Indian Navy Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Indian Navy Tender

Goods
Machinery and Tools
GEM
Opening Date11 Feb 2025
Closing Date4 Mar 2025
Tender AmountRefer Documents 
Auction Start Date9 Apr 2025
Auction End Date11 Apr 2025
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
AC SEA WATER PUMP CAPACITY : 61 TPH b) Degutting of all shock absorber and foundation including pump and motor.

4

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

2

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

3

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

1

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH j) Trials with ships system

4

-

-

... More
BILGE PUMP CAPACITY : 05 TPH c) Degutting of starter panel and fitment of new starter panel.

3

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

1

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

4

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

4

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

1

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

4

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

4

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH c) Degutting of starter panel and fitment of new starter panel.

4

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

4

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

4

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

10

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH c) Degutting of starter panel and fitment of new starter panel.

4

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH b) Degutting of all shock absorber and foundation including pump and motor.

1

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH b) Degutting of all shock absorber and foundation including pump and motor.

4

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH c) Degutting of starter panel and fitment of new starter panel.

2

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

2

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

1

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

1

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

2

-

-

... More
BILGE PUMP CAPACITY : 05 TPH b) Degutting of all shock absorber and foundation including pump and motor.

3

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

10

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

4

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

1

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

1

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH j) Trials with ships system

3

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH c) Degutting of starter panel and fitment of new starter panel.

10

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

3

-

-

... More
BILGE PUMP CAPACITY : 05 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

3

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH b) Degutting of all shock absorber and foundation including pump and motor.

2

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

4

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH b) Degutting of all shock absorber and foundation including pump and motor.

3

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

1

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

10

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

3

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

4

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

1

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

1

-

-

... More
BILGE PUMP CAPACITY : 05 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

3

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

4

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

4

-

-

... More
BILGE PUMP CAPACITY : 05 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

3

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

2

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

1

-

-

... More
BILGE PUMP CAPACITY : 05 TPH j) Trials with ships system

3

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH j) Trials with ships system

2

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH c) Degutting of starter panel and fitment of new starter panel.

4

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

4

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

1

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH j) Trials with ships system

4

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH b) Degutting of all shock absorber and foundation including pump and motor.

4

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH j) Trials with ships system

1

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH c) Degutting of starter panel and fitment of new starter panel.

1

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH j) Trials with ships system

1

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH b) Degutting of all shock absorber and foundation including pump and motor.

1

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH b) Degutting of all shock absorber and foundation including pump and motor.

10

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

3

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

4

-

-

... More
MAIN ENGINE S/BY S/W PUMP CAPACITY: 200 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

1

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

1

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH j) Trials with ships system

1

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

10

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

4

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

1

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH g) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

1

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH c) Degutting of starter panel and fitment of new starter panel.

1

-

-

... More
BILGE PUMP CAPACITY : 05 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

3

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

3

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

4

-

-

... More
FRESH WATER BOOSTER PUMP CAPACITY : 03 TPH f) Testing of new pump with motor at test house as per pressure ratings specified.

1

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

4

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPHg) Lowering and fitment of new pump at modified foundation including regutting with system lines and alignments.

10

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH b) Degutting of all shock absorber and foundation including pump and motor.

1

-

-

... More
BILGE PUMP CAPACITY : 05 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

3

-

-

... More
BILGE PUMP CAPACITY : 05 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

3

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH c) Degutting of starter panel and fitment of new starter panel.

3

-

-

... More
AUXILIARY BILGE PUMP CAPACITY : 03 TPH d) Modification/ renewal of pump foundation including end fitting of suction discharge lines as per new pump drawing/ dimensions including hot work.

10

-

-

... More
AC CHILLED WATER PUMP CAPACITY : 35 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

4

-

-

... More
FLIGHT DECK FIRE MAIN PUMP CAPACITY : 14.33 TPH c) Degutting of starter panel and fitment of new starter panel.

1

-

-

... More
BALLAST PUMP CAPACITY : 200 TPH e) Fitment of new shock absorber at base plate and manufacturing of pressure gauge lines and adaptors.

4

-

-

... More
AC SEA WATER PUMP CAPACITY : 61 TPH j) Trials with ships system

4

-

-

... More
FRESH WATER PUMP CAPACITY : 6.5 TPH h) Manufacturing and fitment of cable tray for gauge lines, coupling gaurds, pressure gauge securing covers.

2

-

-

... More
FIRE MAIN PUMP CAPACITY : 100 TPH a) Degutting of existing pump along with motor, foundation, pipe lines from pump suction, and discahrge flanges to first connection of ships water system.

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.