Fishery Survey Of India Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Fishery Survey Of India Tender

Services
GEM
Opening Date24 Jan 2025
Closing Date18 Feb 2025
Tender Amount₹ 4,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fire hose connection and fire man assistance is to be provided

-

-

-

... More
i)   Fire line shore main and maintaining pressure per hose per day

90

-

-

... More
ii) Connection & disconnection of hose per time per hose

2

-

-

... More
iii) Fire petrol per day of 8 hrs. shift per man

300

-

-

... More
Galley refuse removal and disposal as and when required

90

-

-

... More
Providing yard crane as and when required for material handling

4

-

-

... More
Shore supply connection is to be provided on arrival of the vessel

3

-

-

... More
i)  Vessel earthing connection / disconnection

1

-

-

... More
ii) Supply of 440 V AC, 50 Hz

23000

-

-

... More
Pilotage, Tug arrangements for taking the vessel in & out may be provided including VPT berth hire.

1

-

-

... More
Vessel is to be docked as per docking plan version.

1

-

-

... More
i)     Dock hire 1st day

1

-

-

... More
ii)   Dock hire subsequent days

59

-

-

... More
ii)   Dock floor cleaning 1st day

1

-

-

... More
iii) Dock floor cleaning subsequent days

59

-

-

... More
iv) Assisting for docking and Undocking the vessel

1

-

-

... More
v)   Wharfage / Wet basin charges

30

-

-

... More
vi) Mooring and line handling of vessel

2

-

-

... More
vii)  Un mooring and Line handling of vessel

2

-

-

... More
Scrubbing of marine growth and high pressure water jet washing of the underwater hull area (500 M2) and above hull area (250 M2).

-

-

-

... More
i)     Removal of marine growth by hard scrapping.

500

-

-

... More
ii)   Under water hull area & above water area by washing with high pressure water jet.

750

-

-

... More
The underwater and above water area is to be copper slag blasted with SA 2.5 standard and applied one coat of primer after cleaning the surface with air

-

-

-

... More
i)         Copper slag blasting SA 2.5 standard of underwater area

500

-

-

... More
ii)       Copper slag blasting SA 2.5 standard of above water area

250

-

-

... More
Ultra sonic gauging on under water (500 M2) and above water hull area (250 M2) is to be taken, as per the recommendations of the MMD surveyor.

-

-

-

... More
i)          UTG measurements

2000

-

-

... More
The underwater area steel plates are to be renewed as per the gauging report / as per the recommendations of MMD Surveyor.

-

-

-

... More
i)          Renewal of steel at various places

10

-

-

... More
The above water area steel plates are to be renewed as per the gauging report / as per the recommendations of MMD Surveyor

-

-

-

... More
i)          Renewal of steel at various places

8

-

-

... More
The Main deck, wheel house side deck, forecastle deck area steel plates are to be renewed as per the gauging report / as per the MMD Surveyor recommendations

-

-

-

... More
i)          Renewal of steel at various places

6

-

-

... More
The Underwater area is to be applied 05 coats of International epoxy paint scheme under the supervision of paint manufacturer. The DFT measurement are to be recorded after each coat of paint may be as follows (International Epoxy paints are to be procured by the shipyard)

-

-

-

... More
One coat of epoxy primer – 150 – 175 microns

-

-

-

... More
Two coats of coal tar epoxy – 150 – 175 microns each

-

-

-

... More
One coats of safe guard – 150 – 175 microns dry

-

-

-

... More
One coat of antifouling 200 - 250 Microns

-

-

-

... More
i)        Cleaning of underwater areas with fresh water before applying paint scheme

500

-

-

... More
ii)      Painting of underwater area – 5 coats

2500

-

-

... More
Above water area (250 M2) to be copper slag blasted (with SA 2.5 standard) and 04 coats of International quality epoxy paint scheme is to be applied under the supervision of the paint manufacture (Two coats epoxy primer and two coats of deep orange paint). International Epoxy paints are to be procured by the shipyard. The DFT measurement are to be recorded after each coat of paint may be as follows:

-

-

-

... More
Two coat of epoxy primer – 150 – 175 microns each

-

-

-

... More
Two coats of Deep Orange – 150 – 175 microns each

-

-

-

... More
i)        Cleaning of above water area with fresh water before applying paint scheme

250

-

-

... More
ii)      Painting of above water area – 4 coats

1000

-

-

... More
Draft marking, ships name, official number & line marking are to be painted.

-

-

-

... More
i)           Painting of Draft Markings

1

-

-

... More
ii)         Painting of Ship’s Name

1

-

-

... More
iii)       Painting of Official Number

1

-

-

... More
iv)       Line cutting / painting of white band

80

-

-

... More
All Zinc anodes (44 Nos.) are to be renewed (weight approximately 11 kg each). The Zinc anodes are to be procured and supplied by the Shipyard with 99.9% purity.

44

-

-

... More
Echo sounder transducers to be cleaned/ serviced.

2

-

-

... More
Remove and refit the fresh water / bilge / fuel tanks bottom drain plugs with lead washer and to be sealed with cement

24

-

-

... More
Main deck, Forecastle deck including bollards, Fair lead and net bin area (300 M2) is to be copper slag blasted and apply International quality epoxy paint. International Epoxy paints are to be procured by the shipyard. The paint scheme is as follows:

-

-

-

... More
Main deck & Net bin - Two coats of epoxy primer and two coats of Light Gray.

