Hindustan Shipyard Limited Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Hindustan Shipyard Limited - HSL Tender
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date5 May 2025
Closing Date6 May 2025
Tender AmountRefer Documents
Costs
EMD
₹ 10,000Document Cost
₹ 525Tender Fee
Refer Documents
Summary
Shore Supply Box, Rhib,smb,gemini Davits
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HSL_97217_2Tender No
20 / 22040 / 067 / SHORE SUPPLY BOX, RHIB, SMB, GEMINITender Authority
Hindustan Shipyard Limited ViewPurchaser Address
-Website
http://https://www.hslvizag.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Commercial Questionnaire, HSL GTC, GST Compliance and Check List
BOQ Items
... More
SHORE SUPPLY CONNECTION BOX (ND-19743) MARINE ELECTRICALS SHIP ALONGSIDE BOX (EQP NO. 53711) MAINTOP NO- 53500 : CALIBRATION OF PANEL INSTRUMENTS/ METERS.
(III) PHASE SEQUENCE METER- 02 NOS.
-
-
-
... More
SHORE SUPPLY CONNECTION BOX (ND-19743) MARINE ELECTRICALS SHIP ALONGSIDE BOX (EQP NO. 53711) MAINTOP NO- 53500 :
CARRY OUT FOLLOWING ON SCB AND BUS BARS:-
OVERHAULING OF BOTH SHORE SUPPLY CONNECTION BOX AND DE-CARBONISE THE BUS BAR. REPLACE BUS BAR INSULATORS OF BOTH THE SHORE SUPPLY CONNECTION BOX.
-
-
-
... More
ANCHOR WINDLASS,30HP MAKE-GRSE MOTOR-NARHARI, (MAINTOP NO-58349):
CHECK CONTACTS AND WIRING FOR WEAR/ DETERIORATION. RENEW THE DAMAGED CONTACTS AND WIRING . CARRY OUT COMPLETE OVERHAULING OF THE WINDLASS CONTROLLER PANEL . SATISFACTORY TRIALS TO BE OFFERED TO SHIP STAFF / TRIALS TEAM.
-
-
-
... More
CAPSTAN 30HP,MAKE-GRSE MOTOR-NARHARI, (MAINTOP NO-58349):
CHECK CONTACTS AND WIRING FOR WEAR/ DETERIORATION. RENEW THE DAMAGED CONTACTS AND WIRING . CARRY OUT COMPLETE OVERHAULING OF THE CAPSTAN CONTROLLER PANEL . SATISFACTORY TRIALS TO BE OFFERED TO SHIP STAFF/TRIALS TEAM.
-
-
-
... More
VENTILLATION DB 415V:
FRONT COVER OF 415V VENTILLATION DB LOCATED IN MAIN ALLEYWAY CORRODED. FABRICATION AND FITMENT OF NEW FRONT COVER FOR 415V VENTILLATION DB IS REQUIRED (DIMENSIONS 3'X1.5'X1', MATERIAL SS). WORK INVOLVES REMOVAL OF OLD DBs , REWIRING AND FITMENT OF REPAIRED NEW DBs.
-
-
-
... More
GENERAL LIGHTING :
INTERNAL RE-WIRING OF 230V DB(01 CORE, 04SQMM, 150 MTRs) IN MAIN PASSAGEWAYS AND COMPARTMENTS PERISHED VIEW FAIR WEAR AND TEAR. REWIRING OF GENERAL LIGHTING DBS IN MAIN PASSAGEWAYS AND COMPARTMENTS IS REQUIRED. WORK INVOLVES REMOVAL OF DBs, REWIRING AND FITMENT OF DBs.
-
-
-
... More
GENERAL LIGHTING :
DBs IN MAIN PASSAGEWAYS AND COMPARTMENTS PERISHED VIEW CORROSION. FABRICATION AND FITMENT OF GENERAL LIGHTING DBS IN MAIN PASSAGEWAYS AND COMPARTMENTS IS REQUIRED. (DIMENSIONS 1'X1.5'X1', MATERIAL SS). WORK INVOLVES REMOVAL OF OLD DBs, AND FITMENT OF NEW DBs.
