Indian Navy Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Indian Navy Tender
Machinery and Tools
Electrical and Electronics
Electrical Works
GEM
Opening Date11 Mar 2025
Closing Date25 Mar 2025
Tender Amount₹ 4,48,71,587.04 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 7,18,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2025/B/6023727Bid Award Id
ViewTender No
GEM/2025/B/6023727Tender Authority
Indian Navy ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removing all associated cabling
18
-
-
... More
Removing of old control panel
18
-
-
... More
Provide drawing for modification of existing foundation to suit new ATU and panel
18
-
-
... More
Fitment of shock mounts on foundation
142
-
-
... More
Dismantling of ATU as required in RAC workshop
12
-
-
... More
Shifting and lowering of new ATU on the foundation
18
-
-
... More
Assembly of ATU upon lowering of ATUs
10
-
-
... More
Installation of ATU on the foundation
18
-
-
... More
Modification of ducting piece connected to ATU to meet the interface requirements
18
-
-
... More
Integration of ducting pieces to ATU
18
-
-
... More
Integrating of associated piping with ATU
36
-
-
... More
Installation of flexible hoses on chilled water piping connected to ATU
36
-
-
... More
Interconnection of all removed power and control cables
18
-
-
... More
Installation of chilled water side instruments as per P&ID
18
-
-
... More
Pressure testing of cooling coils of ATU @ 9bar for 20min
18
-
-
... More
Removal of old HEs
44
-
-
... More
Removal of all pipes connected to HE
88
-
-
... More
Removal of all ducting connected to HE
88
-
-
... More
Removing all associated cabling
44
-
-
... More
Removing of old control panel
44
-
-
... More
Provide drawing for modification of existing foundation to suit new HE and panel
44
-
-
... More
Fitment of shock mounts on foundation
210
-
-
... More
Dismantling of HE as required in RAC workshop
44
-
-
... More
Shifting and lowering of new HE on the foundation
44
-
-
... More
Assembly of ATU upon lowering of HEs
44
-
-
... More
Installation of HE on the foundation
44
-
-
... More
Modification of ducting piece connected to HE to meet the interface requirements
44
-
-
... More
Integration of ducting pieces to HE
88
-
-
... More
Integrated of associated piping with HE
88
-
-
... More
Installation of flexible hoses on chilled water piping connected to HE
88
-
-
... More
Interconnection of all removed power and control cables
44
-
-
... More
Installation of chilled water side instruments as per P&ID
44
-
-
... More
Pressure testing of cooling coils of HE @ 9 bar for 20min
44
-
-
... More
Mandatory spares.32 NB Flexible hoses for ATU and HE Part No.-268L70662-M00
44
-
-
... More
Mandatory spares.25 NB Flexible hoses for ATU and HE Part No.-268L70661-M00
60
-
-
... More
Mandatory spares.20 NB Flexible hoses for ATU and HE Part No.-268L70660-M00
16
-
-
... More
Mandatory spares.15 NB Flexible hoses for ATU and HE Part No.-268L70659-M00
4
-
-
... More
Mandatory spares.Supply and return air ducting connection – Mild steel Part No.-5208843
2000
-
-
... More
Mandatory spares.Supply and return chilled water temp. gauge Part No.-225L73851-M00
124
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements