-

79016.23

... More
PART D-TOTAL AMOUNT (In Rs.)

-

-

-

... More
DESCRIPTION OF ITEM

-

-

-

... More
CANTILEVERS

-

-

-

... More
Bracket assembly for tramway OHE with SPS

-

-

-

... More
Supply of Single bracket assembly for tramway OHE with SPS

393

-

12507.98

... More
Erection (in PB)

79

-

-

... More
Erection (in NPB)

314

-

-

... More
Pull off arrangement for conventional OHE including 9 Ton Insulator & component .

8

-

4368.58

... More
Erection (in PB)

8

-

-

... More
Supply and Erection of Mounting arrangement of span wire.

8

-

995.26

... More
INSULATORS

-

-

-

... More
Porcelain/composite Stay arm Insulator (CD 1050/1600)

393

-

2586.55

... More
Porcelain/composite Bracket Insulator (CD 1050/1600)

393

-

2441.21

... More
Porcelain/Composite 9-Ton Insulator (CD 1050/1600)

145

-

2948.21

... More
Solid core cut-in-Insulator : Compenent

71

-

1121.78

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

69

-

-

... More
Section Insulator assembly (for conventional/Tramway OHE)

-

-

-

... More
S/I assembly

28

-

32070.44

... More
Core Insulator

28

-

4907.55

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

20

-

-

... More
RC FEEDERS

-

-

-

... More
Solid core suspension Insulator - Component

20

-

1586.07

... More
Erection(in PB)

4

-

-

... More
Erection(in NPB)

16

-

-

... More
TERMINATION

-

-

-

... More
Guy rod assembly including mast anchor/guy rod attachment.

55

-

6491.6

... More
Erection(in PB)

16

-

-

... More
Erection(in NPB)

40

-

-

... More
Regulating equipment 3 pulley type with counter weight assembly, guide tube for tramway OHE.

31

-

58569.83

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

24

-

-

... More
Termination of single conductor of OHE Component

39

-

4528.98

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

31

-

-

... More
Anti-Creep .

-

-

-

... More
Component

12

-

7414.13

... More
Erection(in PB)

4

-

-

... More
Erection(in NPB)

8

-

-

... More
25Kv Post Insulator

-

-

-

... More
Post Insulator

43

-

4241.06

... More
Component

43

-

434.37

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

35

-

-

... More
Aluminium Bus Bar

-

-

-

... More
36/28mm busbar

943

-

474.22

... More
Erection(in PB)

236

-

-

... More
Erection(in NPB)

707

-

-

... More
Connector & Terminal

79

-

2891.13

... More
Erection(in PB)

8

-

-

... More
Erection(in NPB)

71

-

-

... More
25KV Single Pole Isolator with inter locking arrangement

11

-

37213.11

... More
Erection(in PB)

3

-

-

... More
Erection(in NPB)

84

-

-

... More
25KV Double Pole Isolator with inter locking arrangement

4

-

68142.85

... More
Earth Contact Assembly

4

-

5853.99

... More
Erection(in PB)

2

-

-

... More
Erection(in NPB)

3

-

-

... More
BONDS

-

-

-

... More
Supply of Structure Bond.

432

-

309.84

... More
Erection of above.

432

-

-

... More
Supply of Longitudinal Bond (C-Bond for X-over over)

1964

-

249.06

... More
Erection of above.

1964

-

-

... More
Supply of Transverse/ Special Bond

354

-

745.2

... More
Erection of above.

354

-

-

... More
NUMBER PLATE & CAUTION BOARDS

-

-

-

... More
Caution Board for 25KV Traction

28

-

373.6

... More
Erection of above.

28

-

-

... More
Danger Board for 25KV

28

-

373.6

... More
Erection of above.

28

-

-

... More
Caution Board (Un-wired Tun-out)

24

-

322.79

... More
Erection of above.

24

-

-

... More
Public Caution Board.

28

-

612.7

... More
Erection of above.

28

-

-

... More
Elect.Engine Stop Board

20

-

704.35

... More
Erection of above.

20

-

-

... More
Working limit Board (Power Block)

20

-

429.39

... More
Erection of above.

20

-

-

... More
Sectioning Diagram Board

12

-

7184.99

... More
Erection of above.

12

-

-

... More
Electric Shock Treatment Chart.

20

-

1363.87

... More
Erection of above.

20

-

-

... More
Number Plates

393

-

610.7

... More
Erection of above.

393

-

-

... More
MODIFICATION WORKS

-

-

-

... More
Transfer of equipment from one Mast/ Support to another/ same mast or support

20

-

-

... More
Provision of additional bracket assembly on a mast or support in PB

20

-

-

... More
Sleewing of OHE in PB

12

-

-

... More
Splicing & extension of anchored OHE

-

-

-

... More
Supply

12

-

2832.35

... More
Erection(in PB)

12

-

-

... More
Adjustment of existing OHE and Tower Wagon checking.