-

-

-

... More
Forecastle deck - Two coats of epoxy primer and two coats of deck green paint.

-

-

-

... More
i)           UTG (As per instructions of the Skipper)

600

-

-

... More
ii)         Steel renewal

3

-

-

... More
iii)       Copper slag blasting SA 2.5 Standard of above area

300

-

-

... More
iv)       Cleaning of above water area with fresh water before applying paint

300

-

-

... More
v)         Painting of Main Deck & forecastle deck - 4 coats

1200

-

-

... More
Gallows is to be copper slag blasted (30 M2) and apply International quality epoxy paint (Two coats of epoxy primer and Two coats of deep orange paint. (International Epoxy paints are to be procured by the shipyard).

30

-

-

... More
Fresh water tanks (03 Nos.) are to be chipped/ cleaned and cement washed. Tanks manhole coaming wherever necessary are to be renewed with new packing. The fresh water tanks to be pressure tested if any steel renewal carried out in the tanks. Deteriorated fresh water filling pipes & air vent pipes to be renewed (Total 49.5 M3).

-

-

-

... More
i)           Chipping, cleaning and cement wash to be carried out in fresh water tanks

3

-

-

... More
ii)         Removal and re-fitment of covers with new packing

3

-

-

... More
iii)       Pressure testing of tanks (if necessary for steel renewal in tanks)

3

-

-

... More
iv)       Damaged manhole coamings are to be renewed if necessary.

2

-

-

... More
Renewal of freshwater filling / air vent/ sounding pipe dia 65 MM / 50 MM / 40 MM schedule 40 / 80 are to be renewed wherever necessary.

-

-

-

... More
i)           Dia 65 MM Schedule 80

10

-

-

... More
ii)         Dia 50 MM Schedule 80

10

-

-

... More
iii)       Dia 40 MM Schedule 80

10

-

-

... More
iv)       MS flange dia 50 MM

10

-

-

... More
v)         100 mm dia CS sch 80 900 degree bends

10

-

-

... More
vi)       Renewal of tank sounding / filling caps dia 40 MM / 50 MM

8

-

-

... More
Port holes (15 Nos.) deteriorated plates are to be renewed. Rubber beadings are to be renewed and chalk test is to be carried out (12 MM X 10 MM – 30 Mtrs), rubber beadings are to be renewed. All damaged butter fly nuts (SS) are to be renewed.

-

-

-

... More
i)           Degutting / re-gutting port hole wooden box

10

-

-

... More
ii)         Renewal of rubber beading and butterfly nuts wherever necessary

15

-

-

... More
iii)       Chalk testing of port holes is to be carried out.

15

-

-

... More
iv)       Renewal of damaged portion of port holes

10

-

-

... More
Water tight doors (09 Nos.) corroded / damaged portion are to be repaired/ renewed, Rubber beading are to be renewed. Chalk test is to be carried out. (40 MM X 20 MM – 45 RMT)

-

-

-

... More
i)           Water tight doors damaged portion steel renewal

9

-

-

... More
ii)         Renewal of rubber beading

9

-

-

... More
iii)       Water tight door damaged handles to be renewed wherever necessary

9

-

-

... More
iv)       Chalk testing of port holes are to be carried out

9

-

-

... More
Fish hold hatch cover corroded/ damaged hinges, locking arrangement and butterfly nuts are to be repaired/ renewed and Rubber beading are to be renewed & chalk test is to be carried out.

-

-

-

... More
i)           Fish hold hatch cover (2 No.) rubber beading to be renewed

2

-

-

... More
ii)         Door hinges (06 Nos.) and locking system with butterfly nuts (08 Nos.) to be renewed

14

-

-

... More
iii)       Chalk test is to be carried out

2

-

-

... More
iv)       Manhole coaming & cover to be renewed if necessary.

3

-

-

... More
Anchor chain locker (P&S) sludge to be removed, cleaned and applied two coats of bituminous black paint.

-

-

-

... More
i)           Removing and disposing of sludge from the chain locker to shore dustbin

2

-

-

... More
ii)         Cleaning of anchor chain lockers (02 Nos.)

1

-

-

... More
iii)       Painting of anchor chain lockers (02 Nos.) – 2 coats each

1

-

-

... More
Anchor & Anchor chain (P&S) are to be calibrated, copper slag blasted and apply two coats of bituminous black paint. The Chains are to be renewed (if necessary as per calibration report). Shackles & swivels of both the anchor to be overhauled / serviced.

-

-

-

... More
i)           Ranging per cable in dock

2

-

-

... More
ii)         Blasting of anchor chain cable

1

-

-

... More
iii)       Calibration of anchor cables

2

-

-

... More
iv)       Changing of cable each length if required / as per calibration report

5

-

-

... More
v)         Overhauling of kenter shackles

11

-

-

... More
vi)       Overhauling of anchor swivel

2

-

-

... More
vii)     Marking of anchor cables

2

-

-

... More
viii)   Painting of cable

1

-

-

... More
ix)       Blasting of anchor

2

-

-

... More
x)         Painting of anchor

2

-

-

... More
xi)       Anchor shank & crown freed

2

-

-

... More
Anchor winch / windlass is to be serviced / overhauled and spurling pipes (P & S) are to be renewed.

