Dredging Corporation Of India Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Dredging Corporation Of India Limited - DCI Tender

Services
Machinery and Tools
Eprocure
Opening Date27 Dec 2022
Closing Date13 Feb 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
A) For the Repairs entrusted on cost plus basis, payment shall be made as under, subject to the condition that the overall cost claimed is considered reasonable by the Corporation:

-

-

-

... More
i) Quantum of the Materials and labour used for completion of a particular work must be reflected in the Work Done Certificate(WDC). If any materials procured for completion of a particular work, same must be reflected in the (WDC) and connected supporting proof of payment Vouchers /bills must be enclosed for material procured over Rs.10,000/- Which are incorporated in the work:

-

-

-

... More
ii) 10% extra on actuals towards handling, transportation, Storage and other incidental charges, over head charges etc., will only be paid (not negotiable)

-

-

-

... More
iii) Taxes (Service tax/ GST) as applicable shall be paid.

-

-

-

... More
B) Cost of labour inclusive of all overheads & Profits etc., directly employed on the work as reflected in the work done Certificates  NORMAL WORKING HOURS i.e. 8 AM – 5 PM):

-

-

-

... More
i) Skilled labour per manday of 8 hours Rs: -

-

-

-

... More
ii) Unskilled labour per Man-day of 8 hours Rs: -

-

-

-

... More
iii) *Specialist/ *Engineer per man day of 8 hours Rs: -

-

-

-

... More
iv) Technician per man day of 8 hours Rs: -

-

-

-

... More
C) Overtime on Schedule-I (on labour only) (Sundays, Holidays & beyond normal working hours): 30 % (Eg. Normal 8 Hrs= 100%, Overtime 8 Hrs = 130%, Proportionate for part OT Hrs)

-

-

-

... More
% on Schedule III : 30 % (On labour component as indicated in Annexure – A)

-

-

-

... More
Note: 1)* Specialist may be engaged by the repair firms for the specialized jobs only under prior written approval of Local P.O / H.O Officials. 2) Number of skilled and un-skilled workers engaged in normal and overtime hours on each day should be indicated clearly in work done completion certificate. 3) 5% extra towards Port & Dock permits and formalities will only be paid- When Vessel berths at Port/Repair Yard etc. (for only on basic labour cost of Sch-I & III) (not negotiable)

-

-

-

... More
D) Terms & Conditions No payments will be allowed separately towards the following, as all these expenses shall be deemed to have been included in the rates quoted above.

-

-

-

... More
1) Salaries of indirect labour such as Supervisors, Engineers, Administration Staff etc.

-

-

-

... More
2) Operational cost of Machine and equipment

-

-

-

... More
3) Provident fund, Gratuity, ESI and all other allowances/ Benefits to labour, statutory or otherwise :

-

-

-

... More
4) Liability under workmen’s Compensations Act and the labour regulations :

-

-

-

... More
5) Cost of indirect Material :

-

-

-

... More
6) Transportation of men and materials. :

-

-

-

... More
7) Lodging and Boarding charges. :

-

-

-

... More
8) Transportation charges (including loading and unloading) will be allowed in a separate defect list cum work order in case of an item, which weights more than one Ton.

-

-

-

... More
9) Sub-contracting of any job other than quoted will be allowed with prior approval of the Corporation. In such cases, bill will be paid on the basis of Sub-Contractors invoice subject to reasonableness & on production of Original bill of sub-contractor/ supporting proof of certified payment Vouchers/ bills, plus 10% towards overhead/handling and others Incidentals. No other charges will be allowed. :

-

-

-

... More
10) The repair firm should also maintain proper accounts, records indicating costs incurred on each job to enable the Officers of the Corporation to verify the records, if considered necessary the Corporation reserves the right to settle the claims finally as considered reasonable. :

-

-

-

... More
SCHEDULE – II

-

-

-

... More
FOR OTHER PLACES (Applicable for all items of Rate Schedule)

-

-

-

... More
1. a) Place of basic rates quoted for : At PORT/PORTS ___________________ (No extra % will be applicable for Base Port/Ports)

-

-

-

... More
b) Other Ports/Places: (To be quoted on % basis over and above as quoted at (a). If no rate quoted for other places/Ports, a flat rate of 15% extra will be paid over and above quoted at (a) towards works carried out at other Ports, including new Dredging Projects at Places/Ports which are not listed below). Note: Once repair firms quoted for Other Ports/Places, then that repair firm has to attend repairs of dredger without fail as per advice/direction of DCI.

-

-

-

... More
c) Extra percentage will be applicable on basic rates of Sch-III and on basic cost of labour of Sch-I.

-

-

-

... More
OTHER PLACES/Port

-

-

-

... More
MUMBAI

-

-

-

... More
KANDLA

-

-

-

... More
GOA

-

-

-

... More
HALDIA

-

-

-

... More
KOLKATA

-

-

-

... More
KOCHI

-

-

-

... More
MANGALORE

-

-

-

... More
KARWAR

-

-

-

... More
VISAKHAPATNAM

-

-

-

... More
KAKINADA

-

-

-

... More
PARADIP

-

-

-

... More
CHENNAI

-

-

-

... More
ENNORE

-

-

-

... More
PONDICHERRY

-

-

-

... More
TUTICORIN

-

-

-

... More
HAZIRA

-

-

-

... More
NAGAPATNAM

-

-

-

... More
RAMESHWARAM

-

-

-

... More
GOGHA

-

-

-

... More
DHABOL

-

-

-

... More
RAMAYYAPATNAM

-

-

-

... More
KRISHNAPATNAM

-

-

-

... More
MACHILIPATNAM

-

-

-

... More
KAKINADA

-

-

-

... More
2. (a) Extra for doing work in double banking vessel:- 5 % on labour Cost (Sch-I & III)

-

-

-

... More
(b) Extra for doing work when Vsl is operating in stream/Anchorage-10% on labour Cost (Sch-I & III)

-

-

-

... More
3. Extra percentage for other places is not applicable for the items manufactured, at the base project and same supplied to Vessel at other Port/ places. However, the actual expenditure incurred towards transportation/connecting of the finished product shall be payable on production of copy of documentary proof.

-

-

-

... More
Note: - Above 2 (a) and (b) are applicable for Schedule I & III labour component only.

-

-

-

... More
SCHEDULE – III

-

-

-

... More
(Scheduled items of Repair)

-

-

-

... More
01 – 01 = Decarbonisation / Overhaul of Engines

-

-

-

... More
01 – 02 = Ancillary Repair works for Diesel Engines

-

-

-

... More
02 – 01 = H.E & Coolers for Diesel Engines

-

-

-

... More
03 – 01 = Centrifugal Sea Water/ Fresh Water Pumps

-

-

-

... More
04 – 01 = Gear pumps

-

-

-

... More
05 – 01 = Dredge / Sand Pumps

-

-

-

... More
06 – 01 = Jet pumps

-

-

-

... More
07 – 01 = Sea Suction & Discharge Valves

-

-

-

... More
08 – 01 = Hyd. Operated sluice / butterfly valves (Mechanical Works)

-

-

-

... More
09 – 01 = Drag Heads

-

-

-

... More
10 – 01 = Hydraulic Cylinders.

-

-

-

... More
11 – 01 = Wind lasses.

-

-

-

... More
12 – 01 = Sheaves & Pulleys

-

-

-

... More
13 – 01 = Renewal G.I Pipes

-

-

-

... More
14 – 01 = Renewal of Scheduled/Solid drawn Pipes

-

-

-

... More
15 – 01 = Steel Renewals

-

-

-

... More
16 – 01 = Metal Building / Reconditions of Heavy items

-

-

-

... More
17 – 01 = A.C Motors / Generators

-

-

-

... More
18 – 01 = D.C Generators / Motors

-

-

-

... More
19 – 01 = Alternators

-

-

-

... More
20 – 01 = All types of Couplings

-

-

-

... More
21 – 01 = Hydraulic Winches & Gear Boxes.

-

-

-

... More
22 – 01 = Sand Pump and Jet Pump, Suction and Discharge Pipes

-

-

-

... More
23 – 01 = Electrical miscellaneous works

-

-

-

... More
24 – 01 = A/C & Refrigeration works

-

-

-

... More
25 – 01 = Make & Supply items (MS, SS, CS)

-

-

-

... More
26 – 01(A) = Servicing of Life Boats

-

-

-

... More
26 – 01(B) = Servicing of Life Rafts

-

-

-

... More
27 – 01 = CO2 Cylinders & Fire Extinguishers.

-

-

-

... More
28 – 01 = All Gantries

-

-

-

... More
29 – 01 = Tank Cleaning

-

-

-

... More
30 – 01 = Electronic, Pneumatic etc.services.

-

-

-

... More
31 – 01 = OEM Services for ME/AE Fuel pumps & Controls.

-

-

-

... More
32 – 01 = OEM Services to systems- Hydraulics

-

-

-

... More
SCHEDULE – III Annexure – A

-

-

-

... More
Overtime-regulated on Schedule – III items on Labour Component basis as appended below: (Non-Negotiable)

-

-

-

... More
Sch-III Item Description Applicable percentage on labour Item ref: component

-

-

-

... More
01–01 Decarbonisation / Overhaul of Engine 85%

-

-

-

... More
01 – 02 Ancillary Repair Works for Diesel Engines 85%

-

-

-

... More
02 – 01 Heat Exchangers / Coolers for Diesel Engines 85%

-

-

-

... More
03 – 01 Centrifugal Water Pumps 60%

-

-

-

... More
04 – 01 Gear Pumps 60%

-

-

-

... More
05 – 01 Dredge / Sand pumps 75%

-

-

-

... More
06 – 01 Jet Pumps 70%

-

-

-

... More
07 – 01 Sea suction / discharge valves 75%

-

-

-

... More
08 – 01 Hyd.Operated Sluice/butterfly v/v’s (Mech. Works) 80%

-

-

-

... More
09 – 01 Drag Heads 70%

-

-

-

... More
10 – 01 Hydraulic Cylinders 60%

-

-

-

... More
11 – 01 Wind lasses 60%

-

-

-

... More
12 – 01 Sheaves & pulleys 60%

-

-

-

... More
13 – 01 G.I. Pipes 60%

-

-

-

... More
14 – 01 Sch/Solid Drawn Pipes 70%

-

-

-

... More
15 – 01 Steel Renewals 60%

-

-

-

... More
16 – 01 Metal Building / Recondition of Heavy items 65%

-

-

-

... More
17 – 01 A.C Motors (Stators & Rotors) 50%

-

-

-

... More
18 – 01 D.C Generators & Motors 75%

-

-

-

... More
19 – 01 Alternators 60%

-

-

-

... More
20 – 01 All types of Couplings 80%

-

-

-

... More
21– 01 Hyd. Winches & Gear Boxes 50%

-

-

-

... More
22 – 01 Sand Pump & Jet Pump, Suction & discharge Pipes 60%

-

-

-

... More
23 – 01 Electrical Miscellaneous works 60%

-

-

-

... More
24 – 01 A/C & Refrigeration Works 75%

-

-

-

... More
25 – 01 Make & Supply Items (MS,SS,CS) 50%

-

-

-

... More
26 – 01 Servicing of Life Rafts Nil

-

-

-

... More
27 – 01 CO2 Cylinders & Fire Extinguishers 75%

-

-

-

... More
28 – 01 All Gantries 80%

-

-

-

... More
29 – 01 Tank Cleaning 95%

-

-

-

... More
30 – 01 Electronic Pneumatic Equipment.

-

-

-

... More
31 – 01 Service of AE/ME Fuel Pumps

-

-

-

... More
32 – 01 OEM Services- hydraulics

-

-

-

... More
Special Terms / Rates

-

-

-

... More
1. High Pressure Fresh Water Jetting (150 BAR or More) rate/Sq.M

-

-

-

... More
2. Supply of Mn Steel plate for false plate – per Kg of finished Product As per Schedule 25-01

-

-

-

... More
a) Ship supply per Kg:

-

-

-

... More
b) Work Shop Suppl1y per Kg:

-

-

-

... More
4. Building up of impeller with E-104 or its equalant electrodes (Inclusive of cost of electrodes) – Per Kg. of electrodes used. Rate: As per Schedule 16-01

-

-

-

... More
5. Gauging of the complete sand pump casing by UT Gauge (inclusive of supply of drawings) As per Schedule 15-01

-

-

-

... More
6. Building up of sand pump casing with E-104 / BorB/ equivalent electrodes – per Kg. of electrodes used Rate: (Inclusive of cost of electrodes) As per Schedule 16-01

-

-

-

... More
7. Power supply 10% of basic rate of schedule-I & III as indicated in case power is not supplied by DCI and when the work is not done at firms work shop/ site. 10% of total bill Value

-

-

-

... More
Note: L= Labour, M= Materials & C+ = Cost Plus

-

-

-

... More
01 – 01 DECARBONISATION OF VARIOUS IC ENGINES OF MAKE: MAN/WARTSILA/ CUMMINS/CATERPILLAR ETC., (QUOTE TO BE BASED ON KW PER UNIT)

-

-

-

... More
10-25 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
Above 25 KW Upto 50 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
Above 50 KW Upto 100 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
Above 100 KW Upto 300 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
Above 300 KW Upto 600 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
Above 600 KW Upto 900 KW PER UNIT

-

-

-

... More
A.a) Removal and replacement of all connections (such as inlet, Exhaust manifold, lub oil, fuel oil, cooling water pipes and air pipes, As required for decarburization of Engines-LS) :

-

-

-

... More
b) Removal and replacement of one piston and one set piston rings

-

-

-

... More
c) Taking out one piston from connecting rod and examining and measuring gudgeon pins and bush clearances and reassembly.

-

-

-

... More
d) Overhauling cylinder heads, valve seat grinding, reassembling Components after repair / renewal each unit of cylinder head.

-

-

-

... More
e) Calibration of cylinder liner one number

-

-

-

... More
f) Calibration of piston one number

-

-

-

... More
g) Removal and replacement of one set of crank pin bearing and crank pin gauging.

-

-

-

... More
B. Inspection of gear train-backlash, pitting and corrosion, bearing clearance of gear shaft to record.

-

-

-

... More
C. Removal and replacement of one number cylinder liner (cleaning and painting of liner and block and lapping cylinder liner)

-

-

-

... More
D. Removal of one set of main bearings and checking of clearance and re-assembling.

-

-

-

... More
E. Engine trial as required by Surveyor / C.E.O

-

-

-

... More
F. One number cylinder head to be taken out from vessel to workshop. All valves are to be removed, valve seat to renew, valve to lap with valve seat, valve guide to renew, Cylinder head parts to assemble, pressure test on completion of overhauling. Same are to be delivered on board Dredger.

-

-

-

... More
01-02 ANCILLARY REPAIR WORKS FOR DIESEL ENGINES

-

-

-

... More
Description of work

-

-

-

... More
Engine upto 225 KW

-

-

-

... More
1. Transporting cylinder head (1 no) to workshop, dismantling, lapping of valves, seats, assembling and handing over to ship after pressure testing up to 6 bar including chemical cleaning (Chemical Ship supply). Note: In case of Mono block cylinder head, payment will be made considering total number of units as number of cylinder heads (Ex: A mono block cylinder head of 6 unit engine will be considered as 6 cylinder heads).

-

-

-

... More
2.Removal of Fuel Pump for repairs, over haul with ship’s spares, Calibration and fitting back for Mono Block type PPs

-

-

-

... More
a) 4 elements PPs

-

-

-

... More
b) 5 elements PPs

-

-

-

... More
c) 6 elements PPs

-

-

-

... More
d) 8 elements PPs

-

-

-

... More
e) 12 elements PPs

-

-

-

... More
3.Removal of fuel injectors overhauling and testing and fitting back (Spares Ship Supply) Rate per Injector

-

-

-

... More
4. a) Complete Turbocharger (MAN /Wartsila/Cummins/Caterpillar make, models: NA/NT/NR) to be dismantled, over-hauled, worn-out parts to renew with ships spares, assembled and to show satisfactory trials to ship staff/surveyor, if required. Surveyor fee DCI head. O/H- Rate per Turbocharger. Incl. All clearances to check, record & show as per Manual.

-

-

-

... More
b) Dynamic balancing of Rotor (Extra Cost to (a) above)

-

-

-

... More
5. Taking of Pistons to Work shop necessary repairs to be carried out. Under Class Surveyors supervision, if required. (Survey fee to DCI a/c). Rate/Piston

-

-

-

... More
6.Removing of attached LO pump from Engine, dismantling of same and showing to Surveyor, if required. ( surveyor fee DCI account) Reassembling and boxing up of same Rate per pump.

-

-

-

... More
7. Main and sand pump engine pedestal bearing. Inspection if required renewal of bearing/ liner (Spares ships supply). Complete bearing renewal and alignment as required. Rate per Bearing.

-

-

-

... More
8. a) Removing and re-lagging (with new material) of exhaust manifold exhaust pipes of main Engine/Aux. Engine with Heat resistive material up to 600 0 C (minimum) Rate per Sq. Meter (50 mm thick) including material cost

-

-

-

... More
b) Renewal of GI sheeting to exhaust manifold of Main engine / Aux. engine. Rate per Sq. Meter Quote (including Material) Rs:

-

-

-

... More
9.Attached pump removal from engine, dismantling, presenting for survey, assemble with ship supply spares and fitting back to the engine. (Repairs if any extra).

-

-

-

... More
a) Fresh Water

-

-

-

... More
b) Sea Water

-

-

-

... More
10. Checking of alignment of complete Engine with gearbox after disconnecting the coupling and coupling to fit back after rectification/ repairs if any (Note: Rectification/Repairs will be extra for all items above.)

-

-

-

... More
Engine Above 225 KW upto 500 KW

-

-

-

... More
1. Transporting cylinder head (1 no) to workshop, dismantling, lapping of valves, seats, assembling and handing over to ship after pressure testing up to 6 bar including chemical cleaning (Chemical Ship supply). Note: In case of Mono block cylinder head, payment will be made considering total number of units as number of cylinder heads (Ex: A mono block cylinder head of 6 unit engine will be considered as 6 cylinder heads).

-

-

-

... More
2.Removal of Fuel Pump for repairs, over haul with ship’s spares, Calibration and fitting back for Mono Block type PPs

-

-

-

... More
a) 4 elements PPs

-

-

-

... More
b) 5 elements PPs

-

-

-

... More
c) 6 elements PPs

-

-

-

... More
d) 8 elements PPs

-

-

-

... More
e) 12 elements PPs

-

-

-

... More
3.Removal of fuel injectors overhauling and testing and fitting back (Spares Ship Supply) Rate per Injector

-

-

-

... More
4. a) Complete Turbocharger (MAN /Wartsila/Cummins/Caterpillar make, models: NA/NT/NR) to be dismantled, over-hauled, worn-out parts to renew with ships spares, assembled and to show satisfactory trials to ship staff/surveyor, if required. Surveyor fee DCI head. O/H- Rate per Turbocharger. Incl. All clearances to check, record & show as per Manual.

-

-

-

... More
b) Dynamic balancing of Rotor (Extra Cost to (a) above)

-

-

-

... More
5. Taking of Pistons to Work shop necessary repairs to be carried out. Under Class Surveyors supervision, if required. (Survey fee to DCI a/c). Rate/Piston

-

-

-

... More
6.Removing of attached LO pump from Engine, dismantling of same and showing to Surveyor, if required. ( surveyor fee DCI account) Reassembling and boxing up of same Rate per pump.

-

-

-

... More
7. Main and sand pump engine pedestal bearing. Inspection if required renewal of bearing/ liner (Spares ships supply). Complete bearing renewal and alignment as required. Rate per Bearing.

-

-

-

... More
8. a) Removing and re-lagging (with new material) of exhaust manifold exhaust pipes of main Engine/Aux. Engine with Heat resistive material up to 600 0 C (minimum) Rate per Sq. Meter (50 mm thick) including material cost

-

-

-

... More
b) Renewal of GI sheeting to exhaust manifold of Main engine / Aux. engine. Rate per Sq. Meter Quote (including Material) Rs:

-

-

-

... More
9.Attached pump removal from engine, dismantling, presenting for survey, assemble with ship supply spares and fitting back to the engine. (Repairs if any extra).

-

-

-

... More
a) Fresh Water

-

-

-

... More
b) Sea Water

-

-

-

... More
10. Checking of alignment of complete Engine with gearbox after disconnecting the coupling and coupling to fit back after rectification/ repairs if any (Note: Rectification/Repairs will be extra for all items above.)

-

-

-

... More
Engine Above 500 KW upto 750 KW

-

-

-

... More
1. Transporting cylinder head (1 no) to workshop, dismantling, lapping of valves, seats, assembling and handing over to ship after pressure testing up to 6 bar including chemical cleaning (Chemical Ship supply). Note: In case of Mono block cylinder head, payment will be made considering total number of units as number of cylinder heads (Ex: A mono block cylinder head of 6 unit engine will be considered as 6 cylinder heads).

-

-

-

... More
2.Removal of Fuel Pump for repairs, over haul with ship’s spares, Calibration and fitting back for Mono Block type PPs

-

-

-

... More
a) 4 elements PPs

-

-

-

... More
b) 5 elements PPs

-

-

-

... More
c) 6 elements PPs

-

-

-

... More
d) 8 elements PPs

-

-

-

... More
e) 12 elements PPs

-

-

-

... More
3.Removal of fuel injectors overhauling and testing and fitting back (Spares Ship Supply) Rate per Injector

-

-

-

... More
4. a) Complete Turbocharger (MAN /Wartsila/Cummins/Caterpillar make, models: NA/NT/NR) to be dismantled, over-hauled, worn-out parts to renew with ships spares, assembled and to show satisfactory trials to ship staff/surveyor, if required. Surveyor fee DCI head. O/H- Rate per Turbocharger. Incl. All clearances to check, record & show as per Manual.

-

-

-

... More
b) Dynamic balancing of Rotor (Extra Cost to (a) above)

-

-

-

... More
5. Taking of Pistons to Work shop necessary repairs to be carried out. Under Class Surveyors supervision, if required. (Survey fee to DCI a/c). Rate/Piston

-

-

-

... More
6.Removing of attached LO pump from Engine, dismantling of same and showing to Surveyor, if required. ( surveyor fee DCI account) Reassembling and boxing up of same Rate per pump.

-

-

-

... More
7. Main and sand pump engine pedestal bearing. Inspection if required renewal of bearing/ liner (Spares ships supply). Complete bearing renewal and alignment as required. Rate per Bearing.

-

-

-

... More
8. a) Removing and re-lagging (with new material) of exhaust manifold exhaust pipes of main Engine/Aux. Engine with Heat resistive material up to 600 0 C (minimum) Rate per Sq. Meter (50 mm thick) including material cost

-

-

-

... More
b) Renewal of GI sheeting to exhaust manifold of Main engine / Aux. engine. Rate per Sq. Meter Quote (including Material) Rs:

-

-

-

... More
9.Attached pump removal from engine, dismantling, presenting for survey, assemble with ship supply spares and fitting back to the engine. (Repairs if any extra).

-

-

-

... More
a) Fresh Water

-

-

-

... More
b) Sea Water

-

-

-

... More
10. Checking of alignment of complete Engine with gearbox after disconnecting the coupling and coupling to fit back after rectification/ repairs if any (Note: Rectification/Repairs will be extra for all items above.)

-

-

-

... More
Engine Above 750 KW upto 1500 KW

-

-

-

... More
1. Transporting cylinder head (1 no) to workshop, dismantling, lapping of valves, seats, assembling and handing over to ship after pressure testing up to 6 bar including chemical cleaning (Chemical Ship supply). Note: In case of Mono block cylinder head, payment will be made considering total number of units as number of cylinder heads (Ex: A mono block cylinder head of 6 unit engine will be considered as 6 cylinder heads).

-

-

-

... More
2.Removal of Fuel Pump for repairs, over haul with ship’s spares, Calibration and fitting back for Mono Block type PPs

-

-

-

... More
a) 4 elements PPs

-

-

-

... More
b) 5 elements PPs

-

-

-

... More
c) 6 elements PPs

-

-

-

... More
d) 8 elements PPs

-

-

-

... More
e) 12 elements PPs

-

-

-

... More
3.Removal of fuel injectors overhauling and testing and fitting back (Spares Ship Supply) Rate per Injector

-

-

-

... More
4. a) Complete Turbocharger (MAN /Wartsila/Cummins/Caterpillar make, models: NA/NT/NR) to be dismantled, over-hauled, worn-out parts to renew with ships spares, assembled and to show satisfactory trials to ship staff/surveyor, if required. Surveyor fee DCI head. O/H- Rate per Turbocharger. Incl. All clearances to check, record & show as per Manual.

-

-

-

... More
b) Dynamic balancing of Rotor (Extra Cost to (a) above)

-

-

-

... More
5. Taking of Pistons to Work shop necessary repairs to be carried out. Under Class Surveyors supervision, if required. (Survey fee to DCI a/c). Rate/Piston

-

-

-

... More
6.Removing of attached LO pump from Engine, dismantling of same and showing to Surveyor, if required. ( surveyor fee DCI account) Reassembling and boxing up of same Rate per pump.

-

-

-

... More
7. Main and sand pump engine pedestal bearing. Inspection if required renewal of bearing/ liner (Spares ships supply). Complete bearing renewal and alignment as required. Rate per Bearing.

-

-

-

... More
8. a) Removing and re-lagging (with new material) of exhaust manifold exhaust pipes of main Engine/Aux. Engine with Heat resistive material up to 600 0 C (minimum) Rate per Sq. Meter (50 mm thick) including material cost

-

-

-

... More
b) Renewal of GI sheeting to exhaust manifold of Main engine / Aux. engine. Rate per Sq. Meter Quote (including Material) Rs:

-

-

-

... More
9.Attached pump removal from engine, dismantling, presenting for survey, assemble with ship supply spares and fitting back to the engine. (Repairs if any extra).

-

-

-

... More
a) Fresh Water

-

-

-

... More
b) Sea Water

-

-

-

... More
10. Checking of alignment of complete Engine with gearbox after disconnecting the coupling and coupling to fit back after rectification/ repairs if any (Note: Rectification/Repairs will be extra for all items above.)

-

-

-

... More
Engine Above 1500 KW upto 3900 KW

-

-

-

... More
1. Transporting cylinder head (1 no) to workshop, dismantling, lapping of valves, seats, assembling and handing over to ship after pressure testing up to 6 bar including chemical cleaning (Chemical Ship supply). Note: In case of Mono block cylinder head, payment will be made considering total number of units as number of cylinder heads (Ex: A mono block cylinder head of 6 unit engine will be considered as 6 cylinder heads).

-

-

-

... More
2.Removal of Fuel Pump for repairs, over haul with ship’s spares, Calibration and fitting back for Mono Block type PPs

-

-

-

... More
a) 4 elements PPs

-

-

-

... More
b) 5 elements PPs

-

-

-

... More
c) 6 elements PPs

-

-

-

... More
d) 8 elements PPs

-

-

-

... More
e) 12 elements PPs

-

-

-

... More
3.Removal of fuel injectors overhauling and testing and fitting back (Spares Ship Supply) Rate per Injector

-

-

-

... More
4. a) Complete Turbocharger (MAN /Wartsila/Cummins/Caterpillar make, models: NA/NT/NR) to be dismantled, over-hauled, worn-out parts to renew with ships spares, assembled and to show satisfactory trials to ship staff/surveyor, if required. Surveyor fee DCI head. O/H- Rate per Turbocharger. Incl. All clearances to check, record & show as per Manual.

-

-

-

... More
b) Dynamic balancing of Rotor (Extra Cost to (a) above)

-

-

-

... More
5. Taking of Pistons to Work shop necessary repairs to be carried out. Under Class Surveyors supervision, if required. (Survey fee to DCI a/c). Rate/Piston

-

-

-

... More
6.Removing of attached LO pump from Engine, dismantling of same and showing to Surveyor, if required. ( surveyor fee DCI account) Reassembling and boxing up of same Rate per pump.

-

-

-

... More
7. Main and sand pump engine pedestal bearing. Inspection if required renewal of bearing/ liner (Spares ships supply). Complete bearing renewal and alignment as required. Rate per Bearing.

-

-

-

... More
8. a) Removing and re-lagging (with new material) of exhaust manifold exhaust pipes of main Engine/Aux. Engine with Heat resistive material up to 600 0 C (minimum) Rate per Sq. Meter (50 mm thick) including material cost

-

-

-

... More
b) Renewal of GI sheeting to exhaust manifold of Main engine / Aux. engine. Rate per Sq. Meter Quote (including Material) Rs:

-

-

-

... More
9.Attached pump removal from engine, dismantling, presenting for survey, assemble with ship supply spares and fitting back to the engine. (Repairs if any extra).

-

-

-

... More
a) Fresh Water

-

-

-

... More
b) Sea Water

-

-

-

... More
10. Checking of alignment of complete Engine with gearbox after disconnecting the coupling and coupling to fit back after rectification/ repairs if any (Note: Rectification/Repairs will be extra for all items above.)

-

-

-

... More
02 – 01 HEAT EXCHANGER & COOLERS FOR DIESEL ENGINES

-

-

-

... More
1. a) Tube Cooler with end covers to be taken out from position after removing pipe connection. Inside of the tubes to be cleaned as required (Chemical Ship supply). Cooler to be pressure tested onboard with ship supplied blanks. Leaky tubes to be plugged in situ (Plugs ship's supply). Cooler to be boxed back in position with all pipe connections (Packings & Gaskets ship supply). Rate for above job on tube Cooler assembly to be quoted per cubic meter (Cubic volume including end covers). Rs

-

-

-

... More
b) Transportation of the coolers from vessel to workshop and back after completion of repairs (Rate per Cu.m volume of cooler assembly including end covers) Rs.

-

-

-

... More
2. a) Plate Cooler with end plates to be dismantled and taken out from position after removing pipe connections. Plates to be cleaned with chemical (Chemical Ship supply). Partition/end plates to be built up and machined as required.(Cost of Built up & Machining- Extra on per kg basis) Cooler to be boxed back in position with all pipe connections (Packings & Gaskets ship supply). Cooler to be pressure tested onboard with ship supplied blanks. Rate for above job on Plate Cooler assembly to be quoted per cubic meter (Including end plates). Rs

-

-

-

... More
b) Removal of old gaskets, cleaning the surface and sticking the new gaskets with ship supplied glue (Per gasket) Rs .

-

-

-

... More
c)Transportation of the coolers from vessel to workshop and back after completion of repairs (Rate per cu.m of cooler assembly) Rs

-

-

-

... More
3. a) Engine air Cooler/Radiator with end covers to be taken out from position after removing pipe connection. Inside of the tubes and outside fins to be cleaned as required (Chemical Ship supply). Cooler to be pressure tested onboard with ship supplied blanks. Leaky tubes to be plugged in situ. Cooler to be boxed back in position with all pipe connections (Packings & Gaskets ship supply). Rate per cubic meter of fin and tube element assembly with end covers to be considered for quoting. Rs:

-

-

-

... More
b) Transportation of the coolers from vessel to workshop and back after completion of repairs Rs

-

-

-

... More
4. Renewal of tube (Rate per kg)

-

-

-

... More
a) Copper : Rs

-

-

-

... More
b) Brass : Rs.

-

-

-

... More
c) 70% Copper+ 30% Zinc : Rs.

-

-

-

... More
5. Make an supply of end covers (finished product weight will be considered)

-

-

-

... More
a) G.M/ Kg of wt : Rs

-

-

-

... More
b) Cast Iron per Kg of weight: Rs.

-

-

-

... More
6. Zinc / Al. Anodes Rate per Kg: Rs:

-

-

-

... More
7. Renewal of old Cooler with ship supplied New /O’Haul Cooler including removal / refitting of in-way pipes and valves ( Rate to be quoted per.Cu.m)

-

-

-

... More
a) Air Cooler: Rs

-

-

-

... More
b) Tube / Plate Cooler : Rs

-

-

-

... More
Note: 1) Material Test Certificate to be produced wherever applicable, 2) Re-tubing to be done under the supervision of class if required. (Class fee to DCI Account) 3) Cu,m of cooler = length x breadth x height in meters including end covers.

-

-

-

... More
03 – 01 CENTRIFUGAL SEA WATER & FRESH WATER PUMPS

-

-

-

... More
1. Disconnect pipe connections, coupling, separate motor and open Pump casing for inspection. Worn out parts including bearings to renew with ship supply Spares. Bearing landing areas to built up and machine (cost extra). Sleeves to be shrunk fitted. Refit with new joint and connect motor in situ and alignment to be done with motor shaft.(Spares, Sleeves, Joints & Materials Ship supply ) The job to done onboard.

-

-

-

... More
WORKSHOP RATES FOR PUMP HORSE POWER

-

-

-

... More
UPTO 5 KW Rs.

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs.

-

-

-

... More
2. Skimming/machining of impeller, shaft sleeve, mouth ring & Wearing rings, if required. Rate per item

-

-

-

... More
UPTO 5 KW Rs.

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs.

-

-

-

... More
3. Disconnect pump from position. Remove complete pump, shift to W/S and overhaul completely. Retransport to ship and refit in position including alignment & satisfactory running trial (excluding cost of spares, built up and machining etc).

-

-

-

... More
UPTO 5 KW Rs.

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs.

-

-

-

... More
4. Submersible pumps overhaul, to check water tight integrity and Trials to show, Type-Mody / any other make (Spares cost extra)

-

-

-

... More
UPTO 5 KW Rs.

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs.

-

-

-

... More
Note: Motor & Pumps are to be aligned properly, Running direction of Motor to be checked. Pressure gauges and pipe clamping are to be fit in place before running Trials

-

-

-

... More
04 – 01 GEAR PUMPS .

-

-

-

... More
WORKSHOP RATES FOR PUMP HORSE POWER

-

-

-

... More
Steering gear / pumps: .

-

-

-

... More
1.Steering gear main hydraulic pump (constant / variable delivery type) complete to be opened, overhauled, put up for Inspection/ survey boxed back on board, fitted in place and satisfactory Trials to be given. (Spares Ship supply)

-

-

-

... More
WORKSHOP RATES FOR PUMP HORSE POWER

-

-

-

... More
Upto 5 KW Rs:

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs:

-

-

-

... More
LO/FO gear/screw Pumps: To overhaul pump along with its relief valve. All Spares Ship supply.

-

-

-

... More
Upto 5 KW Rs:

-

-

-

... More
Abv 5 - 15 KW Rs:

-

-

-

... More
Abv 15 - 25 KW Rs:

-

-

-

... More
Abv 25 - 40 KW Rs:

-

-

-

... More
05 – 01 DREDGE / SAND PUMPS .

-

-

-

... More
1.IHC type Sand/ Dredge pump suction side wedge pipes to be opened and boxed back with new ship supply seal / joints (quote including blanking of lines).

-

-

-

... More
2.IHC type Sand pump suction side cover to be opened and boxed up with new Ship supply seal / joints.

-

-

-

... More
3.IHC type Sand pump suction side wearing plate to be renewed including welding of lugs, if required (wearing plate & lugs ship supply).

-

-

-

... More
4.Shaft side wearing plate to be renewed including welding of lugs, if required (wearing plate & lugs ship supply).

-

-

-

... More
5. IHC type Sand pump impeller to be removed and boxed up with same impeller or new / reconditioned impeller and satisfactory Trials to be given. (Quote including removal & fitment of gland flushing lines and other connected pipelines).

-

-

-

... More
6.Flushing water chamber and sealing pot to be removed chrome bush tripartite rings and gland seals to be removed for inspection and boxed back with ship supply spares.

-

-

-

... More
7.a) Application of one coat of plastic carbide or any cold putty for the sand pump casing, sand pump impeller suction pipes, (cold putty or plastic carbide ship supply) Rate per Kg.

-

-

-

... More
b) Application of one coat of plastic carbide or any cold putty for the sand pump casing, sand pump impeller suction pipes, (cold putty or plastic carbide workshop supply) Rate per Kg.

-

-

-

... More
8. IHC type Sand pump thrust block to be removed from position, dismantled, overhaul by renewing ship supply spares, and boxed back. Thrust block to align with dredge pump shaft & gear box shaft and Satisfactory Trials to be given.

-

-

-

... More
9. Making and supplying of M.S/Nihard wear plate for the suction & discharge for the sand pump. As per SCH-25.01

-

-

-

... More
a) MS-- Rate per Kg. of finished plate

-

-

-

... More
b) NIhard-- Rate per Kg. of finished plate

-

-

-

... More
10. Welding of all lugs (ship supply) on one wear plate Rs:

-

-

-

... More
11. M.S Diaphragm plate to make & supply Rate per Kg. of finished product Rs: As per SCH-25.01

-

-

-

... More
12.a) Rubber Cord 14 MM dia per mtr. Rs

-

-

-

... More
b) Rubber Cord 16 MM dia per mtr Rs

-

-

-

... More
c) Rubber Cord 20 MM dia per mtr Rs

-

-

-

... More
d) Rubber Cord 30 MM dia per mtr Rs

-

-

-

... More
e) Rubber Cord 40 MM dia per mtr. Rs

-

-

-

... More
13. Make & Supply dowty washer with seal and bolt for wear plate Rs

-

-

-

... More
Note: M S Lugs if supplied by the Work Shop, the rate would be regulated as per RS - 25 - 01

-

-

-

... More
06 - 01 JET PUMPS (300 KW to 900 KW)

-

-

-

... More
1. Renewal of Jet pump with New / O’Hauled Pump assembly. Job shall include R/R of coupling, pipeline connections, alignment of pump and slackening & Torque tightening of foundation Bolts

-

-

-

... More
2.a)Casing cover to remove and Complete shaft with sleeves, Wearings, Bearings and impeller to remove, repair (excluding metal building/ machining of shaft/ casing) / renew and box back. All parts to assemble and satisfactory Trials to be given. (Alignment if any at extra Cost) Rs.

-

-

-

... More
2.b) Cost of build up and Machining of pump casings (2 half) Rs. (Rate / Kg to be quoted including welding electrodes, build up and machining)

-

-

-

... More
(ii) Manufacture & Supply wear rings (C.I mat). Rate per Kg. as per SCH-25.01

-

-

-

... More
(iii) Application of steel putty for filling up of pittings( Payment will be made on prorate base, if the weight of the putty product is fraction).Rate to be quoted per KG.

-

-

-

... More
07 – 01 SEA SUCTION AND DISCHARGE VALVES

-

-

-

... More
1. To disconnect valve from pipe, dismantle, overhaul, put up for inspection/ survey (survey charges DCI account ) Grinding / lapping the valve and valve seat in place. Built up / machine (at cost extra) the valve body wherever required, rubberized portion to be checked and repaired (extra cost) if required. On completion of inspection /survey, valve to be boxed back in situ /onboard with new gasket, gland packing, bolts and nuts. Valve to be pressure tested as per ship staff requirement. (all Spares – ship supply).Valve to fit back in place and satisfactory trials to be shown to ship staff.

-

-

-

... More
RATE FOR SL NO.1

-

-

-

... More
Globe V/V

-

-

-

... More
DIA : Upto 30 MM

-

-

-

... More
DIA : Above 30 Upto 50 MM

-

-

-

... More
DIA : Above 50 Upto 100 MM

-

-

-

... More
DIA : Above 100 Upto 150 MM

-

-

-

... More
DIA : Above 150 Upto 250 MM

-

-

-

... More
DIA : Above 250 Upto 350 MM

-

-

-

... More
DIA : Above 350 Upto 500 MM

-

-

-

... More
Butterfly V/V

-

-

-

... More
DIA : Upto 30 MM

-

-

-

... More
DIA : Above 30 Upto 50 MM

-

-

-

... More
DIA : Above 50 Upto 100 MM

-

-

-

... More
DIA : Above 100 Upto 150 MM

-

-

-

... More
DIA : Above 150 Upto 250 MM

-

-

-

... More
DIA : Above 250 Upto 350 MM

-

-

-

... More
DIA : Above 350 Upto 500 MM

-

-

-

... More
Gate V/V

-

-

-

... More
DIA : Upto 30 MM

-

-

-

... More
DIA : Above 30 Upto 50 MM

-

-

-

... More
DIA : Above 50 Upto 100 MM

-

-

-

... More
DIA : Above 100 Upto 150 MM

-

-

-

... More
DIA : Above 150 Upto 250 MM

-

-

-

... More
DIA : Above 250 Upto 350 MM

-

-

-

... More
DIA : Above 350 Upto 500 MM

-

-

-

... More
Storm valves

-

-

-

... More
DIA : Upto 30 MM

-

-

-

... More
DIA : Above 30 Upto 50 MM

-

-

-

... More
DIA : Above 50 Upto 100 MM

-

-

-

... More
DIA : Above 100 Upto 150 MM

-

-

-

... More
DIA : Above 150 Upto 250 MM

-

-

-

... More
DIA : Above 250 Upto 350 MM

-

-

-

... More
DIA : Above 350 Upto 500 MM

-

-

-

... More
2. Transport complete valve to workshop for repair and back. Extra on serial No.1- 60%

-

-

-

... More
3. Renewal of the above valves with spare new/overhauled valves supplied by vessel as below. 50% of the overhauling value will be considered.

-

-

-

... More
08 – 01 HYDRAULICALLY OPERATED SLUICE & BUTTERFLY VALVES (Mechanical Works)

-

-

-

... More
1. Sluice Valves:

-

-

-

... More
a) Removal of sluice valve from position by disconnecting necessary Hydraulic & flushing water pipe lines, replacing the valve with new/overhauled one, reconnecting all pipe lines and satisfactory trials to be shown to ship staff.

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
b) Transportation of valve to workshop and bringing back onboard once overhauled (Overhauling charged extra as per S.No08-01c)

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
c) Valve to be dismantled completely by removing hydraulic cylinder and slide from place, combi-rings, nose rings and buffer rings to be removed & renewed/refitted (ship supply). Worn out portion in way of buffer rings / seat rings to be built up/repaired by Welding & machining/plastic carbide/putty, if required (at extra cost - Refer Sch 08-01, S.No 03,04,05 & 06). Flushing water space to be cleaned and painted with Apexior–3. Valve to be assembled, fitted back in position, all piping connections to be given, and satisfactory manual operation to be shown to ship staff. Spares ship supply. Pressure testing of hydraulic cylinder if any, will extra as per Sch III 10-1(2(g)). Cost shall include Staging, if any.

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
d) Sluice Valves (Mechanical side) to be pressure tested to design pressure or as per ship staff requirement Rs

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
2. Butterfly Valves: (Types: Handle / Wheel/ Actuator)

-

-

-

... More
a) Complete valve to be removed after disconnecting the Actuator Hyd. Lines/ Handle/ Wheel, renew with new/overhauled valve to reconnect Hyd. Lines/ Handle/ Wheel and satisfactory trials to be shown to ship staff.

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
b) Valve to be dismantled, body to be inspected for deformations, cracks etc, confirm disc is intact and without bends, sealing surface and condition of seat/rubber linning to be checked for flexibility & renew if necessary, check the straightness of spindle & repair if required, renew packing & o-rings (Repair or renewal of spindle, valve seat and O rings is inclusive), boxed back and satisfactory trials to be shown to ship staff.

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
c) Actuating Mechanism / Gear Train / Spindle connection operating mechanism to dismantle, overhaul and box back.

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
d) Valves to be Pressure tested to design pressure or as per requirement of ship staff, after overhaul Rs:

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
e) Complete Rubber lining of Valve (Vulcanized) to renew Rs

-

-

-

... More
DIA : 300/350 MM

-

-

-

... More
DIA : 400/ 450 MM

-

-

-

... More
DIA : 500/ 550 MM

-

-

-

... More
DIA : 600/ 650 MM

-

-

-

... More
DIA : 700MM

-

-

-

... More
DIA : 800MM

-

-

-

... More
DIA : 850MM

-

-

-

... More
DIA : 1000MM

-

-

-

... More
3. Worn-out portion in way of nose and buffer rings and nyleton ring to be built up by low hydrogen electrodes and hand grind to required diameter. Rate to be quoted per Kg. of electrodes. Rs:

-

-

-

... More
4. Worn-out portions on stainless steel slides to be built up and hand grind to original shape/ sizes. Rate Per Kg. of electrodes. Rs:

-

-

-

... More
6. Worn-out portions of the water box to be cropped and renewed as per steel renewal rates at S.No 1 of SCH III 15-01 Rs:

-

-

-

... More
09 – 01 DRAG HEADS

-

-

-

... More
1.Disconnection & removal of old draghead from suction tube and fitting new/reconditioned draghead in place.

-

-

-

... More
2. Transportation of Drag Head: Jet type/ Non-jet type/ California / New generation Drag head/ Mighty dragon / Excavation Draghead, to transport from ship to workshop for repairs and to transport back to ship/local project office after completion of repairs. Rate inclusive of loading, unloading & hydra/crane charges.

-

-

-

... More
3. Rate for removal & refitting of Visor cylinder (if fitted)

-

-

-

... More
4. Complete draghead including Visor, visor cylinder & body to be chipped & painted. Lumpsum Rate per Drag head. Rs:

-

-

-

... More
5. Rate for insitu renewal of pin & bushes of visor & draghead body onboard, including remove/refit visor if required. (pins and bushes- ship supply) Note: If required, pins & bushes are to build up & machined (at extra cost as per Sch 16-01) / renewed (ship supply). Rs.

-

-

-

... More
a) For California draghead

-

-

-

... More
(i) Rate for each pin

-

-

-

... More
(ii) Rate for each bush

-

-

-

... More
b) For IHC & new generation draghead

-

-

-

... More
(i) Rate for each pin

-

-

-

... More
(ii) Rate for each bush

-

-

-

... More
6. Rate for renewal of pin & bushes of buffer spring assembly / visor actuating cylinder onboard including remove/refit buffer spring/ cylinder. (pins and bushes- ship supply)

-

-

-

... More
a) Rate per pin.

-

-

-

... More
b) Rate per bush

-

-

-

... More
7. Buffer spring to be overhauled/renewed (Spares ship supply)

-

-

-

... More
8. Both sides Rubber fenders (ship supply) of drag head to be renewed. Rate/meter Rs:

-

-

-

... More
9. Renewal of the following (spares ship supply and all other on workshop account). Quote should be inclusive of removal of old item by gouging of weld and welding new item/part.

-

-

-

... More
a) Per Kg of Diamond block

-

-

-

... More
b) Per Kg of Wearing pad

-

-

-

... More
c) Per Kg of Nozzle pad

-

-

-

... More
10. Renewal of drag head flange. Rates regulated as per SCH III 22-01.

-

-

-

... More
12. Drag head shoes to be manufactured and supplied on board Vessel Rate per KG of shoe Rs:

-

-

-

... More
13. Building up and hard facing of the wear down area of drag head Diamond blocks, wearing pads, rubbing blocks, shoes, gratings etc with electrodes. Rates quoted at Schedule 16-01 will be applicable

-

-

-

... More
Note: Diamond Blocks, Wear Pads & Nozzle Pads etc, if supplied by the Work Shop the rate would be regulated as per Rate Sche.- 25 – 01.

-

-

-

... More
10-01 HYDRAULIC CYLINDERS

-

-

-

... More
Rudder power transmitting unit:

-

-

-

... More
1. Hyd. Cylinder with ram removed from place, ram to be withdrawn and chromium plating to be checked after moving the trunion arrangement. Hydraulic Cylinder to be gauged and report submitted. Bucket and gland seals to be renewed (spares ship supply), pistons to secure and lock on the ram, seals to be calibrated, assembled back, pressure tested (as per manual/ship staff instructions) and satisfactory trials to be given. Trunion pin and bush to be calibrated. Worn out pin and bush (Spares ship supply) to be renewed. Equalizing valves and non return valves to be overhauled; satisfactory Trials to be given.

-

-

-

... More
2.HYDRAULIC CYLINDERS

-

-

-

... More
Remove Hyd. Cylinder from its position (dismantle swivel bearing) and to dismantle completely. Fork / piston to unscrew from Ram, Gland cover and tripartite rings to remove, Bucket, gland seals and ‘O’ rings to renew, Cylinder to check for any wear down / scoring / ovality (repairs extra), Piston locking on the Ram to check and secure, Ram surface to check and defects to identify and polish the Ram, if required, Ram to be chrome plated if required.(chrome plating cost extra), assembled back, Pressure tested with portable hydraulic power pack as per ship staff/manual instructions and to fit back in position. Power pack to be arranged by workshop. Seals , ‘O’ rings, Swivel bearings, pins, hyd.oil and all Spares are ship supply.

-

-

-

... More
a) Drag head/Intermediate gantry cylinder Rate per cylinder : Rs

-

-

-

... More
b) Swell compensator hyd cylinder . Rate per cylinder : Rs

-

-

-

... More
c) Bottom door Hyd. Cylinder. Rate per cylinder : Rs

-

-

-

... More
d) Trunion gantry cylinder Rate per cylinder : Rs

-

-

-

... More
e) Upper door Hyd. Cylinder Rate per cylinder: Rs

-

-

-

... More
f) In-Out Cylinder (Suction Bend) Rate per cylinder : Rs

-

-

-

... More
g) Sluice valve Hyd Cylinder (Valve Dia 600/700/800/1000) . Rate per cylinder : Rs

-

-

-

... More
h) Overflow duct Cylinder (Dr-IX,XI,XII,XIV XV,XVI,XVII) Rate per cylinder : Rs

-

-

-

... More
i) Spud carriage Cylinders Rate per cylinder : Rs ( Dr XVIII)

-

-

-

... More
j) Spud Hoisting Cylinders Rate per cylinder : Rs ( Dr XVIII)

-

-

-

... More
k) Spud Hoisting Cylinders Rate per cylinder : Rs (ID GANGA)

-

-

-

... More
l) Hoisting & Lower Cylinders Rate per cylinder : Rs

-

-

-

... More
m) Anti Pollution valve cylinder Rate per cylinder : Rs

-

-

-

... More
n) Weir door Cylinders (Dr-VIII) Rate per cylinder : Rs

-

-

-

... More
3. Repairing by Straitening & polishing of hyd Cyl. Rod.

-

-

-

... More
a) Drag head/Intermediate Gantry Hydraulic cylinder, cap eye mounted with rod eye.W.P:220

-

-

-

... More
b) Swell compensator hydraulic cylinder, : Rear Flange mounted with Rod Eye.W.P:220 Bar.

-

-

-

... More
c) Bottom door hydraulic cylinder, Cap eye mounted with Rod Eye.W.P.220 Bar.

-

-

-

... More
d) Trunion gantry hydraulic cylinder, trunion mounted.W.P.220 Bar.

-

-

-

... More
Dechroming and chrome plating of RAM & Cyl. Of 75 micron thickness. Invoice will be settled on prorate basis depending on micron size of chrome plating and area of chrome plating. Rate per Sq.Mtr area.

-

-

-

... More
Note: 5% extra Cost shall be allowed for staging, if required.

-

-

-

... More
11 – 01, WINDLASSES

-

-

-

... More
1.Gear box:

-

-

-

... More
a) Damaged bearing / bushes renewal and satisfactory trial run to show (bearing supply by ship)

-

-

-

... More
b) Oil seal renewal and satisfactory trial run to show, (Oil seals ships supply).

-

-

-

... More
c) Gear cases to be dismantled, gears to be taken out for inspection / survey, renew gears if required and box back satisfactory trials trial run to show. (Spares ship supply)

-

-

-

... More
2.Brake

-

-

-

... More
a) Brake Lining (ferodo - lining ship supply) to be renewed, clearances to be adjusted & satisfactory trials to be given.

-

-

-

... More
b) To renew MS backing strip for ferrado brake pads; satisfactory trials to be given. Rate per Kg of finished product

-

-

-

... More
3.Slip clutch

-

-

-

... More
a) Slip clutch to be overhauled, renew of clutch plates (if required), adjust Slip clutch clearances/settings as per specified load & satisfactory trial to be given. Spares ship supply.

-

-

-

... More
b) Adjust Slip clutch settings as per specified load & satisfactory trial to be given.

-

-

-

... More
12 – 01, SHEAVES & PULLEYS

-

-

-

... More
Overhaul of Pulley blocks / Sheave assembly: Blocks/sheave assembly to be removed from place, dismantled, pins, bushes and pulleys to be removed from block (including rigging, removal of pulley blocks / pulleys), Pins and bushes to be inspected and renewal to be done as per requirement (Pins and bushes ship supply). If required, build up and machining of scoring surface/grooves to be done on pins and bushes. (Built up and machining extra). To assemble and fit back in position after repairs/renewals and satisfactory trials to be shown.

-

-

-

... More
a) Upto 100 mm dia OD of pulley Rs:

-

-

-

... More
b) Above 100mm - upto 300mm OD Rs:

-

-

-

... More
c) Above 300mm - Upto 500mm OD Rs:

-

-

-

... More
d) Above 500mm - upto 1000mm OD Rs:

-

-

-

... More
Note: 1. Above charges are inclusive of transportation to and from ship to workshop and back 2. Above charges are inclusive of rigging,staging, removal of pulley blocks and refitting etc., 3. Metal built up as per 16-01.

-

-

-

... More
13 – 01 RENEWAL OF G.I. PIPES

-

-

-

... More
1.Taking off the old damaged/ defective pipes and renewing the pipes assuming straight lengths per meter including rubber joints bolts and nuts wherever necessary. Less than one meter will be paid as one meter and above one meter will be paid as actuals.

-

-

-

... More
2.Pipe renewal with material per meter (Quote to be inclusive of Material) - Nominal Pipe Dia (in MM)

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
3. Renewal of each bend, (Quote to be inclusive of Material) - For nominal Pipe Dia in MM

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
4. Renewal of flange, if any. (Quote to be inclusive of Material) - For Nominal Pipe Dia in MM

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
5.Extra for each branch connection (Nominal Pipe Dia in MM)

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
6.For clamp Renewal, if any (For nominal pipe Dia in MM)

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
7.Opening of pipe for cleaning and boxing with patch work, if any. Cost per Meter. Pipes to be clamped after renewal. (Nominal Pipe Dia in MM)

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
8.Extra percentage for pipe renewal or opening & boxing back of pipes under floor plates (Applicable on 13-01 item sl.no 2 & 7 only) (Pipe Dia in MM) 20% extra (fixed)

-

-

-

... More
14 – 01, RENEWAL OF SCHEDULE/SOLID DRAWN PIPES

-

-

-

... More
1. NB of solid drawn pipe/Sch - 40 /80 Pipes

-

-

-

... More
2.Rate for renewal for each meter, (including Labour charges ,Gas, HT Nut/bolts, Joints, blanking, & all matrls) Cost of Pipe extra on C+,(Min 1 Mtr)

-

-

-

... More
Up to 12

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
Three Hundred

-

-

-

... More
Three Fifty

-

-

-

... More
Four Hundred

-

-

-

... More
3.Rate for renewal for each Bend (Cost Including Material)

-

-

-

... More
Up to 12

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
Three Hundred

-

-

-

... More
Three Fifty

-

-

-

... More
Four Hundred

-

-

-

... More
4.Extra for each flange/ blank renewal (Cost Including Material)

-

-

-

... More
Up to 12

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
Three Hundred

-

-

-

... More
Three Fifty

-

-

-

... More
Four Hundred

-

-

-

... More
5.Extra for each MS / Nylon clamp renewal/ refitting (Including Material)

-

-

-

... More
Up to 12

-

-

-

... More
Ten

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Sixty Five

-

-

-

... More
Eighty

-

-

-

... More
Hundred

-

-

-

... More
One Twenty Five

-

-

-

... More
One Fifty

-

-

-

... More
Two Hundred

-

-

-

... More
Three Hundred

-

-

-

... More
Three Fifty

-

-

-

... More
Four Hundred

-

-

-

... More
6.Extra for doing the above work after removing the floor plates and other obstructions wherever necessary and refitting back. 20 % extra (fixed)

-

-

-

... More
Note: Less than one Meter will be paid as one meter and above one meter will be paid as per actual, (for sl.no 2)(14-01(A) Cost of pipe shall be payable as follows (on cost plus basis)- (i) Upto 200 mm dia- Less than one Meter will be paid as one meter and above one meter will be paid as per actual (ii) Above 201 mm dia- Less than half Meter will be paid as half meter and above half meter will be paid as per actual

-

-

-

... More
14 – 02, RENEWAL OF SCHEDULE/SOLID DRAWN STAINLESS STEEL PIPES (SS 306 and above)

-

-

-

... More
Rate for renewal for each meter, (including Consumables, Labour charges , Gas, Nut/bolts, Ferrules, Joints, blanking, & all matrls) Cost of Pipe extra on C+,(See note below)

-

-

-

... More
Nominal Bore

-

-

-

... More
Up to 12

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Rate for renewal for each Bend (Cost Including Material + Labour)

-

-

-

... More
Up to 12

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Extra for each flange/ blank renewal (Cost Including Material + Labour)

-

-

-

... More
Up to 12

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
Extra for each MS / Nylon clamp renewal/ refitting (Including Material & labour)

-

-

-

... More
Up to 12

-

-

-

... More
Fifteen

-

-

-

... More
Twenty

-

-

-

... More
Twenty Five

-

-

-

... More
Thirty Two

-

-

-

... More
Fourty

-

-

-

... More
Fifty

-

-

-

... More
NOTE: Extra for doing the above work after removing the floor plates and other obstructions wherever necessary and refitting back. 20 % extra (fixed )

-

-

-

... More
15 – 01, STEEL RENEWALS

-

-

-

... More
1.Renewal of steel on board dredgers. Assume crop, clean and renew with welding construction complying with Class requirement

-

-

-

... More
a) Below & up to 1000 Kgs. Rate per Kg. :Rs

-

-

-

... More
b) Above 1000 Kgs & up to 4999 kgs Rate per Kg. :Rs

-

-

-

... More
c) Above 5000 Kgs. Rate per Kg. :Rs

-

-

-

... More
d) Minimum steel renewal Rate per 10 Kg. :Rs (min 10 Kgs.per location will be allowed)

-

-

-

... More
Note:

-

-

-

... More
i). Staging 5 % Extra

-

-

-

... More
ii) Internals -Pump room, Engine room, Fwd Machinery room= 10% Extra

-

-

-

... More
iii) Tested quality(IS 2062)/ Lloyd’s quality/A grade Steel- 5%Extra

-

-

-

... More
iv) Confined places (Centre Keelson, Buoyancy chambers, Hopper spaces, Steering compartment, Inside tanks, Cofferdams, under floor plates & Machinery spaces) - 10% Extra (Either (ii) or (iv) only applicable and both % of Extras are not applicable simultaneously for given work )

-

-

-

... More
v). Single Curvature / Double Curvature … 5% / 10% extra

-

-

-

... More
vi) Full Circle, 360 degrees-Rolling … 20% extra

-

-

-

... More
vii) Renewal of thin steel plates less than 10mm…15% extra (Steel thick Sizes- 10mm & below plates)

-

-

-

... More
viii) Chequered plates……. ………… 5% extra

-

-

-

... More
(extra % are applicable on basic rates at sl no.1-a,b,c,& d above)

-

-

-

... More
2. (a)Fabrication and Fitments :

-

-

-

... More
i) Fabrication and Supply of steel structures and Pipes etc. to profile will be considered equal to renewal of Steel (sl no.1 above) and hence cost of tools, jigs & fixtures assumed to be included, rate will not be allowed separately : 100% of basic renewal rate

-

-

-

... More
ii) Doubler plate 80% of basic renewal rate

-

-

-

... More
iii) Off fair and refit 80% of basic renewal rate

-

-

-

... More
iv) Fair in place 70% of basic renewal rate

-

-

-

... More
(extra % are applicable on basic rates at sl no.1- a, b, c, & d above)

-

-

-

... More
3.Weld runs on seam per running meter—

-

-

-

... More
One run / Mtr

-

-

-

... More
4.Renewal of railing per metre: (Cost incl- Materials)

-

-

-

... More
a). 18 – upto 25mm dia solid rod

-

-

-

... More
b). Above 25 – 50mm pipe G.I (C-Grade)

-

-

-

... More
c). Above 50- 80mm GI Pipe (C-Grade)

-

-

-

... More
5.Heating and fairing in place per metre of railing :

-

-

-

... More
a). 18 –upto 25mm dia solid rod

-

-

-

... More
b). Above 25 – upto 50mm pipe G.I(C-Grade)

-

-

-

... More
c). Above 50- upto 80mm GI Pipe (C-Grade)

-

-

-

... More
6.Renewal of chequered plate of ladders, floor plates, gangways:

-

-

-

... More
a. Mild steel per Kg. Rs:

-

-

-

... More
b. Aluminium per Kg. Rs:

-

-

-

... More
7.Renewal of Stanchions per Stanchion (M.S) (Size- 100mmx12mm x 1200 mm long- 1 no.)

-

-

-

... More
8.Drill test of a ship side plates, deck plate and other steel members and filling up the hole. Rate per hole

-

-

-

... More
Non- destructive testing

-

-

-

... More
a) Ultra Sonic gauging (UTG). (Minimum 50 points shall be paid per location)

-

-

-

... More
i) 1 to 100 points Rate per point Rs:

-

-

-

... More
ii) 101 to 500 points Rate per point Rs:

-

-

-

... More
iii) 501 and above Rate per point Rs:

-

-

-

... More
b) Dye-penetrant testig

-

-

-

... More
i) Per 100 Sq. Mtr area

-

-

-

... More
b) Dye-penetrant testig

-

-

-

... More
ii) Per 10 Cms of weld joint

-

-

-

... More
c) MPI testing for weld joint per meter length.

-

-

-

... More
10.Air vent Repairs: Remove air vent from position. Check condition of air vent, side cover drilling, tapping as required, renewal of MS plate, SS bolts & nuts, SS fine mesh, rubber gasket. Air vent to be fitted back after completion of repairs

-

-

-

... More
a). Air vent pipe dia 1 inch to 3 inch Rate in Rs:

-

-

-

... More
b). Above 3 inch to 6 inch Rate in Rs:

-

-

-

... More
c). Above 6 inch to 9 inch Rate in Rs:

-

-

-

... More
d). Above 9 inch to 12 inch Rate in Rs:

-

-

-

... More
SHEET METAL WORK Rate for renewal of ducting (Rectangular, Square, Round, Oval) with GI Sheet including supports of Gauge thickness. Additional Ribbing, supports, frame work etc required if any, will be settled as per steel renewal rates. Rate per sq. mtr.

-

-

-

... More
a) 16 Gauge

-

-

-

... More
b) 18 Gauge

-

-

-

... More
c) 20 Gauge

-

-

-

... More
d) 22 Gauge

-

-

-

... More
e) 24 Gauge

-

-

-

... More
f) 26 Gauge

-

-

-

... More
16 – 01, METEL BUILDING / RECONDITIONS OF HEAVY ITEMS

-

-

-

... More
1.Insitu building up or hard facing with suitable electrodes (Electrodes ships supply) on board vessels / workshop (make, size and quantity of electrodes in Kgs utilized to be certified in the work done certificate) Rate per Kg. of electrodes built up Rs:

-

-

-

... More
2.Building up with MS electrodes including cost of electrodes. Duriod 350/equivalent ESAB/Advani/L&T electrodes to be used. (make, size and quantity of electrodes in Kgs utilised is to be certified in the work done certificate) Rate per Kg. of electrodes built up inclusive of cost of electrodes Rs:

-

-

-

... More
3.Rate for Hard facing only (maximum 6 mm thick) with suitable electrodes, rate including cost of electrodes. CRC/equivalent ESAB/Advani/L&T electrodes to be used. (make, size and quantity of electrodes in Kgs utilised is to be certified in the work done certificate) Rate per Kg. of electrodes inclusive of cost of electrodes. Rs:

-

-

-

... More
4.Reconditioning of S.S Shaft (Under cutting and machining up to 100mm dia). Rate per Cm. Rs:

-

-

-

... More
5.Cold repairs of shafts, casings, pipes and other fittings by Devcon / Belzona and/or other compounds per 1 kgs Usage: including cost of labour & material.

-

-

-

... More
a) Devcon Rs:

-

-

-

... More
b) Belzona Rs:

-

-

-

... More
c) Titanium putty Rs:

-

-

-

... More
d) Steel putty Rs:

-

-

-

... More
e) Over coat putty Rs:

-

-

-

... More
6.Casings and covers, cylinder heads etc., items : Cracks to repair by metal locking with suitable electrodes Rate per inch Rs:

-

-

-

... More
17 – 01 A.C MOTORS (Stator &Rotor)

-

-

-

... More
1.Uncouple, remove from foundation Dismantling, cleaning, varnishing, backing and improving insulation, renewal of ball bearings if required (Brgs ship’s supply). If required, end covers to built up & machine (cost extra) the bearing landing areas or sleeves (cost extra) to be made and shrunk fitted. Re-assembled, fitted back, coupled, aligned with pump and satisfactory trials to be given. Insulation readings before & after the work to the given.

-

-

-

... More
Upto 3kw

-

-

-

... More
Abv 03kw - 05kw

-

-

-

... More
Abv 05kw - 10kw

-

-

-

... More
Abv 10kw - 20kw

-

-

-

... More
Abv 20kw - 25kw

-

-

-

... More
Abv 25kw - 30kw

-

-

-

... More
Abv 30kw - 45kw

-

-

-

... More
Abv 45kw - 60kw

-

-

-

... More
Abv 60kw - 75kw

-

-

-

... More
Abv 75kw - 125kw

-

-

-

... More
Abv 125kw - 150kw

-

-

-

... More
Abv 150kw - 300kw

-

-

-

... More
Abv 300kw - 400kw

-

-

-

... More
Abv 400kw - 600kw

-

-

-

... More
Abv 600kw - 1000kw

-

-

-

... More
Abv 1000kw - 1500kw

-

-

-

... More
Abv 1500kw - 2000kw

-

-

-

... More
2.Extra charges for taking to workshop & Back to Vessel including loading, unloading and transportation etc.,

-

-

-

... More
Upto 3kw

-

-

-

... More
Abv 03kw - 05kw

-

-

-

... More
Abv 05kw - 10kw

-

-

-

... More
Abv 10kw - 20kw

-

-

-

... More
Abv 20kw - 25kw

-

-

-

... More
Abv 25kw - 30kw

-

-

-

... More
Abv 30kw - 45kw

-

-

-

... More
Abv 45kw - 60kw

-

-

-

... More
Abv 60kw - 75kw

-

-

-

... More
Abv 75kw - 125kw

-

-

-

... More
Abv 125kw - 150kw

-

-

-

... More
Abv 150kw - 300kw

-

-

-

... More
Abv 300kw - 400kw

-

-

-

... More
Abv 400kw - 600kw

-

-

-

... More
Abv 600kw - 1000kw

-

-

-

... More
Abv 1000kw - 1500kw

-

-

-

... More
Abv 1500kw - 2000kw

-

-

-

... More
3.Removal of Motor, Refitting/ replace with Overhauled motor, proper Alignment with Pump and to give running/ Load Trails = 35% of Item No. 1 above.

-

-

-

... More
For class “F” insulation and above = Add 20% cost extra on Sl no.1 (17-01)above.

-

-

-

... More
REWINDING (STRIP / CORE) CHARGES PER KW

-

-

-

... More
STATOR

-

-

-

... More
Upto 3 kw

-

-

-

... More
Upto 10 kw

-

-

-

... More
Above 10 to 30 kw

-

-

-

... More
Above 30 Kw

-

-

-

... More
ROTOR

-

-

-

... More
Upto 3 kw

-

-

-

... More
Upto 10 kw

-

-

-

... More
Above 10 to 30 kw

-

-

-

... More
Above 30 Kw

-

-

-

... More
TRANSPORTATION of stator from Vessel to Work shop & Back

-

-

-

... More
Upto 3 kw

-

-

-

... More
Upto 10 kw

-

-

-

... More
Above 10 to 30 kw

-

-

-

... More
Above 30 Kw

-

-

-

... More
TRANSPORTATION of rotor from Vessel to Work shop & Back

-

-

-

... More
Upto 3 kw

-

-

-

... More
Upto 10 kw

-

-

-

... More
Above 10 to 30 kw

-

-

-

... More
Above 30 Kw

-

-

-

... More
For class “F” insulation and above = Add 20% cost extra on Sl no.1 above & for Rewinding.

-

-

-

... More
17 – 01 A.C GENERATORS (Stator &Rotor)

-

-

-

... More
Repairs to slip rings: - Transportation of rotor to works, skimming and machining of slip rings, position, adjustment of bushes and bedding. Slip rings if required to be renewed (ship supply), subject to satisfactory Trials. (Alignment with equipment before Trials) the bearings landing area in the end covers to built up (cost extra) and machine (cost extra) if required or sleeve to be made (cost extra) and shrunk fitted.

-

-

-

... More
1000 KW

-

-

-

... More
600KW

-

-

-

... More
150KW

-

-

-

... More
125KW

-

-

-

... More
75KW

-

-

-

... More
55KW

-

-

-

... More
50KW

-

-

-

... More
45KW

-

-

-

... More
30KW

-

-

-

... More
25KW

-

-

-

... More
20KW

-

-

-

... More
15KW

-

-

-

... More
10KW

-

-

-

... More
5KW

-

-

-

... More
3KW and below

-

-

-

... More
18 – 01, DC GENERATORS / MOTORS

-

-

-

... More
1.Uncoupling, dismantling, cleaning field and armature winding varnishing and baking to improve the insulation, bedding comutator and assembling the motor. Bearings to renew (ship supply) if required. Adjustment of the rotor position and bedding of brushes in situ on board to be done and satisfactory trials to be shown. Insulation readings before & after the work to the given.

-

-

-

... More
1.8 KW Rs.

-

-

-

... More
17 KW Rs.

-

-

-

... More
42.5KW Rs.

-

-

-

... More
104KW Rs.

-

-

-

... More
124KW Rs.

-

-

-

... More
150KW Rs.

-

-

-

... More
490KW Rs.

-

-

-

... More
790KW Rs.

-

-

-

... More
1075KW Rs.

-

-

-

... More
2.Removing the generator from place, transportation to workshop & Back to Vessel including loading, unloading and transportation etc.,

-

-

-

... More
1.8 KW Rs.

-

-

-

... More
17 KW Rs.

-

-

-

... More
42.5KW Rs.

-

-

-

... More
104KW Rs.

-

-

-

... More
124KW Rs.

-

-

-

... More
150KW Rs.

-

-

-

... More
490KW Rs.

-

-

-

... More
790KW Rs.

-

-

-

... More
1075KW Rs.

-

-

-

... More
3.Rewinding of field coils (strip / core) :

-

-

-

... More
1.8 KW Rs.

-

-

-

... More
17 KW Rs.

-

-

-

... More
42.5KW Rs.

-

-

-

... More
104KW Rs.

-

-

-

... More
124KW Rs.

-

-

-

... More
150KW Rs.

-

-

-

... More
490KW Rs.

-

-

-

... More
790KW Rs.

-

-

-

... More
1075KW Rs.

-

-

-

... More
4.Repairs to commutator involving dismantling, removal, machining, undercutting, refitting in shaft, bedding of brushes and adjusting positions.

-

-

-

... More
Rewinding (strip / core) charges of armature per KW

-

-

-

... More
1.8 KW Rs.

-

-

-

... More
17 KW Rs.

-

-

-

... More
42.5KW Rs.

-

-

-

... More
104KW Rs.

-

-

-

... More
124KW Rs.

-

-

-

... More
150KW Rs.

-

-

-

... More
490KW Rs.

-

-

-

... More
790KW Rs.

-

-

-

... More
1075KW Rs.

-

-

-

... More
Field Unit

-

-

-

... More
Up to 10 KW Rs:

-

-

-

... More
Above 10 and upto 30 KW Rs:

-

-

-

... More
Above 30 KW Rs:

-

-

-

... More
Excitor unit

-

-

-

... More
Up to 10 KW Rs:

-

-

-

... More
Above 10 and upto 30 KW Rs:

-

-

-

... More
Above 30 KW Rs:

-

-

-

... More
Note: Insulation Class “F” 20% cost extra on sl no.1 (18-01)above & re-winding.

-

-

-

... More
19 – 01 ALTERNATORS

-

-

-

... More
1. Quote to include decoupling of alternator, shifting from place to facilitate overhauling/repairs in-situ, Cleaning of Stator & Rotor after drawing out Rotor, baking, varnishing, improving insulation insitu on board, Reassembling in position, renewal of bearings (bearing ship supply), relocating in position and aligning with primemover. Machining of the slip rings (cost extra) and bedding of the brushes (cost extra) to be done, if required. End covers to built up & machine (at cost extra) along the bearing landing areas, sleeves (cost extra) to be made and shrunk fitted, If required. (Rates to be quoted in the Table given below)

-

-

-

... More
Alternator rating in KVA

-

-

-

... More
Upto 03

-

-

-

... More
Abv 03 - 05

-

-

-

... More
Abv 05 - 10

-

-

-

... More
Abv 10 - 20

-

-

-

... More
Abv 20 - 25

-

-

-

... More
Abv 25 - 30

-

-

-

... More
Abv 30 - 45

-

-

-

... More
Abv 45 - 60

-

-

-

... More
Abv 60 - 75

-

-

-

... More
Abv 75 - 125

-

-

-

... More
Abv 125 - 150

-

-

-

... More
Abv 150 - 300

-

-

-

... More
Abv 300 - 400

-

-

-

... More
Abv 400 - 600

-

-

-

... More
Abv 600 - 1000

-

-

-

... More
Abv 1000 - 1500

-

-

-

... More
Abv 1500 - 2000

-

-

-

... More
2. Uncoupling, removing the rotor, dismantling the slip ring assembly from the rotor, Machining, Skimming the slip rings, reassemble back and insulating various segments inclusive of to and fro transportation.