236

-

-

... More
DISMANTLING WORKS

-

-

-

... More
Dismantling of: OHE in PB

5

-

-

... More
Mast/ Structure upright etc. (by cutting) in PB

30

-

-

... More
Dismantling of Cantilever in PB

50

-

-

... More
Dismantling In NPB

50

-

-

... More
Dismantling of Section Insulator (in PB)

8

-

-

... More
Dismantling of SP/DP Isolator (in PB)

8

-

-

... More
Dismantling of Portal/TTC Boom Assembly

-

-

-

... More
Dismantling In PB

3

-

-

... More
Dismantling In NPB

3

-

-

... More
Dismantling of Guy Rod Assembly

-

-

-

... More
Dismantling In PB

8

-

-

... More
Dismantling In NPB

8

-

-

... More
Dismantling of Anti-Creep

-

-

-

... More
Dismantling In PB

4

-

-

... More
Dismantling In NPB

4

-

-

... More
Dismantling of Regulating equipment with counter weight assembly

-

-

-

... More
Dismantling In PB

4

-

-

... More
Dismantling In NPB

3

-

-

... More
Dismantling of Small parts steel.

20

-

-

... More
Retrival of Mast / TTU from Solid Core foundations without damage or leaning of Mast in PB

31

-

-

... More
Dismantling of structure bonds

236

-

-

... More
MISCELLANEOUS

-

-

-

... More
Supply of Single Earth Electrode

39

-

1629.87

... More
Erection

39

-

-

... More
Supply & Erection of First Aid Box

12

-

624.65

... More
Erection of above.

12

-

-

... More
Span wire.

157

-

602.25

... More
Erection(in PB)

31

-

-

... More
Erection(in NPB)

126

-

-

... More
Supply & erection of additional fitting for turnout or overlap for extra materials

-

-

-

... More
Supply

40

-

1939.71

... More
Erection(in PB)

20

-

-

... More
Erection(in NPB)

20

-

-

... More
Copper jumper(C-jumper & anti-theft)

300

-

2743.92

... More
Erection(in PB)

50

-

-

... More
Erection(in NPB)

250

-

-

... More
Supply of 50 x 6 mm MS Flat

-

-

-

... More
Supply

500

-

84.15

... More
Laying of the same in the Ground

250

-

-

... More
Laying of the same exposed

250

-

-

... More
TOTAL

-

-

-

... More
DESCRIPTION OF ITEM

-

-

-

... More
25 KV Vacuum Interruptor/CB

-

-

-

... More
Supply

1

-

209565.92

... More
Erection, Testing and Commissioning

1

-

-

... More
25 KV Type-I/II PT

-

-

-

... More
Supply

1

-

64857.98

... More
Erection, Testing and Commissioning

1

-

-

... More
Aluminium Bus Bar

-

-

-

... More
36/28mm busbar

20

-

460.53

... More
Erection(in PB)

10

-

-

... More
Erection(in NPB)

10

-

-

... More
Copper Cross Feeder (150 sq.mm.)

-

-

-

... More
Supply

30

-

629.53

... More
Erection under Power Block

30

-

-

... More
25Kv Post Insulator

-

-

-

... More
Post Insulator

4

-

3890.38

... More
Component

4

-

430.95

... More
Erection in PB

2

-

-

... More
Erection in NPB

2

-

-

... More
Connector & Terminal

4

-

2007.72

... More
Erection(in PB)

2

-

-

... More
Erection(in NPB)

2

-

-

... More
Copper Jumper

-

-

-

... More
Supply

2

-

2197

... More
Erection under power Block

2

-

-

... More
Supply of 50 x 6 mm MS Flat

80

-

86.19

... More
Laying of the same in the Ground

40

-

-

... More
Laying of the same exposed

40

-

-

... More
Single Earth Electrode

-

-

-

... More
Supply

6

-

2179.26

... More
Erection

6

-

-

... More
Copper Strip 25 mm x 3 mm for Equipment Earthing

-

-

-

... More
Supply

6

-

437.71

... More
Erection

6

-

-

... More
Cabling 2.5 sq.mm 7 Core copper cable for 25 KV Bus Coupler Interruptor Control & Indication

-

-

-

... More
Supply

100

-

146.19

... More
Laying

100

-

-

... More
2.5 sq.mm 2 Core copper for Potential Tranformer Circuits, 240 V AC Supply Circuits

-

-

-

... More
Supply

100

-

57.46

... More
Laying

100

-

-

... More
4.0 sq.mm 2 Core Aluminum Cable for 240 V Heater Circuits

-

-

-

... More
Supply

100

-

44.79

... More
Laying

100

-

-

... More
Supply and Laying of XLPE 70 sq.mm 2 Core Aluminum Cable for LT Power Supply to Control Room

-

-

-

... More
Supply

50

-

118.3

... More
Laying

50

-

-

... More
Cable size 35sqmm 1.1 KV un armoured PVC insulated copper cable

50

-

290.68

... More
Solid core suspension Insulator.

-

-

-

... More
Component

4

-

1586.07

... More
Erection(in PB)

2

-

-

... More
Erection(in NPB)

2

-

-

... More
Supply and installation of and testing of standard SCADA software

1

-

1347775

... More
PART -F TOTAL AMOUNT (In Rs)

-

-

-

... More
Part-G NS ITEMS

-

-

-

... More
DESCRIPTION OF ITEM

-

-

-

... More
Transportation Facility - Hiring of Vehicles-Innova,Tavera or Similar SUV(AC)

18

-

44000

... More
Extra for running and maintenance of every additional Km over and above 1800 Km.

5000

-

11

... More
PART -G TOTAL AMOUNT (In Rs)

-

-

-

... More
PHASE- I TOTAL AMOUNT (PART A+B+C+D+E)

-

-

-

... More
PHASE- I TOTAL AMOUNT (S+E)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.