-

-

-

... More
i)           Anchor chain sprocket (P & S) is to be renewed

2

-

-

... More
ii)         Renewal of ferodo brake bands & brake band brackets

-

-

-

... More
iii)       Renewal “A” brackets if necessary

2

-

-

... More
iv)       Anchor winch gear box body steel plates are to be renewed if necessary

300

-

-

... More
v)         Anchor winch shaft seals are to be renewed if dismantled the gearbox

2

-

-

... More
vi)       Anchor winch foundation frame is to be inspected if required frame is to be renewed along with the foundation bolts.

1

-

-

... More
vii)  Oil seals (04 Nos.) grease nipples (10 Nos.) and nut & bolts are to be renewed (As Required)

-

-

-

... More
Main Trawl winch is to be serviced / overhauled. The corroded / damaged portions are to be renewed. The Main trawl winch is to be removed from the vessel, dismantled and served as per the requirement.

1

-

-

... More
i)           The brake band & securing foundation frame corroded is to be renewed along with liners

2

-

-

... More
ii)         Net drum steel plate badly corroded is to be renewed.

1.5

-

-

... More
iii)       The main trawl winch foundation corroded / holed is to be renewed along with all foundation bolts.

2

-

-

... More
iv)       Leaking Hydraulic pipelines to be renewed (25 MM / 40 MM / 50 MM)

20

-

-

... More
v)         Main winch gear box body steel plates are to be renewed if necessary

1

-

-

... More
vi)       The leaking hydraulic manipulator is to be serviced.

1

-

-

... More
vii)     Trawl winch “A” brackets need to be strengthened / renewed

6

-

-

... More
Derrick goose neck foundation bolts are to be renewed, all pulley blocks to be serviced. Derrick pump oil leaking to be arrested/ serviced

-

-

-

... More
i)           All derrick pulleys blocks (7 Nos.) are to be serviced

7

-

-

... More
ii)         Derrick hydraulic motor / leaking direction control valve to be serviced

2

-

-

... More
iii)       Derrick load test is to be carried out with DG(S) approved agency and steel wire ropes to be renewed if required (Certificate may be issued).

1

-

-

... More
Damaged railings are to be renewed wherever necessary.

-

-

-

... More
i)           Renewal of railing pipe 40 MM dia

50

-

-

... More
ii)         Renewal of rod 24 MM

20

-

-

... More
Fish hold plate Freezer (P) fiber coating & Puff insulation to be removed and floor plate & rack to be renewed as per report of ultra-sonic gauging on completion of renewed fiber coating to be carried out.

-

-

-

... More
i)           Removal & Renewal of puff insulation 200 MM thick

44

-

-

... More
ii)         Removal and renewal of plywood paneling with wooden framing

44

-

-

... More
iii)       Removal and renewal of FRP coating 3 mm thick for steel renewal purpose

44

-

-

... More
iv)       Plate freezer compartment rubber beading is to be renewed

14

-

-

... More
v)         Repairing of freezer compartment door damaged plywood portion renewed

5

-

-

... More
vi)       Renewal of light fittings with water proof

11

-

-

... More
Main fish hold water leaking through T.V. hall. T.V hall fiber coating is to be removed, UTG gauging to be carried out and renew the plate as per gauging report. On completion of renewal fiber coating to be carried out.

-

-

-

... More
I.          TV hall

-

-

-

... More
i)           Removal / re-fixing of fiber coating

25

-

-

... More
II.       Galley

-

-

-

... More
i)           Galley hot plate removal / re-fixing

1

-

-

... More
ii)         Degutting / re-gutting of floor cement

9

-

-

... More
iii)         Degutting / re-gutting of galley cupboards if necessary

4

-

-

... More
II. 2nd Engineer Cabin

-

-

-

... More
ii)         Removal / re-fixing of venial flooring

9

-

-

... More
i)           Degutting / re-gutting of bulkhead panel to be carried out

11

-

-

... More
ii)         Degutting / re-gutting of floor cement

9

-

-

... More
iii)       Removal / re-fixing of bunks, table, cupboard etc.

9

-

-

... More
III. Officer’s Mesh Room

-

-

-

... More
i)           Degutting / re-gutting of dining table, benches and cupboard

4

-

-

... More
ii)         Degutting / re-gutting of bulkhead panel to be carried out

10

-

-

... More
iii)       Degutting / re-gutting of floor cement

6

-

-

... More
IV.  Officer’s Wash Room

-

-

-

... More
i)           Removal / refixing of tiles

4

-

-

... More
ii)         Degutting / re-gutting of floor cement

4

-

-

... More
iii)       Removal / renewal of western commode with flush tank

2

-

-

... More
V.        UTG gauging of deck area covered under (I, II & III)

100

-

-

... More
VI.     Main fish hold top degutting / re-gutting

-

-

-

... More
iv)       Removal / re-fixing of fiber coating

30

-

-

... More
v)         Removal / re-fixing of plywood

30

-

-

... More
vi)       Removal / re-fixing of puff insulation

30

-

-

... More
VII.   Renewal of plate as per UTG gauging report

4

-

-

... More
Crew cabin water leaking through Galley & passage floor plate. Galley & passage cement to be removed, UTG gauging to be carried out and plate to be renewed as per gauging report.

