Indian Navy Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Indian Navy Tender

Services
Machinery and Tools
Electrical and Electronics
Electrical Works
GEM
Opening Date11 Mar 2025
Closing Date25 Mar 2025
Tender Amount₹ 4,48,71,587.04 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing all associated cabling

18

-

-

... More
Removing of old control panel

18

-

-

... More
Provide drawing for modification of existing foundation to suit new ATU and panel

18

-

-

... More
Fitment of shock mounts on foundation

142

-

-

... More
Dismantling of ATU as required in RAC workshop

12

-

-

... More
Shifting and lowering of new ATU on the foundation

18

-

-

... More
Assembly of ATU upon lowering of ATUs

10

-

-

... More
Installation of ATU on the foundation

18

-

-

... More
Modification of ducting piece connected to ATU to meet the interface requirements

18

-

-

... More
Integration of ducting pieces to ATU

18

-

-

... More
Integrating of associated piping with ATU

36

-

-

... More
Installation of flexible hoses on chilled water piping connected to ATU

36

-

-

... More
Interconnection of all removed power and control cables

18

-

-

... More
Installation of chilled water side instruments as per P&ID

18

-

-

... More
Pressure testing of cooling coils of ATU @ 9bar for 20min

18

-

-

... More
Removal of old HEs

44

-

-

... More
Removal of all pipes connected to HE

88

-

-

... More
Removal of all ducting connected to HE

88

-

-

... More
Removing all associated cabling

44

-

-

... More
Removing of old control panel

44

-

-

... More
Provide drawing for modification of existing foundation to suit new HE and panel

44

-

-

... More
Fitment of shock mounts on foundation

210

-

-

... More
Dismantling of HE as required in RAC workshop

44

-

-

... More
Shifting and lowering of new HE on the foundation

44

-

-

... More
Assembly of ATU upon lowering of HEs

44

-

-

... More
Installation of HE on the foundation

44

-

-

... More
Modification of ducting piece connected to HE to meet the interface requirements

44

-

-

... More
Integration of ducting pieces to HE

88

-

-

... More
Integrated of associated piping with HE

88

-

-

... More
Installation of flexible hoses on chilled water piping connected to HE

88

-

-

... More
Interconnection of all removed power and control cables

44

-

-

... More
Installation of chilled water side instruments as per P&ID

44

-

-

... More
Pressure testing of cooling coils of HE @ 9 bar for 20min

44

-

-

... More
Mandatory spares.32 NB Flexible hoses for ATU and HE Part No.-268L70662-M00

44

-

-

... More
Mandatory spares.25 NB Flexible hoses for ATU and HE Part No.-268L70661-M00

60

-

-

... More
Mandatory spares.20 NB Flexible hoses for ATU and HE Part No.-268L70660-M00

16

-

-

... More
Mandatory spares.15 NB Flexible hoses for ATU and HE Part No.-268L70659-M00

4

-

-

... More
Mandatory spares.Supply and return air ducting connection – Mild steel Part No.-5208843

2000

-

-

... More
Mandatory spares.Supply and return chilled water temp. gauge Part No.-225L73851-M00

124

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.