-

-

-

... More
Alternator rating in KVA

-

-

-

... More
Upto 03

-

-

-

... More
Abv 03 - 05

-

-

-

... More
Abv 05 - 10

-

-

-

... More
Abv 10 - 20

-

-

-

... More
Abv 20 - 25

-

-

-

... More
Abv 25 - 30

-

-

-

... More
Abv 30 - 45

-

-

-

... More
Abv 45 - 60

-

-

-

... More
Abv 60 - 75

-

-

-

... More
Abv 75 - 125

-

-

-

... More
Abv 125 - 150

-

-

-

... More
Abv 150 - 300

-

-

-

... More
Abv 300 - 400

-

-

-

... More
Abv 400 - 600

-

-

-

... More
Abv 600 - 1000

-

-

-

... More
Abv 1000 - 1500

-

-

-

... More
Abv 1500 - 2000

-

-

-

... More
3.Removing the alternator from Engine room to workshop and back.(55% of Sl. No. 1)

-

-

-

... More
4.Rewinding Charges PER KVA

-

-

-

... More
a) For Stator

-

-

-

... More
upto 10 KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
b) For Rotor

-

-

-

... More
Upto 10KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
Field Unit

-

-

-

... More
a) For Stator

-

-

-

... More
Upto 10 KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
b) For Rotor

-

-

-

... More
Upto 10 KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
Excitor unit

-

-

-

... More
a) For Stator

-

-

-

... More
Upto 10 KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
b) For Rotor

-

-

-

... More
Upto 10 KVA

-

-

-

... More
Above 10 KVA – 30 KVA

-

-

-

... More
Above 30 KVA

-

-

-

... More
NOTE: .All Alternators class “F” and above rewinding job and insulation improving works will be 20% cost extra on Sl. No. 1 above and for re-winding (sl no.4) above. Manufacturing certificate of rewinding wire to be provided.

-

-

-

... More
20 – 01, ALL TYPES OF COUPLINGS

-

-

-

... More
1.Mechanical Couplings:

-

-

-

... More
For Jet Pumps

-

-

-

... More
(a) Disconnecting and removing the coupling from position, and refittment and alignment of coupling after completion of the repairs. Coupling guard to fit back (If applicable).

-

-

-

... More
(b) (i) MS Building up and machining/grinding of pump parts (Per Kg)

-

-

-

... More
Renewal of complete coupling set (Coupling ship supply) Rs:

-

-

-

... More
2.Mechanical Couplings:

-

-

-

... More
For SW, FW & other Pumps

-

-

-

... More
(a) Disconnecting and removing the coupling from position, and refittment after completion of the repairs. Coupling guard to fit back (If applicable).

-

-

-

... More
(b) MS Building up and machining/grinding of pump parts (Per Kg)

-

-

-

... More
Renewal of complete coupling set Rs: (Supply of new coupling at cost extra)

-

-

-

... More
3. Pneumo-Flex Couplings: (Main Engine & Dredge Pumps Etc.)

-

-

-

... More
Main Engine & Dredge Pumps Etc. Disconnecting pneumatic pipe lines and ancillary items. Removal of complete coupling from the place. Dismantling , renewing the worn out parts, (brake friction pads and seals, O’ rings etc), Assembling, Fitting in place and connecting to the drives. Checking alignment and satisfactory trials to be shown to ship staff. Spares ship supply. Rs:

-

-

-

... More
4.(Jet Pump DR-XII / XIV) (Gear box coupled pneumaflex coupling)

-

-

-

... More
a) Disconnecting pneumatic pipe lines and ancillary items. Removal of complete coupling from the place, dismantling, renewing the worn out parts, brake friction pads, seals, O’ rings etc., fitting in place and connecting to the drives. Checking alignment and satisfactory trials to be shown.

-

-

-

... More
b) Renewal of complete coupling assembly with Spare / over hauled unit Rs:

-

-

-

... More
21 – 01 HYDRAULIC WINCHES & GEAR BOXES

-

-

-

... More
1) Hydraulic Winches: (Staffa / hytop / hydrowega)

-

-

-

... More
a) Removal & refittment of staffa motor along with alignment . (Quote should be inclusive of removal & blanking of hydraulic lines)

-

-

-

... More
b) Complete Hydraulic Winch Motor to disconnect from drum. Winch motor to dismantle (Clutch plate assembly / pistons, crank shaft etc.), defective parts / Bearings / Shaft / seals to renew, assemble Winch Motor, fit back in position and satisfactory trials to be given. (Spares Ship supply). (Cost of metal built up, machining and sleeves - extra)

-

-

-

... More
c) To make/procure and supply Hydraulic motor overhauling Service Kit. (Staffa / hytop / hydrowega)

-

-

-

... More
2).Gear Boxes: (Renk / lohman + stolt / craajeveld)

-

-

-

... More
L.O Pipe lines & drive shaft to isolate, oil to drain. Top cover to remove, along with accessories. Gear Train inspection and defective gears to renew / polish as per surveyors recommendations. Bushes / Bearings (ship supply) to renew, Crank case to clean before assembly. Fresh oil to take and satisfactory Trials to give (All Spares Ship supply). Cost of metal built up, machining and sleeves- extra.

-

-

-

... More
22 – 01, SAND PUMP AND JET PUMP SUCTION AND DISCHARGE PIPES

-

-

-

... More
1. Fabrication of straight and bend pipe including cost of material and supply at on board Dredger / at Project Office as per instruction of DCI. (If required Cost of old pipe Removal & Refit of new Pipe as per Sl No-4 below will be added)

-

-

-

... More
Inner Dia 300-599 mm

-

-

-

... More
a. For straight pipe - Rate per Kg. Rs:

-

-

-

... More
b. For bend pipe - Rate per Kg. Rs:

-

-

-

... More
Inner Dia 600-1000 mm

-

-

-

... More
a. For straight pipe - Rate per Kg. Rs:

-

-

-

... More
b. For bend pipe - Rate per Kg. Rs:

-

-

-

... More
2 a. Cropping old flange from existing pipe, gouging and welding it to pipe including jigging arrangements. (Rate per Kg. of Flange weight)

-

-

-

... More
b. Welding of new flange (ship supply) to pipe including jigging arrangements. (Rate per Kg. of Flange weight)

-

-

-

... More
3. a. Cropping & Renewing pipe in situ (part renewal) Rate per Kg. of renewal in situ – Rs:

-

-

-

... More
b. Fitment of doublers Rate per Kg. – Rs: ( Staging-5%, Extra for 3a & 3b above)

-

-

-

... More
4. Removal & refit of pipe from the place (also applicable for Sl no-1 above)/ Remove Pipe, Turn to 180 degrees and fit back in position. (including staging, rubber joints, remove/refit hydraulic line, flushing lines) Rate per meter – Rs:

-

-

-

... More
Inner Dia :300-599 mm

-

-

-

... More
Inner Dia: 600-1000 mm

-

-

-

... More
5.Manufacture and supply of the pipe flange (including machining, drilling of holes etc). Rate per Kg. of finished weight Rs:

-

-

-

... More
6.UT Gauge readings to be taken as per instructions and submit the report in triplicate on board vessel.

-

-

-

... More
a) 1 to 100 points Rate per point Rs:

-

-

-

... More
b) 101 to 500 points Rate per point Rs:

-

-

-

... More
c) 501 and above Rate per point Rs:

-

-

-

... More
Note: All pipe & flange material will be of MS and conforming to Lloyds ‘A’ grade steel.

-

-

-

... More
23 – 01, ELECTRICAL MISCELLANEOUS WORKS

-

-

-

... More
1.Renewing cable from switch board to different circuits including cable cost for laying and securing (inclusive of removal of existing cable & necessary obstacles If any)

-

-

-

... More
a) 3 core 5 amp

-

-

-

... More
b) 3 core 15 amps

-

-

-

... More
c) 3 core 25 amps

-

-

-

... More
d) 3 core 50 amps

-

-

-

... More
e) 3 core 65 amps

-

-

-

... More
f) 3 core 100 amps

-

-

-

... More
g) 4 core 65amps

-

-

-

... More
2.Renewal of plastic conduit / plastic bating (box / pipe )

-

-

-

... More
a) for 20mm dia

-

-

-

... More
b) for 25 mm dia

-

-

-

... More
c) for 37mm dia

-

-

-

... More
d) for 50mm dia

-

-

-

... More
3.Charging of battery (incl.removal from Ship and handing over back inclusive) battery upto 12 V, 200AH

-

-

-

... More
4. Overhauling and Calibration (excluding spares)

-

-

-

... More
a) Voltmeter

-

-

-

... More
b) Ammeter

-

-

-

... More
c) Frequency meter

-

-

-

... More
d) Power meter

-

-

-

... More
5.a) Renew Tube light fitting (where no staging is required) Rs.

-

-

-

... More
b) Renew Tube light fitting, Cost including staging (where staging is required to access) (Tube light fittings are ship supply) Rs.

-

-

-

... More
6.Rate for installation of new ISPS lights / Flood lights including cost of flood light (Marine standards)

-

-

-

... More
a) 100watt

-

-

-

... More
b) 200 watt

-

-

-

... More
c) 300 watt

-

-

-

... More
d) 400 watt

-

-

-

... More
e) 500 watt

-

-

-

... More
Note: If any item found BER, then only Labour charges towards collection, inspection etc. will be payable, on production of Work done certification of ship staff.

-

-

-

... More
24 – 01 , AC & Refrigeration Works

-

-

-

... More
1.Refrigerators, Drinking water coolers and domestic Fridges : Removing compressor, cutting the sealing unit, rewinding the stator, overhauling the sealed unit, welding the same and fitting in place:

-

-

-

... More
Up to 1/3 HP

-

-

-

... More
Up to ½ HP

-

-

-

... More
Up to 1 HP

-

-

-

... More
Up to 2 HP

-

-

-

... More
2.Refrigerators, Water coolers and Domestic Fridge : Pressure testing, gas charging and commissioning :

-

-

-

... More
a) Up to 1/2 HP

-

-

-

... More
b) Abv 1/2 HP - 2 HP

-

-

-

... More
3.Air – Conditioning Plant, Compressors :

-

-

-

... More
Scope of work : Dismantling the compressor, check condition of piston & rings, suction and discharge valve reeds, lapping valve plate, changing full set of gasket, cleaning all parts, boxing back compressor, charging with fresh oil and Freon–12 / Mafron-22, testing for efficiency on board (excluding the cost of Spares, Oil, Gases, materials and machining)

-

-

-

... More
Up to 5 HP

-

-

-

... More
b) Abv 05 HP - 10 HP

-

-

-

... More
c) Abv 10 HP - 25 HP

-

-

-

... More
d) Abv 25 HP - 50 HP

-

-

-

... More
e) Abv 50 HP - 75 HP

-

-

-

... More
4.Removing evaporator from Ship, transport to workshop, cleaning of evaporator and refitting on board : (Cost of chemical extra on C+)

-

-

-

... More
a) Up to 1/2 HP

-

-

-

... More
b) Abv ½ HP – 02 HP

-

-

-

... More
c) Abv 02 HP – 05 HP

-

-

-

... More
d) Abv 05 HP - 10 HP

-

-

-

... More
e) Abv 10 HP - 25 HP

-

-

-

... More
f) Abv 25 HP - 50 HP

-

-

-

... More
g) Abv 50 HP - 75 HP

-

-

-

... More
5.Condenser descaling, Domestic Fridge & A/C

-

-

-

... More
Scope of work : Dismantling both the covers, cleaning condenser with cane, testing for leaks under Freon Pressure, Boxing back with new jointing (excluding Cost of chemicals, Gases, materials).

-

-

-

... More
a) Up to 5 HP

-

-

-

... More
b) Abv 05 HP - 10 HP

-

-

-

... More
c) Abv 10 HP - 25 HP

-

-

-

... More
d) Abv 25 HP - 50 HP

-

-

-

... More
e) Abv 50 HP - 75 HP

-

-

-

... More
6.Pressure testing and Vacuumising :

-

-

-

... More
Scope of work: Pressuring the entire system with CO2 / Nitrogen flushing the same, testing for leaks and rectifying, Vacuumising the plant and keeping the same under vacuum for 12 hours for ensuring that there is no leakage.(Any brazing/soldering & cost of Nitrogen, materials will be extra )

-

-

-

... More
a) Up to 5 HP

-

-

-

... More
b) Abv 05 HP - 10 HP

-

-

-

... More
c) Abv 10 HP - 25 HP

-

-

-

... More
d) Abv 25 HP - 50 HP

-

-

-

... More
e) Abv 50 HP - 75 HP

-

-

-

... More
7.System Commissioning ;

-

-

-

... More
Scope of work: Gas charging the system, staring the plant, cleaning the expansion valve filters, purging the air from the system, adjusting all the control for proper setting, observing the plant and leaving the plant in good working condition (Cost of materials, gases if required will be extra)

-

-

-

... More
a) Up to 5 HP

-

-

-

... More
b) Abv 05 HP - 10 HP

-

-

-

... More
c) Abv 10 HP - 25 HP

-

-

-

... More
d) Abv 25 HP - 50 HP

-

-

-

... More
e) Abv 50 HP - 75 HP

-

-

-

... More
8. a) Supply of skilled Refrigeration / AC Mechanic : per day (8 Hrs Normal)

-

-

-

... More
b) .Assistant to Refrigeration / AC Mechanic : per day (8 Hrs Normal)

-

-

-

... More
c) For Mechanic in case of OT hours : per Hour

-

-

-

... More
d) Assistant in case of OT hours : per Hour

-

-

-

... More
e) Refilling of gas including cost of labour involved for offloading, transportation &returning to ship after refilling.

-

-

-

... More
i) Refilling of R22 gas – Rate per kg of gas

-

-

-

... More
ii) Refilling of R404A gas – Rate per kg of gas

-

-

-

... More
iii) Refilling of Oxygen cylinder - Rate per kg of oxygen

-

-

-

... More
iv) Refilling of Acetylene Cylinder – Rate per kg of gas

-

-

-

... More
9..Split AC 1 Ton / 1.5 Ton / 2 Ton / 3Ton

-

-

-

... More
i. Rates for General Cleaning & Servicing.

-

-

-

... More
ii. Rates for Split AC Pressure Testing, Rectifying leaks, Gas Charging and Commissioning (Spares, Gas C+).

-

-

-

... More
iii. Rate for renewal of new compressor

-

-

-

... More
-          Rate for 1 ton

-

-

-

... More
-          Rate for 1.5 ton

-

-

-

... More
-          Rate for 2 ton

-

-

-

... More
-          Rate for 3 ton

-

-

-

... More
iv. Rate for renewal of Outdoor Unit complete

-

-

-

... More
Upto 1 Ton Rs.

-

-

-

... More
1.5  Ton Rs.

-

-

-

... More
2 Ton Rs.

-

-

-

... More
3 Ton Rs.

-

-

-

... More
13.Removal, cleaning , and refitment of air conditioning/ air vent duct of following sizes (Rates per meter)

-

-

-

... More
(i)  125mm           

-

-

-

... More
(ii) 150 mm

-

-

-

... More
(iii) 175 mm

-

-

-

... More
14. Brazing of leaking refrigeration lines. Rate per location upto a pipe of 25mm OD

-

-

-

... More
25 – 01, MAKE & SUPPLY ITEMS (MS/ SS/ CS/CI/EN/GM/Mn)

-

-

-

... More
Manufacture and supply on board Vessel : (Rate per Kg of Finished product)

-

-

-

... More
1. Gun metal products (other than impelller)

-

-

-

... More
2. Brass Products

-

-

-

... More
3. GM Impeller (Cast Impeller)

-

-

-

... More
4.SS Products

-

-

-

... More
5. EN Products

-

-

-

... More
6. MS Products

-

-

-

... More
7. CI Products

-

-

-

... More
8.Cast Steel Products

-

-

-

... More
9. Chrome Steel Products

-

-

-

... More
10. Manganese Steel Products

-

-

-

... More
11. Bronze / Phosphorus Bronze

-

-

-

... More
12.Copper

-

-

-

... More
13. Nihard Products

-

-

-

... More
14.Aluminum Products

-

-

-

... More
15.Zinc

-

-

-

... More
16.Teflon product

-

-

-

... More
17. Sounding caps with chain as per statutory requirement, for various sounding pipes:

-

-

-

... More
a) brass

-

-

-

... More
b) S.S.