-

-

-

... More
i)           Galley & passage cement to be removed and renewed

2

-

-

... More
ii)         UTG gauging to be carried out

25

-

-

... More
iii)       Removal and renewal of tiles

6

-

-

... More
iv)       Plate to be renewed (if necessary as per gauging report).

2

-

-

... More
Skipper & Chief Engineer Gr-I cabin water leaking through window. Damaged rubber packing & deteriorated plate to be renewed.

-

-

-

... More
i)      Windows damaged rubber packing to be renewed.

20

-

-

... More
ii)    Damaged plate to be renewed.

50

-

-

... More
iii)  Degutting / re-gutting of cupboard

3

-

-

... More
Damaged navigational all round light two tier (Two red, one green, one white) is to be renewed.

4

-

-

... More
i)     Defective cable is to be renewed

50

-

-

... More
ii)   Damaged Water tight junction boxes

4

-

-

... More
iii)    All round light two tier (Two red, one green, one white)

4

-

-

... More
Corroded / damaged Navigational (P&S) light base & side steel plate is to be renewed.

300

-

-

... More
Ramp door bottom deteriorated plate is to be renewed

-

-

-

... More
i)        Deck wooden sheeting is to be removed

10

-

-

... More
ii)      UTG measurement is to be taken

15

-

-

... More
iii)    Steel plates are to be renewed as per the gauging report

1.5

-

-

... More
iv)    Damaged wooden planks if necessary are to be renewed

50

-

-

... More
Wheelhouse top deck (Monkey Deck) fibre coating is to be removed, UTG measurements are to be taken and renew plates as per the gauging report / as per the recommendations of MMD Surveyor

-

-

-

... More
i)     Fibre coating is to be removed

91

-

-

... More
ii)   UTG measurements

50

-

-

... More
iii) Renewal of steel

3

-

-

... More
iv) Degutting / re-gutting of bridge equipment for steel renewal

10

-

-

... More
v)   Degutting / re-gutting wooden panelling / ceiling

50

-

-

... More
vi) Degutting / re-gutting Spintex wool

50

-

-

... More
vii)  Fibre coating wheelhouse top deck

91

-

-

... More
viii) Degutting / re-gutting of Accommodation AC unit for steel renewal

1

-

-

... More
Damaged mast bottom portion at Wheelhouse top deck area to be renewed

-

-

-

... More
i)     Mast Pipe 200 MM dia schedule 125

3

-

-

... More
Damaged bollard is to be renewed (Size: 13” X 9.5”)

1

-

-

... More
Forecastle deck near Panama hole deteriorated plate to be renewed.

100

-

-

... More
Engine room entrance area water leaking through top plate is to be renewed

500

-

-

... More
Galley blower damaged duct GI is to be renewed (Size: 3” dia)

10

-

-

... More
Otter board (P & S) supporting plate and showl to be renewed

200

-

-

... More
The existing Marine RADAR(Make: Furuno, Model: FR-1510 DA, Type: RDP – 060, Range: 12 – 24 KN) not working is to be replaced with new RADAR. (Procurement, Installed and Commissioned).

1

-

-

... More
Wheelhouse top deck cable passing conduit pipe to be renewed

-

-

-

... More
i)        Degutting / re-gutting of cable

30

-

-

... More
ii)      Conduit pipe dia 2” schedule 80

5

-

-

... More
The Propeller shaft is to be withdrawn, dismantled all parts including CPP, cleaned, renew all seals and offered to Surveyor, MMD Visakhapatnam for inspection. As per the recommendations of the Surveyor carry out all repairs and offered to the Surveyor for final survey / inspection. On completion of the final survey the Propeller shaft is to be assembled and fitted onboard. The stern tube bushes (forward and aft) cleaned and clearance measurements are to be taken, chrome liners, seals etc. to be renewed. Propeller drop is to be measured & recorded. The propeller shaft MP test is to be carried out and propeller blade DP test is to be carried out. Propeller blades are to be made polishing and varnished.

-

-

-

... More
i)       The Propeller shaft is to be withdrawn, dismantled all parts including CPP are to be cleaned. The propeller and tail shaft survey is to be carried out.

1

-

-

... More
ii)     CPP system is to be serviced. Pitch control rod to be greased. Zero pitch is to be proved in the propeller at Engine room and wheel house.

1

-

-

... More
iii)   Propeller drop is to be recorded before dismantling & after assembling.

1

-

-

... More
iv)   Renewal of FWD and AFT seals including chrome liners

2

-

-

... More
v)     Removal, cleaning, painting and refitting with wire lasing of rope guard,

1

-

-

... More
vi)   Scrapping marine growth from propeller blades. polishing & varnishing

1

-

-

... More
vii) Propeller shaft MP test

1

-

-

... More
viii)DP Test to be carried out in the propeller blades

1

-

-

... More
Rudder is to be removed from its position for with drawl of propeller shaft for servicing. The rudder is to be cleaned / pressure tested and float coated. Rudder drop & jumping clearance are to be measured and recorded The same is to be offered to the MMD Surveyor for inspection. The rudder pintle and bush clearances are to be measured and recorded. Rudder Trunk to be cleaned and painted.