-
-
-
... More
TRANSFORMER :
THE WINDING OF TRANSFORMER OF DECK ANGLE LIGHT (230V - 24V) PERISHED DUE TO FAIR WEAR AND TEAR. REWINDING OF THE TRANSFORMER IS REQUIRED. SCOPE OF WORK INCLUDES REMOVAL AND REFITMENT OF TRANSFORMER AND ASSOCIATED CONNECTIONS. SATISFACTORY TRIALS TO BE OFFERED.
-
-
-
... More
EMERGENCY CONNECTION BOXES,MANISH INDUSTRIES KOLKATA:
PHASE SEQUENCE OF EMERGENCY CABLE ARE NOT IN ORDER. RESTORATION OF PHASE SEQUENCE IN ALL THE OF EMERGENCY SUPPLY BOX IS REQUIRED.
-
-
-
... More
RHIB & GEMINI DAVIT CONTROL PANEL:
COMPONENTS OF RHIB AND GEMINI DAVIT CONTROL PANELS RENDERED OBSOLETE. REPLACEMENT OF COMPONENTS OF RHIB AND GEMINI DAVIT CONTROL PANELS TO BE CARRIED OUT AND SATISFACTORY TRIALS TO BE OFFERED.
(A) CONTACTOR - 02 (SIEMENS, AC THREE PHASE 30 AMPS)
-
-
-
... More
(B) TIME RELAY - 01(5 SEC TO 100 SEC,SIEMENS)
-
-
-
... More
(C) TRANSFORMER 415-110 - 01
-
-
-
... More
(D) TRANSFORMER 415-230 - 01
-
-
-
... More
(E) RECTIFIER 110VAC-110VDC - 01
-
-
-
... More
LIGHTING DISTRIBUTION BOX:
EARTH FAULT PROTECTION CIRCUIT OF ALL LIGHTING DBs ARE MALFUNCTIONING. REPAIR OF EARTH FAULT PROTECTION CIRCUIT. WORK INCLUDES TRACING OF CIRCUIT AND REPLACEMENT OF DEFECTIVE COMPONENTS AND SATISFACTORY TRIALS TO BE OFFERED. -100NOS
-
-
-
... More
RIB DAVIT CONTROL PANEL MAKE- SIEMENS :
FREQUENT DEFECTS OBSERVED FROM THE CONTROL CIRCUIT. CALIBRATION AND COMPLETE OVERHAULING OF CONTROL PANEL IS REQUIRED WITH ALL REQUIRED MATERIALS AND SATISFACTORY TRIALS TO BE OFFERED. DUE TO LONG LIFE OF EQUIPMENT, CHECK FOR PROPER TIGHTENING OF SEAL IN WATER TIGHT MODULES. REPLACE IF FOUND NOT HOLDING.
-
-
-
... More
GEMINI DAVIT CONTROL PANEL MAKE- SIEMENS :
FREQUENT DEFECTS OBSERVED FROM THE CONTROL CIRCUIT. CALIBRATION AND COMPLETE OVERHAULING OF CONTROL PANEL IS REQUIREDWITH ALL REQUIRED MATERIALS AND SATISFACTORY TRIALS TO BE OFFERED. DUE TO LONG LIFE OF EQUIPMENT, CHECK FOR PROPER TIGHTENING OF SEAL IN WATER TIGHT MODULES. REPLACE IF FOUND NOT HOLDING.
-
-
-
... More
SMB CONTROL PANEL:
FREQUENT DEFECTS OBSERVED FROM THE CONTROL CIRCUIT. CALIBRATION AND COMPLETE OVERHAULING OF CONTROL PANEL IS REQUIRED WITH ALL REQUIRED MATERIALS AND SATISFACTORY TRIALS TO BE OFFERED. - 04NOS
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements