Andhra University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Building Construction
Opening Date2 Aug 2021
Closing Date9 Aug 2021
Tender Amount₹ 1,42,46,366 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹51,000/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;S & F NP soap dish heavy type with NP SCREWS

12

-

2902

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing the in position of 38.10mm cp Long body taps fancy type dulex indian make heavy type

24

-

14916

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing in position TV shape mirrors of plastic frame 606x457.2mm sixe with screws etc complete

16

-

9060

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply & fixing towel rod (CP) of 24" long and 3/4 " dia

12

-

4650

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

16

-

30788

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 8 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and fixed using required size of nails and screws, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

12

-

52245

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Cowls ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers For 75 mm PVC Cowls

4

-

55

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Cowls ISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers For 110 mm PVC Cowls

4

-

73

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing the 4" (101.6 mm ) Nahany Trap

20

-

2773

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Door TeeISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers For110 mm dia - Single Tee with Door

10

-

1250

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Door TeeISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers for 110 mm dia - Door Bend 87.5 Degree

20

-

2068

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Door TeeISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers for 110mm dia - Plain Bend 87.5 Degree.

40

-

3182

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Door TeeISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers For 75 mm dia - Door Bend 87.5 Degree.

15

-

972

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of PVC Door TeeISI make including cost, all taxes, conveyance of all materials to site and labour charges for all operations such as cutting to required size, jointing with PVC adhensive etc., complete as per SS and as directed by the Departmental officers for 75 mm dia - Plain Bend 87.5 Degree.

30

-

1432

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying and fixing of SWR PVC pipes75 mm pvc (Prince/Sudhakar/Kisan/Supreme or any ISI brand)4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) For 75 mm dia PVC Pipe .

80

-

16240

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying and fixing of SWR PVC pipes75 mm pvc (Prince/Sudhakar/Kisan/Supreme or any ISI brand)4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) For 110 mm dia PVC Pipe .

120

-

36084

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 40mm NB Size.

4

-

9916

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

120

-

57071

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

80

-

19488

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Chequred terrazed tiles 20mm thick over base plasteing in cm(1:5) mix 20mm thick with half round the edges with necessary colour pigments etc complete as directed by the department

42

-

39516

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing stainless steel handrailing with 316 grade 16 guage 50mm top hand rail ,40mm dia vertical support and 25mm dia horzintal two lines as per the approved pattern and design as directed by the site Engineers for hand railing of 914mm (36") height above the finished for level including cost of materials and convencey to site vat txes and labour charges for all opertations etc as per such as fabrication of hand rail drilling of holes in R.c.c steps and finishing of handrail leg reconnection etc complete for finsihed item of work .The SS steel of 316 grade with lab test certificate shoud be prodieded as directed by the department.

60

-

228000

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Painting with plastic emulsion paint of grade-1 standard make to exterior / interior faces of new walls two coat of approved make shade , single coat of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

600

-

39642

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to ironworks etc complete APSS No 1201,1202rk.

160

-

28671

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Enamel Painting two coats over base coat of primer paint with best quality of paints i,e, Asian, Berger paints. to New wood works etc complete APSS No 1201,1202

160

-

29684

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

2000

-

90360

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Painting with plastic emulsion paint of grade-1 standard make to exterior / interior faces of new walls two coat of approved make shade and colour over primer coat with cement primer grade - I including cost and conveyance of materials like Plastic Emulsion paint, white cement to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Plastic Emulsion etc., complete for finished item of work (APSS No.910, 911&1201) in all floors.

4000

-

768360

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of 0.5mm G.I. Sheet roof with necessary screws ,washers etc.,complete.

16

-

13816

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing of 50 x 50 x 2.6mm dia M.S.Box sections with necessary fabrication charges, transport, labour charges for roof.

140

-

14888

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Labour charges for fixing of existing G.I. Sheet roof with necessary screws ,washers etc.,complete.

24

-

8387

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Labour charges fixing of 50mm dia M.S.Pipes with heavy gauge with necessary fabrication charges, transport labour charges for roof.

34

-

3624

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. 20mm thick (average) mixing with water proofing compound from reputed manufacturers as approved by Engineer-in- charge at 1 Kg/bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cm x 45cm including cost and conveyance of materials like cement, sand (screened), water proofing compound etc., to site, cost of seigniorage charges and all other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work (APSS No. 901 & 903)

600

-

372630

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering

480

-

219188

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Brick masonry 290x225x140mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).