-

-

-

... More
i)       Removal and re fixing of Rudder.

1

-

-

... More
ii)     Pressure testing and float coating

1

-

-

... More
iii)   Rudder drop is to be measured and recorded

1

-

-

... More
iv)   Rudder jumping clearance is to be measured and recorded

1

-

-

... More
v)     The rudder pintle and bush clearances are to be measured and recorded.

1

-

-

... More
The following sea suction / overboard discharge / storm are to be dismantled, cleaned and offered to the Surveyor, MMD for inspection and necessary repairs are to be carried out as per the recommendations of the Surveyor. The valves are to assembled, pressure tested and fitted onboard.

-

-

-

... More
i)       Sea chest valves:

-

-

-

... More
a)       80 MM dia valves

4

-

-

... More
b)      65 MM dia valves

1

-

-

... More
c)       40 MM dia valves

2

-

-

... More
d)      32 MM dia valves

2

-

-

... More
e)       20 MM dia valves

2

-

-

... More
ii)     Overboard Discharge valves:

-

-

-

... More
a)       80 MM dia valves

2

-

-

... More
b)      65 MM dia valves

4

-

-

... More
c)       60 MM dia valves

1

-

-

... More
d)      50 MM dia valves

2

-

-

... More
iii)   Storm valves:

-

-

-

... More
a)       100 MM dia valves

3

-

-

... More
b)      50 MM dia valves

1

-

-

... More
iv)    Bilge suction valves 50 MM

15

-

-

... More
v)     Intermediate and Butterfly valves 50 MM

20

-

-

... More
vi)   Fire hydrant vales removal, servicing and refitment

2

-

-

... More
Sea chest gratings (02 Nos.) are to be removed, cleaned, Painted and fitted back with wire lasing.

2

-

-

... More
i)        Sea chest area to be cleaned (covered under underwater hull cleaning & painting)

-

-

-

... More
ii)     Application of painting (Size 400 x 600 MM) 05 coats

-

-

-

... More
Forward and Aft Bow thrusters are to be made operational. Both the bow thrusters blades to be buffed and varnished. Both the bow thrusters Sea chest gratings are be removed, cleaned painted and fitted back in its original position with wire lasing.

-

-

-

... More
i)       Bow thruster blades (F & A) are to be buffed & varnished

2

-

-

... More
ii)     Bow thruster gratings (F & A), removal, cleaning, painting & re-fitment.

2

-

-

... More
Main Engine gear box (Make: B & W alpha, Model: 20V016, S. No. 653-1) is not developing sufficient lube oil pressure. The gear box is to be overhauled and the required pressure to be proved, the overhauling is to be done by the authorized personal for B&W Alpha. The list of available spare parts will be submitted by FSI and balance spares required as per the OEM recommendations may be procured / Imported by the Shipyard.

1

-

-

... More
i)       Gear box lube oil low pressure alarm

1

-

-

... More
ii)     The pneumatic clutch engage / disengage mechanism is to be serviced.

1

-

-

... More
P.T.O gear box inspection door glass is leaking, the same to be rectified and also P.T.O engaging solenoid electrical connections to be secured and to be made water proof condition.

1

-

-

... More
Main Engine {Make: B & W Alpha, Model: 8V23 L: VO; Serial No.12824, No. of cylinders: 08 (V Type), CSR: 855 KW, 1160 HP, 800 RPM) / (ACR 910 KW, 1240 HP, 825 RPM) Make year – 1979} major overhauling is due. The Main Engine overhauling is to be carried under the supervision of OEM representative. The list of available spare parts will be submitted by FSI and balance spares required as per the OEM recommendations may be procured / Imported by the Shipyard.

1

-

-

... More
Main Engine safety alarms to be checked and proved for Survey i.e Emergency Trip, overload Trip, over speed trip, low lube oil alarm & trip, high fresh water temperature alarm and Emergency stop from wheel house to be serviced and proved.

-

-

-

... More
i)       Main Engine Emergency Trip

1

-

-

... More
ii)     Main Engine overload & Over Speed Trip

2

-

-

... More
iii)   Low lube oil pressure alarm & Trip

1

-

-

... More
iv)   High freshwater temperature alarm

1

-

-

... More
v)     Main Engine emergency trip from wheel house

1

-

-

... More
Main Engine starting air bottles are to be serviced and pressure tested.

-

-

-

... More
i)       Removal of air bottles, cleaning and pressure testing

2

-

-

... More
ii)     Servicing of relief valves

2

-

-

... More
iii)   Drain valves servicing and pressure testing

2

-

-

... More
Aux. Engine generators (105 KW each) are to be serviced and proved.

-

-

-

... More
i)       Megger values and Air gap readings are to be recorded after opening the generator terminal box and disconnecting the connections

2

-

-

... More
ii)     After cleaning the winding by blowing compressed air, Carbon and grease and other moisture material to be wiped out with sine cloth and Windings are to be cleaned with Orion 77 Electrical Safety Solvent Cleaner.

2

-

-

... More
iii)   Windings to be varnished and dry with external heaters.