-

-

-

... More
18.Make and supply of Letters as per DCI requirement. Min 2kg payable. Weight on pro rata will be paid.

-

-

-

... More
Note: 1. The finished product includes all normal operations, however 5% extra will be considered against each operations like– grinding/ honing, keyway milling and threading etc which are considered as precision jobs for each product. 2. The weight of the finished product should be recorded in Work Done Certificate. 3. Minimum charges for 5 Kg. will be paid (except for sl.18 above) when finished product(s) weighs together (total quantity of 1 type of finished product) less than 5 Kgs irrespective of number of pieces made of that product. (Min 5 Kg weight is not applicable for standard bolts which are readily available in the market, for which actual market rate + 10% is payable) 4. Payment will be made on prorata basis, if the weight of finished product is more than 5 KG.

-

-

-

... More
26 – 01 (A) LSA, Lifeboat & Liferaft services Besides following items, service centres /providers may submit their competitive rates for other different scope of works. (Through only MMD approved workshops)

-

-

-

... More
(1) Life Boat

-

-

-

... More
DCI DREDGE VIII - VIKING MARINE

-

-

-

... More
(DR-XI /XII / XIV - Lifeboat: Mulder & Rijke, Winch & Davits: Schat-Davit Company, Hooks: Harding)

-

-

-

... More
DCI DREDGE XV- SHIPYARD GREBEN

-

-

-

... More
DCI DREDGE XVI/ XVII- ERNST HATECKE

-

-

-

... More
DCI DREDGE XVIII- AQUARIUS FIBERGLASS PVT. LTD

-

-

-

... More
(DR-XIX / XX / XXI - Lifeboat: Hatecke, Davits: Hatecke & Winch: Winch: Global Davit)

-

-

-

... More
DCI MUC1- ZODIAC/ AQUARIUS SHIPYARD

-

-

-

... More
DCI BH1- DSB

-

-

-

... More
Annual Inspection and Testing including Transportation, Lodging & Boarding etc.

-

-

-

... More
a) Open type lifeboat, Davit winch, release hook mechanism etc.

-

-

-

... More
b) Enclosed type lifeboat, Davit winch with off-load release hook mechanism

-

-

-

... More
c) Enclosed type lifeboat, Davit winch with on-load release hook mechanism

-

-

-

... More
(2) Lifeboat

-

-

-

... More
5 yearly inspection and testing including transportation, lodging, & boarding etc.

-

-

-

... More
a) Open type lifeboat, Davit winch, release hook mechanism etc.

-

-

-

... More
b) Enclosed type lifeboat, Davit winch with off-load release hook mechanism

-

-

-

... More
c) Enclosed type lifeboat, Davit winch with on-load release hook mechanism

-

-

-

... More
Life boat spares renewal

-

-

-

... More
a) Brake liner Renewal (Liners workshop supply)

-

-

-

... More
b) Push Pull cable fully enclosed life boat renewal

-

-

-

... More
c) Fall preventive device renewal

-

-

-

... More
d) Supply of bilge pump with hose

-

-

-

... More
Repairs

-

-

-

... More
Life boat repairs

-

-

-

... More
a) FRP (3 mm thickness) repairs per sq.mtr

-

-

-

... More
b) Wooden gratings renewal per sq mtr

-

-

-

... More
Life Raft

-

-

-

... More
(I) Ration / Per person

-

-

-

... More
(ii)Id tube (Each)

-

-

-

... More
(iii) Bk Band

-

-

-

... More
(v) Co2 recharge up to 300 BAR

-

-

-

... More
EEBD/SCBA Cyl./portable fire extinguisher/ liferaft collect,Transport from Vessel to w/shop & Delivery back to Vsl- (Cost for 1no. or batch)

-

-

-

... More
(For vessel at Kochi)

-

-

-

... More
(For vessel at Visakhapatnam)

-

-

-

... More
(For vessel at Mumbai)

-

-

-

... More
(For vessel at Chennai)

-

-

-

... More
(For vessel at Mangalore)

-

-

-

... More
(For vessel at Goa)

-

-

-

... More
(For vessel at Kolkata)

-

-

-

... More
(For vessel at Haldia)

-

-

-

... More
(For vessel at Paradip)

-

-

-

... More
26 – 01 (B) SERVICING OF LIFE RAFTS as per statutory requirement (Through only MMD approved workshops)

-

-

-

... More
DR-XV- JIANSU HAINING/ SHM SHIPCARE

-

-

-

... More
DCI DREDGE BH1 -VIKING DENMARK

-

-

-

... More
DCI DREDGE VIII / DREDGE XI / DREDGE XII / DCI MUC1- SHM SHIPCARE

-

-

-

... More
DCI DREDGE XVI - ZODIAC

-

-

-

... More
DCI DREDGE XVII / XVIII - SHANGHAI YOULONG RUBBER PRODUCTS

-

-

-

... More
DCI DREDGE XIX/XX/XXI- SURVITEC

-

-

-

... More
1.Services:

-

-

-

... More
a. Life Raft Basic Serving Rate per raft Rs.

-

-

-

... More
b. Container Painting & Stickering Rs

-

-

-

... More
c. HRU Servicing Rs.

-

-

-

... More
d. Pressure testing of Cylinder ( if required ) Rs. per Cylinder

-

-

-

... More
e. CO2 recharging ( if required ) Rs. per Kg.

-

-

-

... More
f. Container Repairs Rs. per Sq. Inch

-

-

-

... More
g. Life Raft Repairs Rs. per Sq. Inch

-

-

-

... More
2.Cost of Replacement:

-

-

-

... More
a. Parachute Rockets each Rs.

-

-

-

... More
b. Smoke Signals each Rs.

-

-

-

... More
c. Hand Flares each Rs.

-

-

-

... More
d. Emergency Ration ( ½ Kg. ) each Rs.

-

-

-

... More
e. Drinking Water ( 500 ml ) each Rs.

-

-

-

... More
f. First Aid Kit each Rs.

-

-

-

... More
g. Sealing Gasket each Rs.

-

-

-

... More
h. Reflective Tape per foot Rs.

-

-

-

... More
i. Sea cells each Rs.

-

-

-

... More
j. Inflation / Deflation valve each Rs.

-

-

-

... More
k. Fenders each Rs.

-

-

-

... More
Note: Workshop should be authorized by OEM/Quote should be inclusive of OEM Certification Charges. Life rafts are to be serviced and placed back on board vessel within the schedule time along with the certificates endorsed by the MMD. Surveyor inspection charges will be paid on cost plus basis.

-

-

-

... More
26 – 01 (B) SERVICING OF LIFE RAFTS (Through only MMD approved workshops)

-

-

-

... More
Servicing of liferafts to be carried out as per DGS circulars , Necessary documents, video, photos to be submitted as required.

-

-

-

... More
Unit

-

-

-

... More
1.Anti mould Treatment per raft

-

-

-

... More
2.Live Inflation Test of Life rafts per raft

-

-

-

... More
3.Ship’s Name Stenciling on the Raft per raft

-

-

-

... More
4.Floor Seam Test per raft

-

-

-

... More
5.Necessary Additional Pressure Test per raft

-

-

-

... More
Replacements/ Repairs / Renewals

-

-

-

... More
6.Emergency pack tape each

-

-

-

... More
7.Fishing Line with Hooks each

-

-

-

... More
8.Heliograph each

-

-

-

... More
9.High Pressure Hose each

-

-

-

... More
10.Holding Strap on Cradle each

-

-

-

... More
11.Canopy Light ( Inner ) each

-

-

-

... More
12.Canopy Light ( Outer ) each

-

-

-

... More
13.Container Nylon Band Renewal each

-

-

-

... More
14.Container Nylon Band Weak Link each

-

-

-

... More
15.CO2 Cylinder for 10 Persons each

-

-

-

... More
16.CO2 Cylinder for 12 Persons each

-

-

-

... More
17.CO2 Cylinder for 15 Persons each

-

-

-

... More
18.CO2 Cylinder for 20 Persons each

-

-

-

... More
19.Drinking Vessel each

-

-

-

... More
20.Emergency Pack Drum / Box / Bag each

-

-

-

... More
21.Anti Sea Sickness Tablets each

-

-

-

... More
22.Bailer each

-

-

-

... More
23.Bellow each

-

-

-

... More
24.CO2 Cylinder Inlet Valve – Renewal each

-

-

-

... More
25.CO2 Cylinder Inlet Valve – Repairs each

-

-

-

... More
26.CO2 Pocket Renewal each

-

-

-

... More
27.High Pressure Hose “T” Connection each

-

-

-

... More
28.High Pressure Hose “Y” Connection each

-

-

-

... More
29.Instruction Card each

-

-

-

... More
30.Life line each

-

-

-

... More
31.Leak Stopper each

-

-

-

... More
32.Neoprene Doubler for Painter Opening each

-

-

-

... More
33.Operating Head Renewal each

-

-

-

... More
34.Operating Head Sponge Cover Renewal each

-

-

-

... More
35.Painter Cord ( 36 m ) each

-

-

-

... More
36.Painter Flap ( Buford Type ) each

-

-

-

... More
37.Paddles each

-

-

-

... More
38.Polythene Liner each

-

-

-

... More
39.Rescue Signal Card each

-

-

-

... More
40.Torch Bulb each

-

-

-

... More
41.Torch Cells each

-

-

-

... More
42.Thermal Protective Aid each

-

-

-

... More
43.Valise each

-

-

-

... More
44.Whistle each

-

-

-

... More
45.Knife each

-

-

-

... More
46.Knife Pocket each

-

-

-

... More
47.Sea Anchor ( as per 83 convention ) each

-

-

-

... More
A. Over 10 Men

-

-

-

... More
B. Below 10 Men

-

-

-

... More
48.Sea Sickness Bags each

-

-

-

... More
49.Sponges each

-

-

-

... More
50.Sea Cell Plug each

-

-

-

... More
51.Seal Strip each

-

-

-

... More
52.Sponge Seal ( Gasket ) each

-

-

-

... More
53.Sea Cell Pocket Renewal each

-

-

-

... More
54.Torch each

-

-

-

... More
55.Rescue line with Quoit each

-

-

-

... More
56.Repair Kit each

-

-

-

... More
57.Rain Water Collectors each

-

-

-

... More
58.Radar Reflector each

-

-

-

... More
59.Radar Reflector Fitting Arrangement each

-

-

-

... More
60.HRU Diaphragm each

-

-

-

... More
61.HRU Spring each

-

-

-

... More
62.HRU Plastic Guard each

-

-

-

... More
63.HRU “D” Ring each

-

-

-

... More
64.HRU Shackle each

-

-

-

... More
65.HRU Sen house Slip each

-

-

-

... More
66.Weak Link ( Complete ) each

-

-

-

... More
67.HRU Fitting Charges each

-

-

-

... More
68.Nylon Security Belt for Life rafts – MTR each

-

-

-

... More
69.New Hydrostatic release unit each

-

-

-

... More
70.Water Pocket for Life raft each

-

-

-

... More
71.Operating Head Servicing each

-

-

-

... More
72.Anti-wick Treatment on painter cord each

-

-

-

... More
73.Bursting strips on container each

-

-

-

... More
74.CO2 Cylinder painting & stenciling each

-

-

-

... More
75.Relief Valve (New) each

-

-

-

... More
76.Relief Valve (Repair) each

-

-

-

... More
77.Repair Kit Solution Tube each

-

-

-

... More
78.Repair Kit Brush each

-

-

-

... More
79.Repair Kit Emery Cloth each

-

-

-

... More
80.Life rafts Dry cell each

-

-

-

... More
81.Instruction for various Emergency Items each

-

-

-

... More
82.Inflation / Deflation Plug each

-

-

-

... More
27 – 01, CO2 CYLINDERS & FIRE EXTINGUISHERS (Through only MMD approved workshops)

-

-

-

... More
1.Fixed CO2.: Remove Cyl, Check weight and refill gas (cost extra), certify correct gas weight in each Cylinder of 45 KG capacity (Minimum charge as per sl no.2 below is payable)

-

-

-

... More
a) if Vessel berthed alongside Rate per Cyl

-

-

-

... More
b) If Vessel in Anchorage Rate per Cyl

-

-

-

... More
2.Minimum charges to carryout work onboard,(for Sl No-1 above)

-

-

-

... More
if Vessel has less than 30 Cyl. (Lumsum rate) : Min Total Rate/ Batch

-

-

-

... More
(Only ONE Cost at Sl no 1 or Sl no.2)

-

-

-

... More
3.a) Refilling of CO2 Cyl at filling station (disconnection of Cylinders from ship, shifting out of ship and transport to filling station and refit back onboard etc.) , Cyl of 45 KG capacity Rate per Cyl

-

-

-

... More
b) Hydraulic Test of Cyl. of 45 KG capacity Rate per Cyl

-

-

-

... More
c) Renewal of each flexible hoses (IRS approved with test certificates) with end fittings including cost of hose . -------Rate per Hose

-

-

-

... More
d) Hydro Pressure (LP) Testing complete Lines of Co2 System. Lumpsum Rate.

-

-

-

... More
e) Hydro Pressure(HP) Testing complete Lines of Co2 System. Lumpsum Rate.

-

-

-

... More
f) Hydro Pressure Testing Lines (LP/HP) (Cost for ONE/Single line/ Servicing of Relief Valve etc.) (LP=150 BAR, HP= 151 BAR & Above) Rs.

-

-

-

... More
g) Overhauling of CO2 cylinder head assembly / unit Rs

-

-

-

... More
h) Overhauling and testing of CO2 Actuators / Pilot cylinder Rate per unit Rs

-

-

-

... More
i) Overhauling and testing of CO2 non –return valve Rate per unit Rs

-

-

-

... More
j) Blow through CO2 Pipe lines ( Complete LP & HP lines of CO2 system )

-

-

-

... More
k) Air test of main CO2 manual – Rate per set

-

-

-

... More
l)Servicing of complete CO2 system and alarm check

-

-

-

... More
m)CO2 cartridge weighment – per unit

-

-

-

... More
n).Repair / renewal cost extra as applicable on cost plus basis

-

-

-

... More
o)Fire line relief valve overhauling –per unit

-

-

-

... More
p)Foam compound analysis -per unit

-

-

-

... More
4.Breathing apparatus:

-

-

-

... More
a) Service of SCBA/EEBD Bottles including weighment. Rs.

-

-

-

... More
b) Pressure test Bottle including Valve Rs.

