GAIL India Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
GAIL India Limited - GAIL Tender
Energy, Oil and Gas
Eprocure
Opening Date11 Mar 2024
Closing Date12 Apr 2024
Tender Amount₹ 4,00,25,048 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 6,59,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GAIL_185932_1Bid Award Id
ViewTender No
GAIL/VIZP116516/ELECT/SOLAR POWER/2024Tender Authority
GAIL India Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of ROOF TOP SOLAR POWER SYSTEM OF 8.5 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS, PCUS/INVERTERS, DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender,PRESENT PREVAILING STANDARDS etc.,
8.5
-
-
Supply of ROOF TOP SOLAR POWER SYSTEM OF 8.5 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS, PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender,PRESENT PREVAILING STANDARDS etc.,
8.5
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5 KWP
GRID-TIED SYSTEM CONSISTING OF SOLAR
PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET
METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ
POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286,
standards mentioned in Tender,PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286,
standards mentioned in Tender,PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender,PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of ROOF TOP SOLAR POWER SYSTEM OF 5.0 KWP GRID-TIED SYSTEM CONSISTING OF SOLAR PANELS/ARRAYS,PCUS/INVERTERS,DCDBS,ACDBS AND OTHER ACCESSORIES WITH NET METERING ARRANGEMENT GRID SYNCHRONISATION IS AT 3 PHASE 220/ 440V AC, 50 HZ POLY CRYSTALLINE SILICON SOLAR CELL MODULES SHALL BE AS PER IEC 61215/ IS 14286, standards mentioned in Tender, PRESENT PREVAILING STANDARDS etc.,
1
-
-
Supply, Installation, Testing & Commissioning of Panel for accommodating the receipt of Solar Power 500 Kwp as per the tender specifications of tender document at dispatch terminal, Visakhapatnam. EXTENSION OF EXISTING L&T PMCC-301 Panel (Annexure-5) of Tender Document
1
-
-
PART-B: [BRIEF DESCRIPTION IS GIVEN BELOW; FOR DETAILED, REFER TENDER DOCUMENT]
-
-
-
Operation and Maintenance of Roof Top 200KWp Solar system for 1st Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 800 considering 200KW plant for 4 Quarters in a year [200x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
800
-
-
Operation and Maintenance of Roof Top 200KWp Solar system for 2nd Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 800 considering 200KW plant for 4 Quarters in a year [200x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
800
-
-
Operation and Maintenance of Roof Top 200KWp Solar system for 3rd Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 800 considering 200KW plant for 4 Quarters in a year [200x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
800
-
-
Operation and Maintenance of Roof Top 200KWp Solar system for 4th Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 800 considering 200KW plant for 4 Quarters in a year [200x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
800
-
-
Operation and Maintenance of Roof Top 200KWp Solar system for 5th Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms.
Qty. is mentioned as 800 considering 200KW plant for 4 Quarters in a year [200x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
800
-
-
Operation and Maintenance of Roof Top 300KWp Solar system for 1st Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 1200 considering 300KW plant for 4 Quarters in a year [300x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
1200
-
-
Operation and Maintenance of 300KWp Land Top Solar system at DT, Vizag, for 2nd Year. Operation and Maintenance of Roof Top 300KWp Solar system for 2nd Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms.
1200
-
-
Operation and Maintenance of Roof Top 300KWp Solar system for 3rd Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 1200 considering 300KW plant for 4 Quarters in a year [300x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
1200
-
-
Operation and Maintenance of Roof Top 300KWp Solar system for 4th Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 1200 considering 300KW plant for 4 Quarters in a year [300x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
1200
-
-
Operation and Maintenance of Roof Top 300KWp Solar system for 5th Year at DT, Vizag AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 1200 considering 300KW plant for 4 Quarters in a year [300x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
1200
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 1st Year at IP-1(VEDRUPAKA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter.
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 2nd Year at IP-1(VEDRUPAKA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 3rd Year at IP-1(VEDRUPAKA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 4th Year at IP-1(VEDRUPAKA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5 KWp Solar system for 5th Year at IP-1(VEDRUPAKA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 1st Year at SV-09 (GUMMAREGULA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 2nd Year at SV-09 (GUMMAREGULA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 3rd Year at SV-09 (GUMMAREGULA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5KWp Solar system for 4th Year at SV-09 (GUMMAREGULA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
Operation and Maintenance of Roof Top 8.5 KWp Solar system for 5th Year at SV-09 (GUMMAREGULA, ANDHRA PRADESH)AS PER THE TENDER DOCUMENT. However payment will be released on quarterly basis on installed capacity BASIS as per the tender document and as per the Part-B payment Terms. Qty. is mentioned as 34 considering 8.5 KW plant for 4 Quarters in a year [8.5x4] O&M/AMC. Thus, Bidders is required to quote O&M/AMC charges per KW per Quarter
34
-
-
PART-C: [BRIEF DESCRIPTION IS GIVEN BELOW; FOR DETAILED, REFER TENDER DOCUMENT]
-
-
-
Services -Design, Installation & Commissioning of 200KWp Solar system at GAIL,DT,VIZAG. 200 KWp ROOF TOP SOLAR POWER PLANT
200
-
-
Services -Design, Installation & Commissioning of 300KWp Solar system at GAIL,DT,VIZAG. 300 KWp LAND TOP SOLAR POWER PLANT
300
-
-
Services -Design, Installation & Commissioning of 8.5KWp SOLAR System at IP-01 (VEDRUPAKA, ANDHRA PRADESH) 8.5 KWp ROOF TOP SOLAR POWER PLANT
8.5
-
-
Services -Design, Installation & Commissioning of 8.5KWp SOLAR SYSTEM at SV-09 (GUMMAREGULA, ANDHRA PRADESH) 8.5 KWp ROOF TOP SOLAR POWER PLANT
8.5
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
9375
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Hire and running charges of Hydraulic Excavator (3D) with driver and fuel include cost of services of operating staff, Cost of lubricating oil, diesel / Petrol/ Kerosene oil , other consumables for running the plant and machinery, contractor’s profit and over heads etc. Note:-The hire charges of plant machinery on per day basis are for single shift of eight working hours.
10
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and
watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
1000
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Construction of granular sub-base (GSB) by providing close graded Material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
625
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including side shuttering , consolidation finishing and tamping complete as per specifications and directions of Engineer-in-Charge.
156.59
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
200
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size
200
-
-
CIVIL JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
3192
-
-
JOBS FOR 300 kwp LAND TOP POWER SYSTEM AT Despatch Terminal, Visakhapatnam. Follow up with respect to HSE Policy guidelines strictly from the Start to Finish of the Activity inside GAIL DT (Safety gadgets viz. Usage of all relevant standard PPEs by the workmen). Payment done on actual grounds based on the items procured for usage by the work men and retained by GAIL after completion of the work.
1
-
-