2

-

-

... More
iv)   After fitting back the end covers clearance to be recorded and performance to be proved on load

2

-

-

... More
v)     AVR to be serviced / renewed

2

-

-

... More
vi)   The auxiliary engine rear oil seal is leaking is to be renewed

2

-

-

... More
The following compartment bilges are to cleaned, scraped and painted

-

-

-

... More
Engine room,

-

-

-

... More
Rudder Room,

-

-

-

... More
Fish hold and

-

-

-

... More
Sonar room

-

-

-

... More
i)       Scraping, cleaning and drying

88

-

-

... More
ii)     Application of 1 coat of paint

88

-

-

... More
iii)   Removal / disposal of mud

1.01

-

-

... More
iv)   Bailed out oil, sludge and mud from bilges

1.5

-

-

... More
The refrigeration system corroded pipelines are to be renewed. All system valves are to be serviced. On completion of repair / renewal the system is to be pressure tested, vacuumed, gas charging and commissioned (Freon gas supplied by the Ship staff ). All the safety cut outs / trips are to be serviced and made operational.

-

-

-

... More
i)       Existing Freon gas to be extracted into empty bottles

-

-

-

... More
ii)     System is to be pressure tested with Nitrogen gas, leaks are to arrested by renewal pipes wherever necessary, vacuum tested.

-

-

-

... More
iii)   System is to be flushed out

-

-

-

... More
iv)   Checking of all instruments i.e. expansion valves, solenoid valves, controls, pressure switches etc.

10

-

-

... More
v)     Servicing of system valves various size (1/4’’ to 02’’inch)

29

-

-

... More
vi)   Oil separator dismantling, cleaning and boxing up.

1

-

-

... More
vii) Pressure relief valve cleaning and calibration to be carried out

2

-

-

... More
viii) Fish hold evaporator coils to be degutted / re-gutted for fish hold steel renewal, if required

14

-

-

... More
viii)  Indigenous equivalent refrigeration compressor Make: Carrier / Kirloskar / voltas or any other approved brand is to be procured, installed and commissioned.

1

-

-

... More
The following safety alarms / cut outs of Ref. system are to be checked and proved:

-

-

-

... More
i)        HP / LP cut outs are to be checked / proved

2

-

-

... More
ii)      Blower trip switch to be proved

1

-

-

... More
iii)    Condenser pump failure trip is to be checked / proved.

1

-

-

... More
iv)    Differential cut out is to be checked / proved

1

-

-

... More
Main panel board to be serviced and low voltage / High voltage trip to be made operational. Not working instrumentation gauges are to be checked and renewed if necessary

-

-

-

... More
i)       Ammeter (0-300 Amps) to be is renewed

1

-

-

... More
ii)     Voltmeter (0-600 V) to be is renewed

1

-

-

... More
iii)   Frequency meter (45-50-55 Hz) to is be renewed

1

-

-

... More
iv)   KW / PF meter (10-0-100 KW), (1-0-10 DC) to is be renewed

1

-

-

... More
v)     Phase sequencer meter (50-500 V) , (25-60 Hz) is to be renewed

1

-

-

... More
vi)   Alternator Heater rotary switches are to be renewed

2

-

-

... More
vii) Governor control switches are to be renewed

2

-

-

... More
Fuel Transfer pump, Main Engine standby Lube oil pump, Main Engine standby Gear oil pump, Cargo ballast pump are not developing sufficient pressure, that four pumps are to be serviced and the performances of the same to be proved.

-

-

-

... More
i)       Fuel Transfer pump

1

-

-

... More
ii)     Main Engine standby Lube oil pump

1

-

-

... More
iii)   Main Engine standby Gear oil pump

1

-

-

... More
iv)   Cargo ballast pump

1

-

-

... More
Engine room blower, Galley exhausts blower and fish hold & freezer Room blowers to be serviced along with motors.

-

-

-

... More
i)     Engine room blower (5.5 KW)

1

-

-

... More
ii)   Galley exhausts blower (2.2 KW)

1

-

-

... More
iii) Accommodation blower (5.5 KW)

1

-

-

... More
iv) Fish hold blowers (2.2 KW)

3

-

-

... More
v)   Freezer Room blowers (2.2 KW)

1

-

-

... More
Diesel Tanks (07 Nos.) are to be cleaned, chemical washing and pressure tested (Total capacity: 65.5M3).

-

-

-

... More
i)     Removal and refitment of manhole cover

7

-

-

... More
ii)   Gas free inspection of tanks

7

-

-

... More
iii) Cleaning of tanks

7

-

-

... More
iv) Removal / disposal of oily water

1.5

-

-

... More
v)   Removal / disposal of Oil sludge

1.5

-

-

... More
vi) Pressure testing of tanks if necessary (if steel renewed)

-

-

-

... More
Ballast tank 04 Nos. are to be cleaned, and pressure tested.

-

-

-

... More
i)     Removal and refitment of manhole cover

4

-

-

... More
ii)   Cleaning of tanks

4

-

-

... More
iii) Removal / disposal of oily water

1

-

-

... More
iv) Removal / disposal of Oil sludge

1

-

-

... More
All tank air vents (14 Nos.) is to be removed, cleaned, serviced, painted and fitted.