52

-

436646

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;VRCC M30 Grade design mix using 20mm and 12mm size HBG metal machine crushed hard granite metal (coarse agreegate) from approved quarry including cost, Seigniorage and conveyance of all materials and water from approved sources to work site and all operationsal and incidental labour charges for all operations such as centereing, Scaffolding, machine mixing, laying, pocking, vibrating, tamping and curing concrete, etc., complete for finished item of work as per SS.402 but excluding cost of steel and its fabrications charges for finished item of work. Columns up to slab level Steel Centering

2

-

28214

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Chequred terrazed tiles 20mm thick over base plasteing in cm(1:5) mix 20mm thick with half round the edges with necessary colour pigments etc complete as directed by the department

27

-

24215

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

14500

-

960625

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying & fixing SINGLE PANEL 30 mm thick PVC DOOR, door shutters with shutter frame and Infill panelmade from PVC material, the shutter frame made out oPVC extruded sections having overall dimensions of 60mm x 30 mm with wall thickness of 1.3 mm ?} 0.3 mm,with the Infill panel made out of multi chambered seamlesshollow PVC extruded panel having overall dimensions of610 mm x 20 mm having wall thickness 1 mm 0.2 mmwith the shutter frame meter cut and joined at corners andall the hardware locations reinforced with specialpolymeric bars as per drawing including providing specialPVC braket on hinge side, etc complete

20

-

75149

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing Alluminum Lours with 4mm thick glass panes.

5

-

9000

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing & Fixing of M.S.Iron grills to windows @ 16 kgs per sq.m.

29

-

48174

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing Alluminium glazed windows with locking arrangements.

29

-

104400

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing and fixingin position country wood door with fiush shutter using sal wood fordoor frame and flush door shutter solid bond wood block board type with commercial ply on both faces 35 mmthick conforming tois 2202 fixing teak wood beading alround the shutter forlipping and fixing theframe in to the masonry by means of z hold fasts heavy type screwed down to the frame with necessery nf screws of not less than 5cmin length with necessery ms powder coated butt hinges door stopper aluminium aldrop aluminium tower bolts door handles

40

-

163380

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing ornamental red brick Jalies 50mm thick with necessary materials etc complete as directed by the department

15

-

15750

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing dadooing to walls with glazed coloured tiles 600x300mm 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work.

200

-

250332

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Flooring with ceramic tiles 7.30mm thick ,of size 300x300mm 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)

70

-

73041

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Flooring / treads with Double chared vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size 600 mm x 600 mm , 8mm to 10mm thick , normal colour with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707)

510

-

679887

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Ferro Cement Planks 32mm thick with necessary steel reinforcement etc.

60

-

20822

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering

1650

-

695013

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for ceiling plastering

851

-

383887

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Brick masonry 290x225x140mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).

165

-

1297994

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 18cm thick slab (Wooden Centering)

75

-

121338

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 12.5cm thick slab

600

-

758982

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Roof Beams (Wodden Centering)

34

-

358220

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 6.5cm thick sunshades (Wooden Centering)

60

-

66419

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels (Wooden Centering)

2

-

23920

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Columns (Steel Centering)

16

-

214524

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Chequred terrazed tiles 20mm thick over base plasteing in cm(1:5) mix 20mm thick with half round the edges with necessary colour pigments etc complete as directed by the department

27

-

23026

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

14000

-

904260

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying & fixing SINGLE PANEL 30 mm thick PVC DOOR, door shutters with shutter frame and Infill panelmade from PVC material, the shutter frame made out oPVC extruded sections having overall dimensions of 60mm x 30 mm with wall thickness of 1.3 mm ?} 0.3 mm,with the Infill panel made out of multi chambered seamlesshollow PVC extruded panel having overall dimensions of610 mm x 20 mm having wall thickness 1 mm 0.2 mmwith the shutter frame meter cut and joined at corners andall the hardware locations reinforced with specialpolymeric bars as per drawing including providing specialPVC braket on hinge side, etc complete

20

-

75149

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing Alluminum Lours with 4mm thick glass panes.

5

-

9000

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing & Fixing of M.S.Iron grills to windows @ 16 kgs per sq.m.

29

-

48174

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supply and fixing Aluminium wood glazed windows with iron and alluminium furniture.