-

-

-

... More
c) Refill to its Capacity

-

-

-

... More
d) Servicing of Face Mask Set

-

-

-

... More
5.Calibration :

-

-

-

... More
a) Pressure gauges - upto 100 BAR/

-

-

-

... More
b) Pressure gauges upto 101 to 500 BAR

-

-

-

... More
c) Calibration of Temperature gauges/ Amp Meter/KW meter etc. - for 1 No.

-

-

-

... More
d) Calibration of IOPP/Oil content meter/Bilge Oil separator etc

-

-

-

... More
Note: A video recording of five years’ and ten years’ maintenance of Fire fighting appliance are to be kept readily available at Fire Fighting Appliance servicing station. Such video recording may be verified by the surveyor during next inspection by MMD/DGS (as per DGS circular no. 1 of 2022)

-

-

-

... More
6. Medical oxygen cylinder

-

-

-

... More
a)Hydro Pressure Testing

-

-

-

... More
b) Refill of cylinder(Air purity certificate to be submitted and charges for the same will be considered inclusive in quote)

-

-

-

... More
7. a) Portable Fire extinguisher horn/ nozzle/diffuser to be renewed.

-

-

-

... More
b) Portable fire extinguisher hose to be renewed

-

-

-

... More
8. Servicing of portable Liquid/DCP fire extinguishers and certification through MMD approved/authorized workshop/service provider to quoted as below table;

-

-

-

... More
9.Type of fire extinguisher

-

-

-

... More
A)2 kg DCP

-

-

-

... More
i)Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii)HP testing

-

-

-

... More
Cost of cartridge

-

-

-

... More
B).5kg DCP

-

-

-

... More
i)Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
C) 5 kg CO2

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
D) 6.5 kg CO2

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
E) 9 kgCO2

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
F) 45 kg CO2

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
F) 9 litre AFFF

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
G) 45 litre AFFF

-

-

-

... More
i) Annual servicing

-

-

-

... More
ii) Refilling

-

-

-

... More
iii) HP testing

-

-

-

... More
iv) Cost of cartridge

-

-

-

... More
28 – 01, ALL GANTRIES

-

-

-

... More
1. DRAG HEAD AND INTERMEDIATE GANTRIES

-

-

-

... More
a). Gantry heel pins to be renewed with ship supply spares. Rate per pin:

-

-

-

... More
b) Bush to renew (Ship supply) Rate per Bush Rs:

-

-

-

... More
c) Manufacturing of gantry heel pins size 170mm dia 257mm long out of C-35 material with greasing provision as per sample. Rate per pin:

-

-

-

... More
2. SUCTION TUBE ON DECK

-

-

-

... More
1.a) Dismantle/Removing the turning gland from pipes/ position and dismantling the turning gland. Thoroughly cleaned, overhauled and fitted back with new “L” ring. “L” ring including staging & supports for securing the suction tube & removing supports after completion of work & Spares ship supply. Rate for O/H:

-

-

-

... More
b) Turning gland flange (two halves) internal surface to be built up and Machined to size (Metal built up Cost Extra as per 16.01 rates) Rate per flange Set machining (2 half): Rs.

-

-

-

... More
2. Renewal of rubber bellow 700-1000mm dia Rate per bellow:

-

-

-

... More
3. Renewal of Jet hose 300 to 350mm dia

-

-

-

... More
a) Long Rate per Hose:

-

-

-

... More
b) Short Rate per Hose:

-

-

-

... More
4. Overhauling/renewal of complete Gimble ring assembly, including dismantle & assy of 2 fork arms pipes and its Pins & bushes (Spares Ship supply). Rate per Gimble ring complete Assy:

-

-

-

... More
5. Removal & refitting/renewal of One Fork Arms Pipe, incl its Pins & bushes (Spares Ship supply) Rate per Arm:

-

-

-

... More
6. Rate for insitu renewal of one pin & three buses of Fork arm / gymble ring. (1 set).

-

-

-

... More
3. SUCTION BEND GANTRY

-

-

-

... More
1. Overhauling / renewal of gantry heel pin and gantry top pins / bushes with proper greasing arrangements Rs:

-

-

-

... More
2. Rate for overhauling complete Gantry with ship supply pins / bushes. Rs:

-

-

-

... More
3. Rate for only renewal of one pin & two bushes. (1 set) Rs:

-

-

-

... More
4.SUCTION BEND

-

-

-

... More
Suction bend to be shifted from place after disconnecting from suction rubber hose if required, two halves retaining flanges to remove after opening studs/nuts & fit back. Fitted inner & outer L-ring from sliding piece-suction bend to be removed and renew with new one & all arrangements to fit back (Inner & Outer L-Ring ship supply). Rate to include all rigging/staging arrangements. Rate for renewal of suction bend & sliding piece inner & outer L-ring. Rs.

-

-

-

... More
1. Rates for renewal of overflow duct seal external in hopper (seal ship supply).

-

-

-

... More
2. Rates for renewal of jet discharge nozzle inside hopper (including staging, nuts & bolt) (nozzle ship supply)

-

-

-

... More
CRANES & LADDERS

-

-

-

... More
1. Annual examination of Loose Gears & Lifting Appliances/ Crane Appliances/Chain blocks/D-shackle including sheave, swivel, hook. (inclusive of necessary certification/endorsement in chain register)

-

-

-

... More
Upto 1 ton

-

-

-

... More
Above 1T – 3T

-

-

-

... More
Above 3T – 5T

-

-

-

... More
Above 5T – 10T

-

-

-

... More
Above 10T – 15T

-

-

-

... More
Above 15T – 20T

-

-

-

... More
2.) 5 Yearly Load Testing of Loose Gears & Lifting Appliances including sheave, swivel, hook.

-

-

-

... More
Upto 1 ton

-

-

-

... More
Above 1T – 3T

-

-

-

... More
Above 3T – 5T

-

-

-

... More
Above 5T – 10T

-

-

-

... More
Above 10T – 15T

-

-

-

... More
Above 15T – 20T

-

-

-

... More
3.Load Testing of Embarkation Ladder.

-

-

-

... More
4.Load Testing of MOT Ladders.

-

-

-

... More
Note: Valid approval of Competent Person to be provided while executing job.

-

-

-

... More
PLUMBING & CARPENTARY JOB

-

-

-

... More
1.INSULATION & CEILING WORKS:

-

-

-

... More
a) Removal and fitting back of roof ceiling (per. sq.m) Rs.

-

-

-

... More
b) Removal and fitting back of bulk head paneling (per. sq.m) Rs.

-

-

-

... More
2.WASH BASIN, PIPES & TAPS:

-

-

-

... More
a) Renewal of wash basin (22"x18")

-

-

-

... More
b) Renewal of wash basin brackets (pair)

-

-

-

... More
c) Renewal of wash basin drain pipe with 'P' trap.

-

-

-

... More
d) Renewal of wash basin taps ½”

-

-

-

... More
e) Renewal of ½” stop cock (with end fittings)

-

-

-

... More
f) Renewal of shower valve 13mm with end fitting

-

-

-

... More
g) Renewal of hot and Cold water mixing valve.

-

-

-

... More
h) Renewal of Bathroom Mirror

-

-

-

... More
i) Renewal of sanitary line cistern with fittings

-

-

-

... More
j) Renewal of commode health faucet with fittings

-

-

-

... More
k) Renewal of bath shower (fixed) with fittings

-

-

-

... More
l) Renewal of bath shower (hand) with fittings, pipe

-

-

-

... More
m) Renewal of SS washing sink with fittings

-

-

-

... More
n) renewal of commode seat cover

-

-

-

... More
o) Renewal of connection pipe (half meter) with fittings

-

-

-

... More
p) Renewal of ½” CU Pipe of Hot / Cold water (per. mtr.)

-

-

-

... More
q) Renewal of soap tray

-

-

-

... More
r) Repair of water tap including spindle, spares.

-

-

-

... More
3. RENEWAL OF WATER TIGHT DOOR RUBBER PACKING (PER MTR)

-

-

-

... More
a) 32X20 mm

-

-

-

... More
b) 40X20 mm

-

-

-

... More
c) 40X25 mm

-

-

-

... More
d) 50X20 mm

-

-

-

... More
e) 50X25 mm

-

-

-

... More
4.RENEWAL OF HATCH COVER PACKING (Per Meter)

-

-

-

... More
a) 75X30 mm

-

-

-

... More
b) 90X50 mm

-

-

-

... More
5.DOORS, LOCKS & KEY JOBS:

-

-

-

... More
a) Make & Supply Cabin Door Night Latch Key/ Normal Door Lock Key

-

-

-

... More
b) Supply & fit New Godrej Mortise Lock alongwith Complete Handle Set

-

-

-

... More
c) Supply and Fit Cabin Door Lock Handle

-

-

-

... More
d) Supply and fit almirah, cupboard, table drawer lock.

-

-

-

... More
e) Supply & fit hydraulic door closer Godrej

-

-

-

... More
f) Renewal of ECR / Freezer Room door packing (per door)

-

-

-

... More
g) Renewal of GI Sheet of doors (per. sq. m.)

-

-

-

... More
h) Renewal of Cabin / Bathroom door hinge (each hinge)

-

-

-

... More
i) Repair Cabin Door Cylinder Lock/Night latch including parts.

-

-

-

... More
j) Repair Freezer Room / ECR Lock including parts.

-

-

-

... More
k) Repair Hydraulic Door closer

-

-

-

... More
l) Repair of door hinge / latch

-

-

-

... More
6. PLYWOOD WORKS:

-

-

-

... More
Renewal of Marine Grade plywood IS:710 (per. sq. m). Make: Century/GreenPly

-

-

-

... More
a) Upto 6 mm thickness

-

-

-

... More
b) Upto 10 mm thickness

-

-

-

... More
c) Upto 15 mm thickness

-

-

-

... More
d) Upto 20 mm thickness

-

-

-

... More
e) Upto 25 mm thickness

-

-

-

... More
7.Rates for supply of plumber for plumbing jobs: per day

-

-

-

... More
8.Rates for supply of carpenter for carpentry jobs: per day

-

-

-

... More
Note: No overtime & shifts will be applicable.

-

-

-

... More
MAKE & SUPPLY OF HYDRAULIC HOSES

-

-

-

... More
Cost for Reinforced/braided hi-pressure Hydraulic Hose with end fittings (min 1 mtr.)

-

-

-

... More
Working Pressure (bar) Upto 50 bar

-

-

-

... More
Rate per meter for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -8 mm dia

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -30

-

-

-

... More
Rate per meter for make & supply of hose with stainless steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -8 mm dia

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -30

-

-

-

... More
Rate per meter for make & supply of hose with SS/Galvanised bend fittings

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -8 mm dia

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced/braided Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 100 bar

-

-

-

... More
Rate per meter for make & supply of hose with SS/galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced /braidedHydraulic Hose -8 mm dia

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
I.D of Reinforced Hydraulic Hose -40

-

-

-

... More
I.D of Reinforced Hydraulic Hose -50

-

-

-

... More
Rate per meter for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
I.D of Reinforced Hydraulic Hose -40

-

-

-

... More
I.D of Reinforced Hydraulic Hose -50

-

-

-

... More
Rate per meter for make & supply of hose with SS/Galvanised steel bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8 mm dia

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
I.D of Reinforced Hydraulic Hose -40

-

-

-

... More
I.D of Reinforced Hydraulic Hose -50

-

-

-

... More
Working Pressure (bar) Upto 150 bar

-

-

-

... More
Rate per meter for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
I.D of Reinforced Hydraulic Hose -40

-

-

-

... More
I.D of Reinforced Hydraulic Hose -50

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 200 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 250 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Note : Above 30mm dia shall be paid at Pro-rata basis.

-

-

-

... More
MAKE & SUPPLY OF HYDRAULIC HOSES

-

-

-

... More
Cost for Reinforced hi-pressure Hydraulic Hose with end fittings (min 1 mtr.)

-

-

-

... More
Working Pressure (bar) Upto 300 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 350 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 400 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Working Pressure (bar) Upto 500 bar

-

-

-

... More
Rate for make & supply of hose with galvanized steel coupling end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with galvanized steel flange end fitting (Min 1 Mtr)

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Rate for make & supply of hose with MS bend fittings

-

-

-

... More
I.D of Reinforced Hydraulic Hose -8

-

-

-

... More
I.D of Reinforced Hydraulic Hose - 10

-

-

-

... More
I.D of Reinforced Hydraulic Hose -12.5

-

-

-

... More
I.D of Reinforced Hydraulic Hose -16

-

-

-

... More
I.D of Reinforced Hydraulic Hose -19

-

-

-

... More
I.D of Reinforced Hydraulic Hose -25

-

-

-

... More
I.D of Reinforced Hydraulic Hose -30

-

-

-

... More
Per mtr rate may be quoted. Pro rata will be paid depending on the length of hydraulic hose.

-

-

-

... More
29 – 01, TANK CLEANING

-

-

-

... More
1.) F.W / BALLAST TANKS/ DECANTATION/BUFFER TANKS/CENTRAL KEELSON

-

-

-

... More
a) Clearing Mud / Muck & Disposing to shore / Hopper Rate Per Ton of Material Removed (Min. 10 Tons payable)

-

-

-

... More
b) Chipping, scrapping & cleaning of Tank.

-

-

-

... More
1) = Rs.------ (Min.10 T payable)

-

-

-

... More
2) = Rs.------ (Min.10 mtrs Sq payable) (Rate Per Square Meter of Tank Area)

-

-

-

... More
c) Cement Washing 2 coats with Cost of materials.

-

-

-

... More
Rate Per Square Meter of Tank Area

-

-

-

... More
1) = Rs.----- (Min.10 T payable)

-

-

-

... More
2) = Rs--- (Min.10 mtrs Sq payable)

-

-

-

... More
2.) FO / LO TANKS

-

-

-

... More
a) Clearing of Fuel Oil, Lub Oil, Sludge etc from tank to shore bins 1) Rate per ton of material removed Rs:

-

-

-

... More
1) = Rs.--- (Min.10 T payable)

-

-

-

... More
b) Cleaning and moping dry with cloth 1. Rate Per Square Meter of Tank Area

-

-

-

... More
1) = Rs---- (Min.10 mtrs Sq payable)

-

-

-

... More
Note: Charges for gas free certificate = Actual charges paid to Inspector plus 10% extra. (Fixed)

-

-

-

... More
3.) BILGES IN E/R & P/R :

-

-

-

... More
a) Clearing of Mud, Muck, Oil sledge, and Removal of Oil Rate per ton of material removed Rs: (Min.10 Tons payable)

-

-

-

... More
b) Scrapping / Cleaning Rate per sq. meter Rs: = Rs.------ (Min.10 mtrs Sq payable)

-

-

-

... More
4.) Painting works on Main Deck, Hopper Deck, Hydraulic cylinders, Accommodation etc., as per requirement including chipping, scrapping and applying one coat of primer (Paints ship supply), including cost of labour and Staging.

-

-

-

... More
5.) Staging works (scaffolding material) per sq.mtr. Work done certificate should clearly reflect sq.mtr. Min. 5sq.mtr will be paid.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.