-

-

-

... More
i)     Removal, servicing of air vents

14

-

-

... More
ii)   Hoods 65 MM dia (Mat- MS, SS wire mesh) to be serviced

14

-

-

... More
iii) Renewal of guard ( L x W x T = 220 MM x 130 MM x 3 MM) MS sheet

14

-

-

... More
All accommodation cabin light units, hanging cables, damaged switches and sockets to be renewed and serviced properly.(Preferred Light units checkless tube or Doom light units.

-

-

-

... More
i)       Light units

25

-

-

... More
ii)     Cables (2-core)

50

-

-

... More
iii)   Switch & sockets (16 A)

20

-

-

... More
Annual servicing & certification is to be carried out onboard CO2 system with IRS / MMD approved service agency:

-

-

-

... More
i)       Weighment of CO2 bottles capacity - 45 Kgs refilled if necessary

3

-

-

... More
ii)     Weighment of CO2 bottles capacity - 6.5 Kgs refilled if necessary

1

-

-

... More
iii)   Alarm and blower cut-off operation to be checked

1

-

-

... More
iv)   Pressure gauge range 0 to 250 Kg /CM2 to be calibrated

1

-

-

... More
Both the fresh water/sea water hydro-phore systems are to be serviced, Hydro-phore Tanks (02 Nos.) are to be cleaned and pressure Tested. Damaged pipelines are to be renewed. Necessary gauges and faulty switches are to be renewed.

-

-

-

... More
i)       Removal, cleaning, pressure testing and refitment of FW and SW hydrophore tanks

2

-

-

... More
ii)     Sight glasses are to be renewed

2

-

-

... More
iii)   Pressure gauges along with adopter are to be renewed

4

-

-

... More
iv)   Renewal of 32 MM dia CS sch 80 pipe

25

-

-

... More
v)     Renewal of 32 MM dia MS flanges

15

-

-

... More
vi)   Renewal of 32 MM sch 80 bends

10

-

-

... More
Engine room blower and Accommodation blower, Galley blower duct to be cleaned by compressed air and damaged section to be repaired.

120

-

-

... More
Quick shut off valves to be serviced and pressure tested.

5

-

-

... More
All corroded and damaged sea suction strainers and bilge strainers are to be replaced with stainless steel strainers

-

-

-

... More
i)     Main sea water strainer 80 MM dia

2

-

-

... More
ii)   Main sea water strainer 65 MM dia

2

-

-

... More
iii) Removal and refitment of bilge suction filter element 50 MM

2

-

-

... More
iv) Removal and refitment of bilge suction filter element 65 MM

1

-

-

... More
Engine room bilge suction lines forward, aft and bow thruster room lines to be opened, cleaned, painted, pressure tested and fitted back with new joints.

-

-

-

... More
i)     Engine room bilge suction lines forward & Aft

40

-

-

... More
ii)   Bow thruster Room lines

30

-

-

... More
Lighting Transformers (440 V/220 V, 20 KV, 52 Amps, 50 Hz) (2 Nos.) to be serviced.

2

-

-

... More
Accommodation A/C to be pressure tested, leaks are to be rectified, vacuum tested and gas charged. The present condenser deteriorated badly need to be renewed as per sample.

-

-

-

... More
i)         Accommodation AC pressure testing, vacuum testing to be carried out

1

-

-

... More
ii)       Defective pipeline renewal

20

-

-

... More
iii)     AC condenser & Receiver unit to be renewed (badly damaged)

1

-

-

... More
iv)     Valves to be serviced

8

-

-

... More
v)       Indoor units are to be cleaned

8

-

-

... More
Pumps suction and discharge pressure gauges in engine room, all corroded / deteriorated pressure gauges with pipeline are to be removed, renewed with new gauges including copper pipe lines in engine room and compressor room.

-

-

-

... More
i)        Copper pipe line 8 MM dia to be renewed

38

-

-

... More
ii)      Brass reducer brass remitto couplings dia 15 MM X 8 MM to be renewed

30

-

-

... More
iii)    Brass cocks 15 MM dia to be renewed

15

-

-

... More
vi)    Pressure gauges (0 to 7 Kg) suction & discharge to be renewed

15

-

-

... More
vii)  3/8” X 8 MM brass adaptors to be renewed

15

-

-

... More
Main deck “U-glass” fittings AC /DC (14 Nos.) corroded / damaged are to be renewed with water proof fittings

-

-

-

... More
i)       Renewal of water tight rotary switches 10 Amps, 2 Pole

5

-

-

... More
ii)     Renewal of foundations for above rotary switches Nos.

5

-

-

... More
iii)   Renewal of foundation for U-glass fittings

14

-

-

... More
iv)   Renewal of damaged U glass fitting

6

-

-

... More
Leaking and corroded Sea water/fresh water pipe lines in Engine room and deck part to be renewed

-

-

-

... More
Aux. Engine sea water pipeline (below floor)

-

-

-

... More
Port Side

13

-

-

... More
i)             CS pipeline sch. 80 Dia 50 MM

2

-

-

... More
ii)           CS pipeline sch. 80 Dia 80 MM

4

-

-

... More
iii)         CS pipeline sch. 80 Dia 40 MM

4

-

-

... More
iv)         CS pipeline sch. 80 Dia 15 MM

3

-

-

-

-

-

... More
i)             CS pipeline sch. 80 Dia 20 MM

6

-

-

... More
ii)           CS pipeline sch. 80 Dia 50 MM

6

-

-

... More
Main Engine sea water (discharge pipeline)