29

-

104400

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing and fixingin position country wood door with fiush shutter using sal wood fordoor frame and flush door shutter solid bond wood block board type with commercial ply on both faces 35 mmthick conforming tois 2202 fixing teak wood beading alround the shutter forlipping and fixing theframe in to the masonry by means of z hold fasts heavy type screwed down to the frame with necessery nf screws of not less than 5cmin length with necessery ms powder coated butt hinges door stopper aluminium aldrop aluminium tower bolts door handles

40

-

163380

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing ornamental red brick Jalies 50mm thick with necessary materials etc complete as directed by the department

15

-

15750

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing dadooing to walls with glazed coloured tiles 600x300mm 1st quality of size approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., complete for finished item of work.

200

-

241118

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Flooring with ceramic tiles 7.30mm thick ,of size 300x300mm 1st quality and of size as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand , water and tiles etc., complete including seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707)

70

-

69816

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Flooring / treads with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size 600 mm x 600 mm , 8mm to 10mm thick , normal colour with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707) in First Floor

510

-

656386

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Ferro Cement Planks 32mm thick with necessary steel reinforcement etc.

60

-

20006

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for internal plastering

1650

-

636570

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in single coat in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) for Ceiling plastering

851

-

349430

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Brick masonry 290x225x140mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash lime solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).

165

-

1210497

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in CM(1:3) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903) Ceiling

20

-

7553

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Masonry for panel walls in superstructure with CM (1:6) prop: (cement : sand) using Fly ash lime solid blocks of size 290mm X 225mm X 140mm and having minimum crushing strength of 75 Kg/Sqcm and using flyash of 80 kgs, cement of 15 kgs, Gypsum of 5 kgs and stone dust for manufacturing of Fly ash lime solid blocks including cost and conveyance of all materials like cement, sand, fly ash solid blocks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

5

-

34030

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for 18 cm thick Slab (Wodden centering)

40

-

59928

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Roof Beams (Wooden centering)

3

-

29108

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Plinth Beams (Wooden centering)

1

-

11306

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Filling with borrowed earth by lorries including Consolidations at 15cm layers watering etc complete as directed by Engineer Incharge

20

-

10070

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Filling with excavated earth including Consolidations at 15cm layers watering etc complete as directed by Engineer Incharge

30

-

1036

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing R.R Masonary in cm(1:6) using rough stone etc complete for foundations and basement.

6

-

22603

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Design Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Column (Steel Centering)

1

-

11061

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) for Column bases (Wooden centering)

3

-

25914

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying, diluting and injecting chemical emulsion for pre -constructional Anti termite treatment a continuous chemical barrier under and all round column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment ). Using Chlorphriphos Emulsifiable concentrate 20% with 1% concentration.

30

-

5113

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 40mm size (SS5) hard,machine crushed granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)

4

-

15277

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Earth work excavation for foundations (Mechanical Means) of buildings in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

30

-

3048

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 18 cm thick slab (Wooden Centering)

75

-

116851

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 12.5cm thick slab

600

-

730002

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Roof Beams (Wodden Centering)

34

-

344025

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 6.5cm thick sunshades (Wooden Centering)

60

-

63281

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Lintels (Wooden Centering)

2

-

22843

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Vibrated Reinforced Cement Concrete M-30 Mix as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffolding with props and steel plate as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For Columns (Steel Centering)

16

-

203315

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Removing the existing plastering and clearing the same of 20mm thick.

600

-

5250

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Dismantling the Brick masonry and clearing the same

5

-

1203

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Removing the existing G.I.Sheet roof care fully for reuse.

30

-

2595

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Dismantling the Rein forced Concrete and clearing the same.

10

-

28861

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Chequred terrazed tiles 20mm thick over base plasteing in cm(1:5) mix 20mm thick with half round the edges with necessary colour pigments etc complete as directed by the department

27

-

21837

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work

1200

-

75504

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Providing Ellies pattern flooring in c.c (1:1:2) mix using 10mm to 12mm size HBG Metal incluidng ondu finishing.

20

-

7861

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Flooring / treads with Double charged vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size 600 mm x 600 mm , 8mm to 10mm thick , normal colour with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., complete for finished item of work. (APSS No.701 & 707) in Ground Floor

30

-

37229

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 20mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)

20

-

7279

... More
Proposed construction of first an second floors for Pharmacy Girls hostel block and extension of gro;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work(APSS No. 901 & 903)

60

-

21023



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.