-

-

-

... More
i)             CS pipeline sch. 80 Dia 80 MM

20

-

-

... More
Main Engine sea water (suction pipeline) below floor

-

-

-

... More
i)             CS pipeline sch. 80 Dia 80 MM

10

-

-

... More
ii)           CS pipeline sch. 80 Dia 60 MM

6

-

-

... More
iii)         CS pipeline sch. 80 Dia 80 MM short bend

15

-

-

... More
iv)         CS pipeline sch. 80 Dia 65 MM short bend

5

-

-

... More
Engine room fresh water pipeline (below floor)

-

-

-

... More
i)             CS pipeline sch. 80 Dia 40 MM

21

-

-

... More
Bilge pipelines in fish hold (below floor)

-

-

-

... More
i)             CS pipeline sch. 80 Dia 65 MM

10

-

-

... More
ii)           CS pipeline sch. 80 Dia 50 MM

20

-

-

... More
iii)         CS Flange 65 MM

8

-

-

... More
iv)         CS Flange 50 MM

28

-

-

... More
v)           Short bend 65 MM

11

-

-

... More
vi)         Short bend 65 MM

12

-

-

... More
Main deck hand pump bilge pipeline

-

-

-

... More
i)             CS pipeline sch. 80 Dia 65 MM

6

-

-

... More
ii)           CS flange 65 MM

4

-

-

... More
iii)         Short bend 65 MM

3

-

-

... More
Engine room OBD pipeline (below floor)

-

-

-

... More
i)             CS pipeline sch. 80 Dia 80 MM

9

-

-

... More
ii)           CS pipeline sch. 80 Dia 65 MM

5

-

-

... More
iii)         CS pipeline sch. 80 Dia 50 MM

4

-

-

... More
iv)         CS pipeline sch. 80 Dia 40MM

5

-

-

... More
v)           CS flange 80 MM

4

-

-

... More
vi)         CS flange 65 MM

6

-

-

... More
vii)       CS flange 50 MM

4

-

-

... More
viii)     Short bend 80 MM

4

-

-

... More
Main deck fire main system pipelines

-

-

-

... More
i)            CS pipeline sch. 80 Dia 65 MM

18

-

-

... More
ii)          CS pipeline sch. 80 Dia 65 MM

10

-

-

... More
iii)        CS flange 65 MM

10

-

-

... More
iv)        CS flange 50 MM

10

-

-

... More
v)          Short bend 65 MM

5

-

-

... More
vi)        Short bend 50 MM

4

-

-

... More
Cargo ballast pump sea water pipes (below floor)

-

-

-

... More
i)           CS pipeline sch. 80 Dia 80 MM

5

-

-

... More
Fish hold fresh water pipeline (below floor & Fwd)

-

-

-

... More
i)          CS pipeline sch. 80 Dia 40 MM

40

-

-

... More
ii)        CS pipeline sch. 80 Dia 25 MM

3

-

-

... More
iii)      MS flange for pipe dia 40 MM

30

-

-

... More
iv)      CS sch. 80 Short bend for pipeline dia 40 MM

15

-

-

... More
Fish hold bilge pipeline (below floor)

-

-

-

... More
i)           CS pipeline sch. 80 Dia 50 MM

3

-

-

... More
Main deck officer washroom fresh water pipeline

-

-

-

... More
i)           CS pipeline sch. 80 Dia 40 MM

3

-

-

... More
ii)         CS pipeline sch. 80 Dia 16 MM

5

-

-

... More
iii)       MS flange for pipe dia 40 MM

4

-

-

... More
Main deck sanitary pipeline:

-

-

-

... More
i)           CS pipeline sch. 80 Dia 100 MM

7

-

-

... More
ii)         CS pipeline sch. 80 Dia 25 MM

1

-

-

... More
Bilge hand pump pipeline

-

-

-

... More
i)           CS pipeline sch. 80 Dia 65MM

1

-

-

... More
PTO cooler sea water pipe line

-

-

-

... More
i)           CS pipeline sch. 80 Dia 40MM

10

-

-

... More
ii)         Condenser sea water pipeline (Engine Room)

-

-

-

... More
iii)       C.S. sch 80 pipe dia 50MM

1.5

-

-

... More
iv)       C.S. sch 80 pipe dia 65 MM

38

-

-

... More
v)         C.S. sch 80 pipe dia 32 MM

5

-

-

... More
vi)       C.S sch80 ,90 deg bends dia 65 MM

20

-

-

... More
vii)     C.S sch80 ,90 deg bends dia 80 MM

4

-

-

... More
Hydraulic pipe (Anchor winch)

-

-

-

... More
i)        20 MM OD S.S. Pipe sch.80

4

-

-

... More
Bilge system pipe in Engine room(below floor)

-

-

-

... More
i)           50mm dia C.S sch 80 pipe

30

-

-

... More
ii)         80mm dia C.S sch 80 pipe

3

-

-

... More
iii)       65mm dia C.S sch 80 pipe

5

-

-

... More
iv)       50mm dia sch 80 CS 90 deg bends

30

-

-

... More
v)         80mm dia sch 80 CS 90 deg bends

2

-

-

... More
vi)       65mm dia sch 80 CS 90 deg bends

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.